Quote:
Originally Posted by Jaws View Post
Fingers crossed. I still miss Vista 33.
Vista 33 fed my skyscraper dreams back in the 70s. Should have just asked for a seasons pass, although I don't recall it costing that much to access.
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #2642  
Old Posted May 26, 2016, 8:21 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,518
Quote:
Originally Posted by Daveography View Post
Out of curiosity, where the heck are the elevator shaft penetrations for the Stantec tower?
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #2643  
Old Posted May 26, 2016, 8:23 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
I could be wrong, but they look to be those 2 just west. Likely parkade to main/podium and then other shafts from main up.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #2644  
Old Posted May 26, 2016, 9:02 PM
Daveography's Avatar
Daveography Daveography is offline
Klatuu Barada Nikto
 
Join Date: Sep 2007
Location: The Island of Misfit Architecture
Posts: 4,483
Quote:
Originally Posted by Coldrsx View Post
Killer shot mang.
Thanks...I may have wandered into a "fall protection equipment required beyond this point" area to get it.
     
     
  #2645  
Old Posted May 26, 2016, 9:04 PM
Daveography's Avatar
Daveography Daveography is offline
Klatuu Barada Nikto
 
Join Date: Sep 2007
Location: The Island of Misfit Architecture
Posts: 4,483
Quote:
Originally Posted by s211 View Post
Out of curiosity, where the heck are the elevator shaft penetrations for the Stantec tower?
The lines of rebar are they.

Apparently those shafts aren't servicing the lowest parkade level. Could be they will only service the tower, and parkade elevators will be the ones in the podium.
     
     
  #2646  
Old Posted May 26, 2016, 9:08 PM
Kevin_foster's Avatar
Kevin_foster Kevin_foster is offline
Kevin Folds Five
 
Join Date: Jan 2005
Location: Edmonton, Canada
Posts: 6,072
Maybe there just wont be elevators in Stantec's new office tower. Elite athletes only will work on the top 50 floors.
__________________
I used to be indecisive, but now I'm not sure...
     
     
  #2647  
Old Posted May 26, 2016, 9:14 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Quote:
Originally Posted by Daveography View Post
The lines of rebar are they.

Apparently those shafts aren't servicing the lowest parkade level. Could be they will only service the tower, and parkade elevators will be the ones in the podium.
Your elevator pits will still go all they way down, even if they don't serve the parkade levels.

The parkade shuttle elevators are likely hydraulic so have different shaft requirements
     
     
  #2648  
Old Posted May 26, 2016, 9:16 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Big boom downtown.. I think V27 feed blew up as it affected our west retail. Brownlee building had to be evacuated & they sent everyone home
     
     
  #2649  
Old Posted May 26, 2016, 9:41 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
Downtown Edmonton pocket park named after former city councillor Michael Phair

ELISE STOLTE


http://wpmedia.edmontonjournal.com/

Edmonton recognized the work of its first openly-gay politician and a hard-working community advocate Thursday by naming a new park on 104 Street Michael Phair Park.

“I’m very honoured, very pleased,” said Phair, who served on council from 1992 to 2007 and was instrumental in making the popular downtown 104 Street what it is today.

“It’s very surreal. Most people are dead before this happens,” added Phair, who also has a public school named after him in west Edmonton’s Webber Greens. “It is quite amazing for me today,” he said. “Things like this should be done before people die more often so they have the opportunity to enjoy it a bit.”

http://edmontonjournal.com/news/local-ne...ter-former-city-councillor-michael-phair

Forthcoming.


http://static1.squarespace.com
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #2650  
Old Posted May 27, 2016, 3:44 PM
kcantor kcantor is offline
Registered User
 
Join Date: Aug 2007
Location: Edmonton
Posts: 2,987
Quote:
Originally Posted by s211 View Post
Out of curiosity, where the heck are the elevator shaft penetrations for the Stantec tower?
you can see the low rise office, high rise office, residential and shuttle elevator locations here:

http://www.wamdevelopment.com/media/49601/stantec-tower-floorplans-saved-for-web.pdf

it's not clear without a parkade plan which elevators service which levels. it's not necessary for the pits to go all the way down (we access ours from p1). the shafts probably go all the down with the lower levels being storage space but that depends on fall arrest design and transfer beams etc.
__________________
"If you did not want much, there was plenty." Harper Lee
     
     
  #2651  
Old Posted May 27, 2016, 4:06 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,518
Quote:
Originally Posted by kcantor View Post
you can see the low rise office, high rise office, residential and shuttle elevator locations here:

http://www.wamdevelopment.com/media/49601/stantec-tower-floorplans-saved-for-web.pdf

it's not clear without a parkade plan which elevators service which levels. it's not necessary for the pits to go all the way down (we access ours from p1). the shafts probably go all the down with the lower levels being storage space but that depends on fall arrest design and transfer beams etc.
Yeah, I was just having trouble seeing any penetrations for the parking shuttle. The shuttle I'd expect for the office component, but I wasn't expecting that the residential component would have to use a shuttle elevator for parking also, as virtually all residential projects I've seen have had elevators that serve all residential floors and the parkade levels too.
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #2652  
Old Posted May 27, 2016, 4:24 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
for high rise commercial buildings they separate out the parking elevators from the tower elevators for a variety of reasons, including but not limited to code compliance, security and to reduce traffic and wait times
     
     
  #2653  
Old Posted May 27, 2016, 4:26 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
Quote:
Originally Posted by kcantor View Post
you can see the low rise office, high rise office, residential and shuttle elevator locations here:

http://www.wamdevelopment.com/media/49601/stantec-tower-floorplans-saved-for-web.pdf

it's not clear without a parkade plan which elevators service which levels. it's not necessary for the pits to go all the way down (we access ours from p1). the shafts probably go all the down with the lower levels being storage space but that depends on fall arrest design and transfer beams etc.
Yes meant to say shafts. Really your pits are mostly just places to retrieve lost keys and access cards. Ours go all the way down. They are accessible from our sub basement, so no need for fall arrest, but I do have a bosun' chair and fall arrest system that goes down a 25 story high service shaft, for any trained operators looking for that urban rock climbing experience
     
     
  #2654  
Old Posted May 27, 2016, 4:44 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
161178494-008
17-May-2016
13204 - FOX DRIVE NW
Plan 9825678 Lot 2
To construct the FOOTING AND FOUNDATION
for a Indoor Participant Recreation Services Use
building Accessory to an Outdoor Participant
Recreation Services Use (riding arena,
classroom, stables, and spectator area) and to
construct exterior alterations (modifications to
the parking area and landscaping) and to
demolish an existing building (Whitemud Equine
Centre)
DUB ARCHITECTS LTD
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #2655  
Old Posted May 27, 2016, 4:53 PM
s211 s211 is offline
Registered User
 
Join Date: Oct 2008
Location: The People's Glorious Republic of ... Sigh...
Posts: 8,518
Quote:
Originally Posted by 240glt View Post
for high rise commercial buildings they separate out the parking elevators from the tower elevators for a variety of reasons, including but not limited to code compliance, security and to reduce traffic and wait times
Understood. I've just not seen separate parking shuttles for residential buildings. Mixed use might break that mold in some case, but even with the mixed-use buildings I've seen in Vancouver, the residential elevators also access the parkade levels.
__________________
If it seems I'm ignoring what you may have written in response to something I have written, it's very likely that you're on my Ignore List. Please do not take it personally.
     
     
  #2656  
Old Posted May 27, 2016, 4:59 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
CN Tower

DESCRIPTION: ZONING BYLAW AMENDMENT from (AJ) Alternative
Jurisdiction Zone to (CCA) Core Commercial Arts Zone,
DOWNTOWN.
LOCATION: 10004 – 104 Avenue NW
LEGAL
DESCRIPTION: Lot 2, Plan 9524494
APPLICANT: Strategic Group
OWNERS: 1602157 Alberta Ltd.
ACCEPTANCE OF
APPLICATION: November 25, 2015
EXISTING
DEVELOPMENT: CN Tower
_______________________________________________________
SUSTAINABLE
DEVELOPMENT’S
RECOMMENDATION: That Bylaw 17641 to amend the Zoning Bylaw from (AJ)
Alternative Jurisdiction Zone to (CCA) Core Commercial Arts
Zone and update Appendices 1-3 of Section 910 of the Edmonton
Zoning Bylaw be APPROVED.

The current owner is now looking to bring the zoning into line with
standard zoning utilized in the area with the intent of re-purposing the building to
potentially include retail, entertainment and residential uses.

JUSTIFICATION
Sustainable Development recommends that Bylaw 17461 be APPROVED on the basis that the
application:
 will provide additional re-development opportunities for an existing office building;
 complies with the development intent of the Capital City Downtown Plan; and
 meets the technical requirements of Civic Departments and utility agencies.
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
  #2657  
Old Posted May 27, 2016, 5:13 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
That building has been neglected for decades. Lots of work needed regardless of which way it goes. Like us, they're probably recognizing that the construction market is getting soft and costs are going down

Would make a decent market rental building I suppose, for those who would want to live in that area.
     
     
  #2658  
Old Posted May 27, 2016, 5:14 PM
noodlenoodle noodlenoodle is offline
BANNED
 
Join Date: Sep 2006
Location: Edmonton
Posts: 1,148
Quote:
Originally Posted by 240glt View Post
That building has been neglected for decades. Lots of work needed regardless of which way it goes

Would make a decent market rental building I suppose, for those who would want to live in that area.
Yeah, a commercial-to-residential conversion in a building infamous for the lack of care & attention it's received over the years sounds like a recipe for disaster.
     
     
  #2659  
Old Posted May 27, 2016, 5:16 PM
240glt's Avatar
240glt 240glt is offline
HVAC guru
 
Join Date: Sep 2006
Location: YEG -> -> -> Nelson BC
Posts: 11,297
^ I've seen a few quality conversions but most have not been good.. Okay for a rental but wouldn't want to invest in it
     
     
  #2660  
Old Posted May 27, 2016, 5:17 PM
Coldrsx's Avatar
Coldrsx Coldrsx is offline
Community Guy
 
Join Date: Dec 2003
Location: Edmonton, AB
Posts: 69,125
Update

g. The maximum Floor Area Ratio (FAR) shall be 12.4.
h. The maximum number of Dwelling units shall be 273.
i. Notwithstanding Section 52.1 of the Zoning Bylaw, the maximum Building
Height, including the roof mechanical unit, shall not exceed 160 m.
j. Building Setbacks shall be a minimum of 0 m on all sides of the building

5.4 Building Relationship to the Street
a. The development shall create a pedestrian-friendly environment on Jasper Avenue
and 114 Street which will include such things as entrance features, hard
landscaping, and other features that lend visual interest and human scale to the
development along the street, as conceptually shown in Appendices III and IV
and to the satisfaction of the Development Officer.
b. The building will be designed and oriented to face and front Jasper Avenue and
114 Street and clearly differentiate the residential entrance, located on 114 Street,
through distinct architectural treatment and address the street in a prominent
manner.
c. Weather protection in the form of a canopy or other architectural element shall be
provided to create a comfortable pedestrian environment and moderate the
impacts of weather particularly in the winter as required based on wind study
information.
d. A minimum of 70% of the linear frontage of the ground floor façade fronting onto
a public roadway, other than a lane, shall consist of transparent glazing. This clear
glazing allows for visual penetration into buildings and provides illumination of
the pedestrian realm in the evening and during the winter months. Linear frontage
shall be measured as the horizontal plane at 1.0 m above grade.
e. The front facades of the building commercial shall be designed to break the
appearance of the façade consistently sized with other buildings on the shopping
street through a combination of recesses, projections, change in building
materials, colors, and/or a physical breaks in building to the satisfaction of the
Development Officer.

d. Prior to the issuance of the Development Permit, the developer shall enter into an
agreement to contribute funds to the Oliver Community League for an offsite
amenity for public park enhancements, with specific details to be determined at
the Development Permit stage between the Owner and City Administration in
consultation with the Oliver Community League. These funds will be submitted to
the City of Edmonton and disbursed accordingly to the Oliver Community
League. These funds shall be provided prior to the issuance of the Development
Permit in the amount $200,000.

e. Prior to the issuance of any Development Permit, the Development Officer shall
ensure that a signed agreement has been executed between the City of Edmonton
and the owner, requiring the owner to provide to the City of Edmonton, at the
time of development permit approval, the option to purchase 5% of dwelling units
at 85% of the list price.















www.edmonton.ca
__________________
"The destructive effects of automobiles are much less a cause than a symptom of our incompetence at city building" - Jane Jacobs 1961ish

Wake me up when I can see skyscrapers
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Edmonton
Forum Jump



Forum Jump


All times are GMT. The time now is 7:50 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.