Quote:
Originally Posted by swimmer_spe
I notice that a lot of the discussion these days is how horrible the service will become with the LRT.
Every time any new mass transit is implemented, the opposite is the case.
Toronto is extending the subway up to Vaughan. Do you think people at York U will see their ride get longer? Will it be less service frequency? No! If anything things will get much much better.
The LRT is Ottawa's second mass transit system. The former O-train had service frequency issues due to a number of factors. Diesel MUs, single track, were 2 of those issues. The LRT will be double tracked and be electric. So, it stands to reason that it will be faster overall.
They can keep adding more LRT trains till they get to their maximum headway (Someone may be able to quote an exact time)
I think those naysayers, after a year that the LRT is running, should have to apologize for being so negative.
After this LRT line is built out to the far reaches, I am certain that the city will look what to do next. Double tracking and extending the O-train to the Airport will be on the list. I bet they will also look at other places where there would be a high demand for a new LRT line.
Building the line on the edge of a neighbourhood is not that bad. If it was not raining and I knew that I had less than a 15 minute walk to the nearest station, I would ride the LRT into town.
|
I know I am one of the naysayers but only to the degree that we are expecting more than what is realistic. Claims are being made that defy logic in my mind. I am sure people will enjoy it when it is in operation. There is no question.
What we are doing is unique. We are doing a total rebuild of rapid transit. No city is doing it like we are. This is far beyond a change in signalling. This is also not like the Vaughan subway extension or the construction of the Canada Line in Vancouver or the Eglinton crosstown. In every one of those cases, new rapid transit is being built from scratch and the results of speedier transit is without question.
What we are doing presents the question. Will it be faster really? It is all about the rebuild. And what supposed new ridership market are we attracting? If it is a new line, it is obvious. This is not. In our case, claims of massive ridership gains are based on what? Claims that you can stay downtown after work are based on what? If you live in the suburbs, at some point you still face a transfer to a half hourly or hourly local bus route. So, how is it easier to stay downtown after rush hour? It won't be.
And our station locations are exactly the same as they were before. Why would a 15 minute walk to a LRT station be any better than a 15 minute walk to the same Transitway station with similar service levels? It won't be.
We have to be honest with ourselves. Trains do not provide magic solutions. It is the service quality that is more important. If the service level is not significantly changing, then why are we making so many claims?
Any presumptions that local transit service will suddenly improve are just that, presumptions. What is the chance of Route 124 to Beacon Hill suddenly operating on a 15 minute schedule during off-peak hours? What about Route 149 to Elmvale? The chances of this are slim to none.
We can hope for improvements to neighbourhood transit and perhaps there will be some but the city has given no indication that they will go in that direction. Recent budgetary restrictions have shown the city has no interest in expanding transit service in local neighbourhoods.
However, we are in a dilemma. The only way to produce real results is not with the Confederation Line itself but with improvements to the bus network that supports it. How the city re-uses (or doesn't reuse) surplus buses when the Confederation Line opens will determine how successful this will all be. Or will the city provide token improvements that they quietly cancel as has been the city's practice in the past when express routes were eliminated.
As I said, there is no question that the Confederation Line will be popular with riders. The question remains, will it really improve transit service significantly? And this alone makes this plan both unique and risky in comparison to what other cities are doing.
I do hope that we learn the lesson that we should not be building busways with the intention of later converting them to rail. This is proving to be a very wasteful way of delivering rapid transit. Just look at the way we are ripping up the right of way, demolishing every station and even a bridge.