Quote:
Originally Posted by MasterG
I am a little concerned that the downtown/inner city stretch will be botched, not just because of the hurry to get built, but because also because it may also follow the same pattern of previous designs to maximize overall length at the cost of functionality for some key areas, in this case Downtown and the Beltline. The Greenline can't be seen as simplistically as a transportation project, with only lip-service paid to the city-building qualities to it.
Biggest potential misplays that could be born out of the "maximize efficiency to the surburbs" ideology:
- Elevated structure through downtown: will kill any hope of street life and make transfers painful for anyone switching lines.
- Access to Beltline: I hope rumours are true to have the Greenline turn on 12th rather than 10th to make it much more functional to the fastest growing, most mixed use neighbourhood we have. Ignoring the development there (existing, current and proposed in the future) is a huge wasted opportunity to connect the 23,000 living there currently (and upwards of 40 - 50,000 nearing full build out), not to mention the city's second largest office concentration after the CBD and only neighbourhood attempting to become a 24-hour destination. All efforts to make the line accessible to the neighbourhood should be done. It has the highest trip-origin/destination potential of any stop on the Greenline outside the CBD proper.
- Poorly integrated transfer station on 2nd Street: 2nd street and 8th/7th Avenue will become the defacto heart of the transportation network. All efforts to design this properly should be take to maximize transfer efficiency. This would also be a no-brainer decision for a regional / intercity rail connection along 9th Avenue where the existing CPR station infrastructure is currently. Huge missed opportunity if it isn't built in a way to integrate nicely at this location
|
I agree with your first and third points (poor interface with Downtown and/or other lines negate some of the reasons to invest in the green line in the first place), but the point about 12th ave vs 10th ave has been looked at and there are some sound reasons to stick with 10th Ave:
-There could still be a stop at 10th ave & 1st st SW and a stop at 10th Ave & 4th St SE. The 1st st stop is only a 5 minute walk to Memorial Park Library or a 9 minute walk from St Mary's Cathedral. The 4th st E stop has potential to serve the fastest-growing (and ultimately, probably what will be the highest populated in a couple decades) part of the Beltline, Victoria Park, and better serves the East Village than a 12 st station would.
-Farther west in the Beltline, it only takes 10 minutes to walk from 7th Ave to 14th Ave. Ergo, these people at best would only experience and incremental improvement to transit access.
-The residents of the Beltline are among the most likely to walk or bike to work and school
-10th Ave is a shorter route (faster travel, less expensive capital cost, more direct)
-However the track is built, it will inevitably be a barrier in the community and conflict with pedestrians, service vehicles, bicycles, and existing infrastructure to some degree. It makes more sense to lump it together with the CPR ROW whenever possible rather than creating an island that is difficult to access.
-The only logical entrance to Inglewood is along the CPR ROW without an expensive and disruptive dig under or through Ramsay
Unfortunately, I think rapid transit through the centre of the Beltline is not in the foreseeable future. Rapid transit in Calgary will remain predominantly a suburb-to-downtown (and a few other employment nodes) service. The result is positive to the Beltline though: better service in and out of Victoria Park, new (improved, if not optimal) transit routes from the Beltline (1st st & 10th Ave) to Inglewood, the SE, and the North. The Greenline will be the best choice for anyone in north-central Calgary destined for the Beltline, which will essentially upgrade the #3 bus.