HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Apr 27, 2016, 3:36 PM
drew's Avatar
drew drew is offline
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,910
Quote:
Originally Posted by optimusREIM View Post
I'm curious then how they keep I29 in such good shape.
I am pretty sure the new lengths of TCH from Deacon's corner to the Steinbach overpass were built as a bit of a test case.

The east-bound lanes are poured, reinforced concrete.

The west-bound lanes are asphalt on a compacted base.

Now we wait...

In terms of road bed prep in Winnipeg, from what I understand, the new roads they have put in around PoloPark were done to a new higher standard. They went down 4-6 feet below grade and built up the base with a heavy course of rock, and then compacted with increasingly smaller granular up to the underside of the new concrete.

Apparently this is the new standard that all major roads in Winnipeg will be built to. Sounds expensive, and probably is.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 10:52 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.