Old Posted Feb 11, 2016, 12:29 AM
Blue_Cypress's Avatar
Blue_Cypress Blue_Cypress is offline
Snarkotron
 
Join Date: Sep 2006
Location: Mount Pleasant, Calgary
Posts: 2,580
I'm kind of out of the loop of late on this. Has anyone heard mention of an intertie between existing lines and the new green line?
Reply With Quote
     
     
  #482  
Old Posted Feb 11, 2016, 2:34 AM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Quote:
Originally Posted by Blue_Cypress View Post
I'm kind of out of the loop of late on this. Has anyone heard mention of an intertie between existing lines and the new green line?
What do you mean an intertie? There will be no track connection between the two and they will be using incompatible rolling stock, but there will be some form of interchange station on 7th Ave.
Reply With Quote
     
     
  #483  
Old Posted Feb 11, 2016, 2:40 AM
mersar's Avatar
mersar mersar is offline
Registered User
 
Join Date: May 2006
Location: Calgary, AB
Posts: 10,083
Quote:
Originally Posted by Blue_Cypress View Post
I'm kind of out of the loop of late on this. Has anyone heard mention of an intertie between existing lines and the new green line?
More than likely there won't be one. Its quite possible (even likely) that the new SE line may use completely different LRV's than existing, low floor is a likely possibility but we could potentially see even a different manufacturer depending on how the process goes. Its already planned that there would need to be a storage/mechanical garage for the SE line so likely no need to use existing facilities (which are setup for the current style of LRV anyways).
Reply With Quote
     
     
  #484  
Old Posted Feb 11, 2016, 5:58 AM
Blue_Cypress's Avatar
Blue_Cypress Blue_Cypress is offline
Snarkotron
 
Join Date: Sep 2006
Location: Mount Pleasant, Calgary
Posts: 2,580
Ah, so we're still going with the "stupid" plan. Thanks guys.
Reply With Quote
     
     
  #485  
Old Posted Feb 11, 2016, 6:08 AM
CTrainDude CTrainDude is offline
Registered User
 
Join Date: Mar 2007
Posts: 517
Quote:
Originally Posted by Blue_Cypress View Post
Ah, so we're still going with the "stupid" plan. Thanks guys.
I'm not sure it's really that stupid. Tying it together is just going to slow everything down. The biggest reason for delays downtown is because the two lines share the same track and switching takes time - if you add switching with the Green Line (even if it's just to cross), you're reducing capacity on all three lines.
By using low floor trains, not only is the system more accessible, but stations are cheaper, and there's many more options in rolling stock to choose from.
Reply With Quote
     
     
  #486  
Old Posted Feb 11, 2016, 6:25 AM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Quote:
Originally Posted by Blue_Cypress View Post
Ah, so we're still going with the "stupid" plan. Thanks guys.
What were you expecting? The lines cross at right angles and use different platform heights. Linking them would achieve nothing.
Reply With Quote
     
     
  #487  
Old Posted Feb 11, 2016, 3:52 PM
Riise's Avatar
Riise Riise is offline
City Maker
 
Join Date: Feb 2006
Location: Calgary | London
Posts: 3,195
Quote:
Originally Posted by CTrainDude View Post
I'm not sure it's really that stupid. Tying it together is just going to slow everything down. The biggest reason for delays downtown is because the two lines share the same track and switching takes time - if you add switching with the Green Line (even if it's just to cross), you're reducing capacity on all three lines.
While I'm against interlining, I can see the benefits of having a connection point between the lines. The main benefit would be having the ability to move rolling stock from one line to another for delivery, repair or storage.
Reply With Quote
     
     
  #488  
Old Posted Feb 11, 2016, 4:32 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,637
Quote:
Originally Posted by Riise View Post
While I'm against interlining, I can see the benefits of having a connection point between the lines. The main benefit would be having the ability to move rolling stock from one line to another for delivery, repair or storage.
After a certain size of fleet there are very few economies of scale, not saying there won't be any, but as a probable P3 process those economies would have to be pretty huge to outweigh keeping the project clean.
Reply With Quote
     
     
  #489  
Old Posted Feb 11, 2016, 5:15 PM
Riise's Avatar
Riise Riise is offline
City Maker
 
Join Date: Feb 2006
Location: Calgary | London
Posts: 3,195
Quote:
Originally Posted by MalcolmTucker View Post
After a certain size of fleet there are very few economies of scale, not saying there won't be any, but as a probable P3 process those economies would have to be pretty huge to outweigh keeping the project clean.
Sorry, I did not intend to suggest that they could share rolling stock but rather move their rolling stock between depots. For example, TfL had to undertake a massive operation to replace the rolling stock on the Waterloo & City line as it is completely isolated from all other lines. Even an unpowered switch or segment of connecting track would have been a lot easier than having to move the new cars from trucks to the track using a crane.

Reply With Quote
     
     
  #490  
Old Posted Feb 11, 2016, 5:59 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,637
Quote:
Originally Posted by Riise View Post
Sorry, I did not intend to suggest that they could share rolling stock but rather move their rolling stock between depots. For example, TfL had to undertake a massive operation to replace the rolling stock on the Waterloo & City line as it is completely isolated from all other lines. Even an unpowered switch or segment of connecting track would have been a lot easier than having to move the new cars from trucks to the track using a crane.

Oh, lots track adjacent to freight track for a delivery spur.
Reply With Quote
     
     
  #491  
Old Posted Feb 11, 2016, 7:18 PM
lineman's Avatar
lineman lineman is offline
power to the people!
 
Join Date: Oct 2008
Location: Crescent Heights, Calgary
Posts: 864
I'm assuming the new tracks would be the same gauge as the existing light and heavy rails around the city. I would imagine a delivery spur could be made somewhere near Ramsay (which would be probably the same heavy rail track that has a spur at Haysboro).
Reply With Quote
     
     
  #492  
Old Posted Feb 11, 2016, 10:58 PM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Quote:
Originally Posted by Riise View Post
Sorry, I did not intend to suggest that they could share rolling stock but rather move their rolling stock between depots. For example, TfL had to undertake a massive operation to replace the rolling stock on the Waterloo & City line as it is completely isolated from all other lines. Even an unpowered switch or segment of connecting track would have been a lot easier than having to move the new cars from trucks to the track using a crane.

Lots of the LU lines are completely separate from each other, it's just the Waterloo and City line is completely underground, including the depot, hence the craning down a hole which happens very rarely. Seeing as the Green Line will definitely be using different rolling stock (low floor) there will be no benefit whatsoever for linking the lines.
Reply With Quote
     
     
  #493  
Old Posted Feb 16, 2016, 1:48 AM
Chadillaccc's Avatar
Chadillaccc Chadillaccc is offline
ARTchitecture
 
Join Date: Feb 2011
Location: Cala Ghearraidh
Posts: 22,842
Nenshi submits formal funding request to NDP government for Green Line LRT
TREVOR HOWELL | CALGARY HERALD

Quote:
The NDP government needs to pony up cash to help pay for Calgary’s Green Line LRT now that the city has submitted an official funding request, says a local transit lobby group.

Both the federal government and the city have promised to fund two-thirds of the 46-kilometre light rail transit project, which could now cost $4 billion to $5 billion, excluding additional financing costs. While the NDP have voiced support for the project, it has refused to commit any dollars until it received a formal request.

“We now have a provincial government that has stated throughout that they’re in support of the project,”said Jeff Binks, president of LRT on the Green. “The one reason that they’ve kept coming back to for not making a consideration for funding has now been taken away.”

Last month, Calgary’s mayor submitted a letter to Alberta Infrastructure Minister Brian Mason, outlining the scope of the Green Line LRT, previous commitments by the city and Ottawa, and the crucial role the province has played in building Calgary’s LRT system — one of the most well used in North America — since it first opened in 1981.

...
Source: http://calgaryherald.com/news/local-news...est-to-ndp-government-for-green-line-lrt
Reply With Quote
     
     
  #494  
Old Posted Feb 16, 2016, 4:11 PM
Riise's Avatar
Riise Riise is offline
City Maker
 
Join Date: Feb 2006
Location: Calgary | London
Posts: 3,195
Quote:
Originally Posted by milomilo View Post
Seeing as the Green Line will definitely be using different rolling stock (low floor) there will be no benefit whatsoever for linking the lines.
Using the rolling stock on multiple lines is not the only benefit of linking lines. In addition to deliveries, it can also accommodate temporary storage. However, Calgary Transit has to weigh the cost of providing a link against the potential benefits.
Reply With Quote
     
     
  #495  
Old Posted Feb 16, 2016, 7:10 PM
ByeByeBaby's Avatar
ByeByeBaby ByeByeBaby is offline
Crunchin' the numbers.
 
Join Date: Mar 2009
Location: T2R, YYC, 403, CA-AB.
Posts: 791
Quote:
Originally Posted by Riise View Post
Using the rolling stock on multiple lines is not the only benefit of linking lines. In addition to deliveries, it can also accommodate temporary storage. However, Calgary Transit has to weigh the cost of providing a link against the potential benefits.
The costs also include the substantial additional costs of larger stations. It seems to me that rather than building a few hundred metres of linking track in the most expensive and constrained part of the city connecting rail lines at potentially three different grade levels, it would be orders of magnitude cheaper to drop a few hundred metres of storage track at grade in available right of way a low-density area.

The cost also would include whatever political pushback you would get from tens of thousands of residents communities that have been promised low-profile, small stations and would be getting much larger more intrusive stations. But maybe there are tens of thousands of addled railfan trainspotters with OCD out there to sway the politics the other way.
Reply With Quote
     
     
  #496  
Old Posted Feb 16, 2016, 7:13 PM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,637
Since the lines don't touch and likely will be maintained by outside contractors, they will probably use AC power as well.
Reply With Quote
     
     
  #497  
Old Posted Feb 16, 2016, 8:07 PM
hulkrogan hulkrogan is offline
Registered User
 
Join Date: Sep 2006
Posts: 526
Why is AC preferred for LRV applications? Large scale transmission is moving toward DC because of the efficiencies it provides. Have LRVs gone to induction motors?
Reply With Quote
     
     
  #498  
Old Posted Feb 16, 2016, 10:59 PM
Riise's Avatar
Riise Riise is offline
City Maker
 
Join Date: Feb 2006
Location: Calgary | London
Posts: 3,195
Quote:
Originally Posted by ByeByeBaby View Post
The costs also include the substantial additional costs of larger stations. It seems to me that rather than building a few hundred metres of linking track in the most expensive and constrained part of the city connecting rail lines at potentially three different grade levels, it would be orders of magnitude cheaper to drop a few hundred metres of storage track at grade in available right of way a low-density area.
While the cost of providing the link is an important consideration, the stations would not need to be larger is size as the rolling stock from other lines would be dead-heading.
Reply With Quote
     
     
  #499  
Old Posted Feb 17, 2016, 12:52 AM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Quote:
Originally Posted by hulkrogan View Post
Why is AC preferred for LRV applications? Large scale transmission is moving toward DC because of the efficiencies it provides. Have LRVs gone to induction motors?
The actual power supply/OHLE is still 600V DC, if that's what you mean. It's just the older U2s have DC motors.

I'm not sure why they would go to AC power supply Malcolm? Almost all metros/LRTs are low voltage DC?
Reply With Quote
     
     
  #500  
Old Posted Feb 17, 2016, 1:07 AM
MalcolmTucker MalcolmTucker is offline
Registered User
 
Join Date: May 2007
Posts: 11,637
Right now our system takes AC from the grid and rectifies it to DC, then in non-U2 LRVs converts it back to AC to run the vehicle. You must have at least some losses in all the conversions, plus higher equipment costs. AC supply voltage for trains isn't uncommon - the Calgary system is only DC because the Frankfurt system is DC so they could slowly introduce the U2s onto the legacy streetcar network. New build lines go either way: S70s in Charlotte are DC, in Paris are AC, and some are built for both as 'tram-trains'.

Presumably for an AC system you could build fewer larger scale substations, but don't quote me on that. That is just applying logic, not knowledge.

In any case since the system will be independent, it will probably come down to which equipment the winning bidder has a competency in, as the efficiency tradeoff likely isn't large enough to cause someone to implement an alternative they have little experience in.

Last edited by MalcolmTucker; Feb 17, 2016 at 1:18 AM.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Calgary > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 12:23 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.