Quote:
Originally Posted by Markus83
Hey! Any updates on the go transit storage facility in waterdown errr dundas? Suppose to be complete this year. I also have just read if perhaps no one knew that go will be building a train facility at the Lewis road layover. kind of old, but news to me. They certainly have their hands full of work, perhaps too much at once.
|
GO Bus storage facility to make it easier for people to choose transit
Hamilton, ON, Canada / AM900 CHML | Hamilton News
Ken Mann Posted: March 04, 2016 04:38 pm
There could be more GO Transit buses on our roads soon, thanks to the opening of a new bus service and storage facility near Clappison’s Corners.
That’s according to provincial transportation minister Steven Del Duca who says the location was strategically chosen with easy access to the highway network.
Del Duca adds that the facility can store up to 40 buses and also gives GO Transit space to maintain, inspect, repair and fuel its fleet, the result being more service to the GTHA.
Metrolinx CEO Bruce McQuaig says it is through such investments, that they are going to continue making it easier for people to choose public transit.
The federal and provincial governments picked up the bill for the 24 million dollar facility.
It’s one in a series of investments in the local transit network, along with Hamilton LRT, the West Harbour GO Station and the planned station at Centennial Parkway.
http://www.900chml.com/2016/03/04/64365/
New tracks for West Harbour GO station due this year
Hamilton Spectator By Matthew Van Dongen
New railroad tracks leading into the West Harbour GO station should go live later this year — but that doesn't guarantee more frequent train service at the same time.
Right now, only four trains run through the new $58-million GO station on James Street — and so far, an average of 50 people board a weekday train in the morning. That compares to 420 at the established Hamilton GO Centre on Hunter Street.
Metrolinx officials, in town Friday to tour a new $24-million, 70,000-square-foot GO bus servicing facility, said a second track at the new James Street station should be operational later this year. Work will also resume in the spring on a third track parallel to York Boulevard that will cross a new bridge across the Desjardins canal.
Metrolinx head Bruce McCuaig said he expects an update on GO train service within a few months, but he warned hiking frequency to the west harbour isn't as simple as opening a new railroad track.
He called the junction of railroads that come together between Aldershot and the Desjardin canal "the most complex corner of railway infrastructure in Canada."
McCuaig said negotiations are going well about track usage with both Canadian Pacific and Canadian National Railway, the latter which owns the corridor through the West Harbour GO station.
But while Metrolinx owns about 80 per cent of the railway tracks used by GO trains, CN does not appear interested in selling any part of the Hamilton corridor, McCuaig said.
Transportation Minister Steven Del Duca also declined to estimate when service frequency might improve, but reiterated Hamilton is part of the Metrolinx 10-year regional $13.5-billion express rail plan. "We want to make sure that when we provide (timing) updates, we're able to deliver on them."
Within a decade, Metrolinx has said, commuters will see 15-minute rush-hour service in the "peak direction" between Hamilton GO Centre and Toronto's Union Station; and 30-minute rush-hour service in the peak direction between the new James Street station and Union Station.
Once Hamilton's $1-billion light rail line is constructed, a spur line should also connect King Street to the James Street GO station and possibly beyond to the waterfront.
[email protected]
http://www.thespec.com/news-story/6377218-new-tracks-for-west-harbour-go-station-due-this-year/