
I was looking at both expansion options above and I think I see a further expansion dilemma, beyond the present expansion. The current expansion is a very modest 7 or 8 gates. By the city's estimate, right or wrong, that should be enough until 2025. The plans for the following expansion adds significantly more gates and a new runway. The 3rd runway makes sense, but why would we need triple the amount of gates the next go around compared to the current puny few, unless they figure in 9 years the growth figures are going to triple. My point is, current expansions plans are moderate because it basically finishes out the terminal. The future expansion is so grandiose, it can't be justified by current growth numbers even beyond 2025. There aren't any smaller scale expansion plans at this time outside of the South Terminal. It appears like we'll have to grow big enough to fill those big shoes, however long it takes before the next expansion is considered, unless they can redesign a much smaller expansion to justify the need. The dilema, how and where can they add less gates then the lofty albeit 2003 plans? Under those plans, we would go from capacity to overbuilt. So why not just go for overbuilt now? Because they want to finish the current terminal first, then hope traffic growth will justify adding 20 to 30 gates on the next expansion. My logic on this is dizzying if not anywhere near accurate.