Am I the only one who remembers all the branding and work that was done on branding the Millennium line with Phase II extensions along Broadway and PMC?
1998 SkyTrain plans:
The extension to Coquitlam was always considered part of the Millennium line. I still have a booklet somewhere with details. It was awkward the way it was interlined with the Expo line when it was launched, but at least it was accurate. It was one continuous train ride.
I liken it to how they do train lines in New York, with A,B,C trains all sharing two sets of tracks but terminating at different locations outside of NYC.
Now that the EXPO line will run only until Production Way, it even makes sense that Braid and Sapperton get moved to the Expo Line. If we're going to lament the EG Line being dead before it gets started, then we should definitely lament Braid and Sapperton getting deleted completely from the Line they were initially built for and added to an older line. ( Though I think it's the right thing to do )