HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley


    3 Civic Plaza in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Surrey Skyscraper Diagram

Map Location

Reply

 
Thread Tools Display Modes
     
     
  #781  
Old Posted Feb 16, 2016, 12:50 AM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
When I lived in Berlin I could feel the vibrations of the U-Bahn every time it would pass. My apartment was ground floor and a block from the tunnel. You get used to this sort of thing after a week.
Reply With Quote
     
     
  #782  
Old Posted Feb 16, 2016, 12:01 PM
Blease Blease is offline
Registered User
 
Join Date: Aug 2013
Posts: 550
Quote:
Originally Posted by Pinion View Post
I thought you were making a joke until I saw who posted.
Big words from a small value property holder.
Reply With Quote
     
     
  #783  
Old Posted Feb 16, 2016, 8:28 PM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
Was going through the planning report for 3 Civic and found some interesting bits:
  • A large restaurant, with a large outdoor seating area, intended to help animate the ground floor of the building and enhance the pedestrian entry into the community plaza from City Parkway, will be located at the south end of the proposed building, facing both the future 103 Avenue and City Parkway.

  • Two ground-oriented retail units will be provided along the east side of the building, facing the sidewalk along City Parkway.

  • The office component will be clad in floor to ceiling glass curtain wall with a different reveal pattern than the hotel in order to help differentiate the office component of the building from the hotel and residential components of the building.

  • The lower five floors of the shear wall of northern portion of the building will incorporate a green wall that will consist of vines covering a metal trellis structure. The green wall is intended to be visible from the SkyTrain in order to provide visual interest as people enter the City Centre from the SkyTrain.

  • To further enhance the greening of the eastern side of the subject site, the existing Skytrain columns will be treated with a vertical green feature and will be wrapped in a 6-metre (20-ft.) high stainless steel mesh cladding that will eventually be covered in vines and other climbing plants.


Nice to see that there will indeed be a large sidewalk patio for the restaurant at the corner of 103 and City Parkway. Also nice to see that they will be greening the skytrain columns with vines. That space under the new canopy could turn out quite nice.

Report here:
https://www.surrey.ca/bylawsandcouncillibrary/PLR_7911-0334-00.pdf
Reply With Quote
     
     
  #784  
Old Posted Feb 16, 2016, 11:02 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by Shift View Post
  • To further enhance the greening of the eastern side of the subject site, the existing Skytrain columns will be treated with a vertical green feature and will be wrapped in a 6-metre (20-ft.) high stainless steel mesh cladding that will eventually be covered in vines and other climbing plants.
That part sounds great. I wish they'd do the same along the M-Line columns on Lougheed.
Reply With Quote
     
     
  #785  
Old Posted Feb 17, 2016, 8:06 AM
Jack Guevara Jack Guevara is offline
Registered User
 
Join Date: Feb 2013
Posts: 47
Shift, thanks for sharing!
Reply With Quote
     
     
  #786  
Old Posted Feb 17, 2016, 7:52 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,716
The greenery on the columns along Number 3 Road have taken pretty well. The upward-facing lighting on the SkyTrain guideway is also a very nice attribute of the Canada Line, and I wish it were incorporated along the whole network.
__________________
VANCOUVER | Beautiful, Multicultural | Canada's Pacific Metropolis
Reply With Quote
     
     
  #787  
Old Posted Feb 18, 2016, 9:54 PM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
Feb 18

Working on the 3rd residential floor above the exposed mechanical floor now. Also the bend in the residential portion is becoming more visible now.


Last edited by Shift; Feb 19, 2016 at 6:02 AM.
Reply With Quote
     
     
  #788  
Old Posted Feb 18, 2016, 11:44 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Thanks!

The condo and hotel floors are now aligned, too.
Does anyone know if they will share elevators and hallway(s) (i.e. if some condos are placed in a hotel rental pool) or will they be completely separate?
Reply With Quote
     
     
  #789  
Old Posted Feb 19, 2016, 5:51 AM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
Looks like they will be separate based on this elevation drawing. Each side has its own elevator core, with the hotel's separating the 2 sides. Couldn't find any floor plans above the ground floor to verify though.

Reply With Quote
     
     
  #790  
Old Posted Feb 19, 2016, 11:26 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Thanks.
I guess that's for security.
Reply With Quote
     
     
  #791  
Old Posted Feb 29, 2016, 1:25 AM
Nites Nites is offline
Registered User
 
Join Date: Jan 2008
Location: Surrey, BC
Posts: 1,558
Those must be 11-12 foot ceilings for the commercial portion.
Reply With Quote
     
     
  #792  
Old Posted Feb 29, 2016, 10:38 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Posted by Yellow Fever FEe 28th.

Too bad they didn't make the guitar pick windows proportionately larger on the high-ceiling'd office floors - but maybe it was a structural load issue.
They'll get more closely spaced on the low-ceiling'd condo floors.

Quote:
Originally Posted by Yellow Fever View Post
updates.



http://www.skyscrapercity.com/showthread.php?t=1604267&page=5

Quote:
Originally Posted by Yellow Fever View Post


http://www.skyscrapercity.com/showthread.php?t=1604267&page=5

Quote:
Originally Posted by Yellow Fever View Post


http://www.skyscrapercity.com/showthread.php?t=1604267&page=5
Reply With Quote
     
     
  #793  
Old Posted Feb 29, 2016, 11:18 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Are there any plans to redevelop the Surrey Eye Care Center next door?
Reply With Quote
     
     
  #794  
Old Posted Feb 29, 2016, 11:25 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,749
Yeah, it's a future [City Hall] office tower site.
Reply With Quote
     
     
  #795  
Old Posted Mar 6, 2016, 1:32 AM
Shift Shift is offline
Registered User
 
Join Date: Sep 2014
Location: Surrey
Posts: 1,944
March 5



Reply With Quote
     
     
  #796  
Old Posted Mar 6, 2016, 9:00 AM
clee7903 clee7903 is offline
Registered User
 
Join Date: Dec 2010
Location: Surrey
Posts: 330
Looks great...can finally see the 4-5 floors of the apartment unit floors on the left side.
Reply With Quote
     
     
  #797  
Old Posted Mar 7, 2016, 4:01 AM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
I hope the apartment side is clad in nicer glass than what's gone up on the office/hotel portion...
Reply With Quote
     
     
  #798  
Old Posted Mar 7, 2016, 7:34 AM
Nites Nites is offline
Registered User
 
Join Date: Jan 2008
Location: Surrey, BC
Posts: 1,558
The pace is really starting to pickup now. Looks like they are working on the 13/14th floor.
Reply With Quote
     
     
  #799  
Old Posted Mar 8, 2016, 9:39 AM
iron iron is offline
Registered User
 
Join Date: Sep 2015
Posts: 128
The third amendment went out. Estimated completion is now 'Summer 2017', though the fine print says Sept-Nov 2017. It says the guitar pick windows have slowed the pace to 1.5 weeks per floor.
Reply With Quote
     
     
  #800  
Old Posted Mar 9, 2016, 6:18 AM
clee7903 clee7903 is offline
Registered User
 
Join Date: Dec 2010
Location: Surrey
Posts: 330
Quote:
Originally Posted by iron View Post
The third amendment went out. Estimated completion is now 'Summer 2017', though the fine print says Sept-Nov 2017. It says the guitar pick windows have slowed the pace to 1.5 weeks per floor.
Sounds reasonable...this is way taller than most buildings in this area so summer 2017 sounds about right.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Metro Vancouver & the Fraser Valley
Forum Jump



Forum Jump


All times are GMT. The time now is 2:29 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.