HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure


Closed Thread

 
Thread Tools Display Modes
     
     
  #10181  
Old Posted Mar 7, 2016, 12:32 AM
CrossedTheTracks CrossedTheTracks is offline
Registered User
 
Join Date: Mar 2015
Posts: 354
Quote:
Originally Posted by Cage View Post
Correct me if I am wrong, but both of Lions Park and 39th Avenue stations are infill. Neither of these stations have lived up to its potential for increased ridership.
Neither. No LRT stations have ever been constructed as infill, ignoring the shuffling of stations on 7th Avenue due to 4-car-length reconstruction and various shifting of stations in the west end as lines were added.
__________________
"Skyscraper, skyscraper, scrape me some sky..." - Dennis Lee
     
     
  #10182  
Old Posted Mar 7, 2016, 3:26 PM
Riise's Avatar
Riise Riise is offline
City Maker
 
Join Date: Feb 2006
Location: Calgary | London
Posts: 3,195
Quote:
Originally Posted by Cage View Post
If the proposed Jorthland station
This was a cool typo, it's a very Nordic sounding name.
__________________
“Such suburban models are being rationalized as ‘what people want,’ when in fact they are simply what is most expedient to produce. The truth is that what people want is a decent place to live, not just a suburban version of a decent place to live.”
- Roberta Brandes Gratz
     
     
  #10183  
Old Posted Mar 7, 2016, 4:23 PM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Quote:
Originally Posted by Cage View Post
Before we start a conversation about adding stations along the red line, we should have conversation about the importance of TOD along the green line. My understanding is that SE green line sucess is heavily dependent on new TOD development for the majority of new stations that are between Ramsay and Quarry Park.

If we are putting in billions dollar investment into new LRT line that doubles our network capacity and service area, then we should concentrate all efforts to make this line a day one sucess. My estimate has SE green line has minimum of 5 stations completely dependent on TOD to justify the stations existence. To put this into perspectives he following stations have TOD under construction; Heritage, Brentwood, Westbrook, and dalhousie (limited to one development). Did I miss any TOD near LRT?

If my estimate is correct, SE green line will double the number of TOD areas with immediate potential. Simultaneously constructing the north green line will bring more TOD areas on stream. To protect the massive investment in green line, perhaps delaying new TOD on the redline is the best course of action.
You forgot the NE line, which is largely a blank slate of parking lots to be redeveloped at every stations.

I think Northland has a real opportunity, as well as a 50th Avenue replacement of 39th Street. At least, equally as much as the five or so TOD on the Greenline that you mentioned.

I am happy the city is looking long-term with the Greenline and planning land-use and the transportation components together. The result should be impressive. However it is a very long-term plan. It's taken 30 years before our first LRT lines are seeing actual TOD in University City at Brentwood. Times have changed and TOD-style developments are popular and attractive which will help speed things up, but if more TOD is a goal, we already have 2 dozen stations that are under-developed by TOD standards.

The real low-hanging fruit of the TOD world is the existing stations, not the Green Line. I assume some work is already being done, but there should be some effort made to encourage development more aggressively along the line.

Related to TOD: The City and institutions also do a poor job integrated into exist activity centres at stations. Projects like the Chinook pedestrian bridge and sidewalk upgrades should be in place at nearly every existing station, it's amazing how little integration is considered at some stations. These fixes would cost a fraction of new stations or lines and would make the whole system more attractive for current users and future TODs.

Examples of poor station designs off the top of my head:
  • Rundle: PLC entrance on opposite side, Sunridge Mall walk through a parking lot, car-oriented multi-family adjacent to the station with fences to make it impossible to cut-through to the station etc.
  • Marlborough: no pedestrian crossing at south portion of the station, Marlborough Mall with no direct pedestrian walk to nearest door for no reason
  • Zoo: No pathway to Telus Spark, No coordination with Zoo creates the most car-dependent science centre in the country
  • Heritage: No side-walks to high-density condos, ridiculously inefficient pedestrian bridge wastes time
  • Banff Trail: No coherent sidewalks throughout the jumbled mess of Motel Village to indicate there is station anywhere nearby
  • University: Busiest station outside the core. Narrow stairs, narrow paths and a complete lack of interest by U of C to leverage it's TOD potential by continually building new structures farther and farther from the station. Instead they have left major parking lots and access roads to cross on the way from the station to any buildings. all this from the campus' most popular access route (the LRT). They have had 30 years to adjust to the LRT's presences and have done nothing to leverage it as an asset.
__________________
From the right side of the wrong side of the tracks.
     
     
  #10184  
Old Posted Mar 7, 2016, 6:09 PM
CCF's Avatar
CCF CCF is offline
Canadian Urbanite
 
Join Date: Jul 2006
Location: Across Canada
Posts: 3,532
Quote:
Originally Posted by MasterG View Post

University: Busiest station outside the core. Narrow stairs, narrow paths and a complete lack of interest by U of C to leverage it's TOD potential by continually building new structures farther and farther from the station. Instead they have left major parking lots and access roads to cross on the way from the station to any buildings. all this from the campus' most popular access route (the LRT). They have had 30 years to adjust to the LRT's presences and have done nothing to leverage it as an asset
Agree with your list, and I think more could be said about some of the other stations not listed as well. It's remarkable in some way that Calgary's LRT has the ridership it does given the poor design and incompatible land uses that surround much of the LRT stations.

The University station is bothersome, it's pretty much inconvenient to access from any building on campus. The eastern side of campus would have been far more logical as the location for the new residences, rather than continuing to push development west.
     
     
  #10185  
Old Posted Mar 7, 2016, 7:00 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,625
Quote:
Originally Posted by CCF View Post
Agree with your list, and I think more could be said about some of the other stations not listed as well. It's remarkable in some way that Calgary's LRT has the ridership it does given the poor design and incompatible land uses that surround much of the LRT stations.

The University station is bothersome, it's pretty much inconvenient to access from any building on campus. The eastern side of campus would have been far more logical as the location for the new residences, rather than continuing to push development west.
This is old (2010), and the Campus Master Plan is currently undergoing a full refresh [Campus Forward]:





480 beds in the two buildings by the LRT, one of them being 15 stories tall.
     
     
  #10186  
Old Posted Mar 7, 2016, 8:14 PM
Fuzz's Avatar
Fuzz Fuzz is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,421
When I lived in res, we always took cabs down to the bars because it was cheaper with a cab full of people, and you didn't have to walk all the way across campus. Big deal in the winter when you don't want to bring a parka to the club.
     
     
  #10187  
Old Posted Mar 7, 2016, 10:10 PM
Riise's Avatar
Riise Riise is offline
City Maker
 
Join Date: Feb 2006
Location: Calgary | London
Posts: 3,195
Quote:
Originally Posted by MasterG View Post
Examples of poor station designs off the top of my head:
  • Rundle: PLC entrance on opposite side, Sunridge Mall walk through a parking lot, car-oriented multi-family adjacent to the station with fences to make it impossible to cut-through to the station etc.
While the rezzie does turns its back to the station, there is a multi-use path that cuts through the multi-family to provide access to the rest of the community and onto Pineridge.
__________________
“Such suburban models are being rationalized as ‘what people want,’ when in fact they are simply what is most expedient to produce. The truth is that what people want is a decent place to live, not just a suburban version of a decent place to live.”
- Roberta Brandes Gratz
     
     
  #10188  
Old Posted Mar 8, 2016, 4:47 AM
MasterG's Avatar
MasterG MasterG is offline
Registered User
 
Join Date: Jan 2009
Location: Calgary
Posts: 1,820
Quote:
Originally Posted by MalcolmTucker View Post
This is old (2010), and the Campus Master Plan is currently undergoing a full refresh [Campus Forward]:




480 beds in the two buildings by the LRT, one of them being 15 stories tall.
Thanks for this. It's amazing how engrained grade-separation mentality is in at U of C (and arguably City of Calgary overall). Most universities wouldn't even consider a pedestrian bridge on a minor circulation road with much more traffic than that one at U of C.

My guess is that the U of C's plan refresh will not correct my TOD criticism and continue the shift towards West Campus. I hope the 16th Ave Crosstown helps integrate the U of C better to the city.
__________________
From the right side of the wrong side of the tracks.
     
     
  #10189  
Old Posted Mar 8, 2016, 4:53 AM
Fuzz's Avatar
Fuzz Fuzz is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,421
Grade separation works here because you avoid having stairs. The LRT bridge is a long ways up.
     
     
  #10190  
Old Posted Mar 8, 2016, 5:12 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,625
Quote:
Originally Posted by MasterG View Post
Thanks for this. It's amazing how engrained grade-separation mentality is in at U of C (and arguably City of Calgary overall). Most universities wouldn't even consider a pedestrian bridge on a minor circulation road with much more traffic than that one at U of C.

My guess is that the U of C's plan refresh will not correct my TOD criticism and continue the shift towards West Campus. I hope the 16th Ave Crosstown helps integrate the U of C better to the city.
At that time I believe more bus routes than the 20 passed on the circulation road. Now there is a large bus stop on the north side of the EEEL building, and the 9, 72, and 73 run to the Children's Hospital and then along 32nd Ave. An ongoing interest of the university is having more community events on campus and I think that is expressed in this old plan through a weather protected connection (can't really be sure of the thought process though).

That being said, right now the walk to Swann Mall you pass under the first floor connection between two buildings, then up an incline to get to ground level. These buildings were planned and built before the city abandoned the great freeway project, along with the residence dining hall. Heck, UCalgary might be where SAIT is right now if the freeway hadn't been planned (though much of the original campus had been sold by the 1950s). Building the Olympic Village (the 1980s era residence buildings) near the LRT would have created serious logistics problems during the Olympics with security and necessitated a second dining centre.

Also, not sure how student sentiment will be to living right near a planned animal care (testing) building, the Life Sciences Centre, though the site isn't totally firm.
     
     
  #10191  
Old Posted Mar 8, 2016, 5:42 AM
PPAR's Avatar
PPAR PPAR is offline
Registered User
 
Join Date: Jul 2006
Posts: 604
Quote:
Originally Posted by MalcolmTucker View Post
This is old (2010), and the Campus Master Plan is currently undergoing a full refresh [Campus Forward]:


480 beds in the two buildings by the LRT, one of them being 15 stories tall.
Seems like a mini version of HUB Mall for those of us familiar with the University of Alberta (which I always thought was an under appreciated asset of that school).
     
     
  #10192  
Old Posted Mar 14, 2016, 3:43 AM
People.talking's Avatar
People.talking People.talking is offline
YYC
 
Join Date: Feb 2016
Location: Rocky Ridge, Calgary
Posts: 236
alright so I'm just curious. when the green line is built through downtown, does anyone else like the idea if a central station when the green line and the other lines intersect?
     
     
  #10193  
Old Posted Mar 14, 2016, 6:30 AM
VIce VIce is offline
Registered User
 
Join Date: Nov 2013
Posts: 704
Quote:
Originally Posted by People.talking View Post
alright so I'm just curious. when the green line is built through downtown, does anyone else like the idea if a central station when the green line and the other lines intersect?
I think everybody likes the idea, in the same way that everyone likes the idea of high speed rail to Edmonton. But whether the idea makes sense as a use of public money is another question. Would the station just serve as an indoor lobby to connect the future-8th ave subway, 7th ave transit mall, and green line, and if so what are the benefits versus outdoor transfers (aside from being awesome)? It'd be pretty expensive to find the real-estate in the 7th/8th ave and 2nd street area to accommodate busses for an intermodal station, and a big stretch to get over to the CP mainline for a future/hypothetical rail station.

I think the former Eaton Centre and the +15 network on its immediate periphery can be renovated to accommodate a lot of the functions of a 'central station' (including a bit of -15 here and there). Especially if each of the BRT routes and some of the busier bus routes can be re-routed a block or two to clip the complex.
     
     
  #10194  
Old Posted Mar 14, 2016, 4:00 PM
suburbia suburbia is offline
BANNED
 
Join Date: Mar 2012
Posts: 6,271
Quote:
Originally Posted by VIce View Post
I think the former Eaton Centre and the +15 network on its immediate periphery can be renovated to accommodate a lot of the functions of a 'central station' (including a bit of -15 here and there). Especially if each of the BRT routes and some of the busier bus routes can be re-routed a block or two to clip the complex.
Yes absolutely. It will work for an elevated line, but if they go with the more expensive and complex below grade line, it will be a bit of a stretch (like ten floors below ground of a stretch). One of the reasons grand central stations actually work is there is lots of things going on and engagement above grade. So many people visit Toronto's union station just for lunch. That's where the +15/+30 portion of our cross-over will really shine. No one is going to go 10 floors under to get a Tim Horton's.
     
     
  #10195  
Old Posted Mar 14, 2016, 4:50 PM
Fuzz's Avatar
Fuzz Fuzz is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,421
I assume you have never used Montreal's metro....
     
     
  #10196  
Old Posted Mar 14, 2016, 5:14 PM
People.talking's Avatar
People.talking People.talking is offline
YYC
 
Join Date: Feb 2016
Location: Rocky Ridge, Calgary
Posts: 236
ok I'm confused again, are they connecting the green line to merge in with the 7th ave transit corridor or are they going to re route it to be next to the Cp rail line?
     
     
  #10197  
Old Posted Mar 14, 2016, 5:21 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,625
Quote:
Originally Posted by Fuzz View Post
I assume you have never used Montreal's metro....
Or visited Union Station before its renovations. Besides the, while beautiful, mostly non-functional waiting hall it was an atrocious public space for anything but passing through. The cinnabon smell though on the concourse level! Montreal's main train station is much more functional.

Make a space nice with no better alternatives and people will use it. I certainly hope otherwise empty space or volume is let to vendors in any system the P3 partner sets up, but I doubt there is the demand nor need for much more than a few to provide some 'eyes on the street' considering the cost of providing the space.

Presumably a P3 partner will be responsible for designing a system that requires them to contract the city for as few special constables as possible to provide a friendly environment, giving them an incentive to think about other ways to provide security.
     
     
  #10198  
Old Posted Mar 14, 2016, 5:42 PM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Quote:
Originally Posted by People.talking View Post
ok I'm confused again, are they connecting the green line to merge in with the 7th ave transit corridor or are they going to re route it to be next to the Cp rail line?
It's perpendicular, either tunneled below (likely) or elevated above (unlikely). Eventually there will be three levels once the red line is also buried along 8th Ave.
     
     
  #10199  
Old Posted Mar 14, 2016, 7:15 PM
People.talking's Avatar
People.talking People.talking is offline
YYC
 
Join Date: Feb 2016
Location: Rocky Ridge, Calgary
Posts: 236


so wouldn't the ideal place for a central station be somewhere east of city hall and the new central library where the red and blue line split as well as being close to the cp rail line
(between 3st and 4st SE)
     
     
  #10200  
Old Posted Mar 14, 2016, 7:23 PM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
It's already been decided that it's going down 2nd St. The 5 options are in this document:

http://www.calgary.ca/_layouts/cocis/Dir...eLRT_options_final.pdf&noredirect=1&sf=1
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure