  #741  
Old Posted Oct 10, 2015, 2:00 AM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,886
Quote:
Originally Posted by Beedok View Post
The crane will probably push 50. It always makes me sad thinking about how the building is shorter than the crane.
on a building this height the crane will likely grow with the core, so it will only be taller than the building's final height for the last few stories.
Reply With Quote
     
     
  #742  
Old Posted Oct 10, 2015, 5:50 PM
GeneralLea's Avatar
GeneralLea GeneralLea is offline
Midtowner since 2K
 
Join Date: Aug 2015
Location: Midtown Toronto
Posts: 5,969
I'm happy to here of this construstion project, I've been wondering when Ottawa would start really developing. Glad to see this nice architecture with an alright height.
Reply With Quote
     
     
  #743  
Old Posted Nov 6, 2015, 9:14 PM
mtcross mtcross is offline
Registered User
 
Join Date: Dec 2014
Posts: 34
Good Progress



Reply With Quote
     
     
  #744  
Old Posted Nov 7, 2015, 12:30 AM
jimmyjones jimmyjones is offline
Registered User
 
Join Date: Nov 2012
Posts: 70
That is one giant hole. Great pics!
Reply With Quote
     
     
  #745  
Old Posted Nov 7, 2015, 12:46 AM
Marcus CLS Marcus CLS is offline
Registered User
 
Join Date: Nov 2007
Posts: 366
I read there was to be 9 floors of parking. I work in the area and check it out everyday at lunch. The staircase is at 10 stories and the blasting has gone at least 2 more levels beyond that. So they are at approx. 12 levels down so far.
Reply With Quote
     
     
  #746  
Old Posted Nov 7, 2015, 4:55 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,886
Quote:
Originally Posted by Marcus CLS View Post
I read there was to be 9 floors of parking. I work in the area and check it out everyday at lunch. The staircase is at 10 stories and the blasting has gone at least 2 more levels beyond that. So they are at approx. 12 levels down so far.
Each complete switchback on the staircase is approximately one floor, I was there this week and I estimated they are around 7 floors deep give or take.
Reply With Quote
     
     
  #747  
Old Posted Nov 30, 2015, 8:23 PM
daud's Avatar
daud daud is offline
Registered User
 
Join Date: Jun 2012
Location: Ottawa
Posts: 762
Very cool drone video footage of the Icon dig:

https://www.facebook.com/ClaridgeIcon/videos/1670457309862556/
Reply With Quote
     
     
  #748  
Old Posted Dec 1, 2015, 2:29 AM
EdFromOttawa EdFromOttawa is offline
Registered User
 
Join Date: Sep 2013
Posts: 365
Serious question...how do the excavators get down into that hole...and more importantly...how do they get out??
Reply With Quote
     
     
  #749  
Old Posted Dec 1, 2015, 3:13 AM
HighwayStar's Avatar
HighwayStar HighwayStar is offline
Registered User
 
Join Date: Jul 2014
Location: PHX (by way of YOW)
Posts: 1,200
Quote:
Originally Posted by EdFromOttawa View Post
Serious question...how do the excavators get down into that hole...and more importantly...how do they get out??
I'm assuming they just dig their way down... and as to getting out, I asked the same question in post 729 in this thread... and the next couple of posts give a good answer...
Reply With Quote
     
     
  #750  
Old Posted Dec 1, 2015, 3:35 PM
little italian little italian is offline
Registered User
 
Join Date: May 2015
Posts: 27
They were drilling until 10:15pm last night. Does that mean they are behind schedule already? Is there a rush to get to a certain stage before winter sets in?
Reply With Quote
     
     
  #751  
Old Posted Dec 8, 2015, 7:18 PM
jitterbug jitterbug is offline
Registered User
 
Join Date: Dec 2006
Posts: 259
Well, it finally happened. This hole is now so deep that the scooper (or whatever the real name for the massive back-hoe is) at ground level can't reach the bottom. So another scooper at the bottom is "feeding" the one above -- in other words each scoop now takes about twice as long to reach the waiting dump truck. Looks like a delicate, and time consuming, task.
Reply With Quote
     
     
  #752  
Old Posted Dec 8, 2015, 8:24 PM
Radster Radster is offline
Registered User
 
Join Date: Oct 2007
Location: Chelsea
Posts: 997
Couldn't they use a type of vertical conveyor belt system to remove all of that crushed stone from that deep hole? Seems like a more logical choice.
Reply With Quote
     
     
  #753  
Old Posted Dec 8, 2015, 9:52 PM
Norman Bates Norman Bates is offline
Living With My Mother
 
Join Date: Feb 2009
Posts: 1,026
I believe that mighty machine is called an excavator.
Reply With Quote
     
     
  #754  
Old Posted Dec 10, 2015, 2:57 AM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,363
That's a tiny lot they are building it on...
Reply With Quote
     
     
  #755  
Old Posted Dec 16, 2015, 3:56 PM
eltodesukane eltodesukane is offline
Registered User
 
Join Date: Dec 2011
Posts: 1,146
From scoop to scoop... Is that efficient?
(quite an amazing reach for the top excavator!)
http://www.westsideaction.com/claridges-icon-going-up/

Last edited by eltodesukane; Dec 17, 2015 at 3:54 PM.
Reply With Quote
     
     
  #756  
Old Posted Dec 16, 2015, 7:10 PM
rocketphish's Avatar
rocketphish rocketphish is online now
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,557
Quote:
Originally Posted by eltodesukane View Post
From scoop to scoop... Is that efficient?
Well, it's certainly less time-efficient than using a single excavator, but they are too deep for that now. On the other hand, it's waaay more cost-efficient than some other methods they could use, such as bucketing it out by helicopter, for instance. It comes down to a cost-benefit analysis.
Reply With Quote
     
     
  #757  
Old Posted Dec 17, 2015, 12:36 AM
ServiceGuy ServiceGuy is offline
Registered User
 
Join Date: Dec 2009
Posts: 335
What they are doing is using any means available to clear the spot for the tower crane base. Once they have that they can dispense with the multiple excavators and just use one to fill a bin lifted out by the crane to finish off excavation. In other words, they are close to done going down and will shortly start the process of going up.
Reply With Quote
     
     
  #758  
Old Posted Dec 17, 2015, 6:13 PM
jitterbug jitterbug is offline
Registered User
 
Join Date: Dec 2006
Posts: 259
Quote:
Originally Posted by ServiceGuy View Post
What they are doing is using any means available to clear the spot for the tower crane base. Once they have that they can dispense with the multiple excavators and just use one to fill a bin lifted out by the crane to finish off excavation. In other words, they are close to done going down and will shortly start the process of going up.
I'm getting a "rise" just thinking about that.
Reply With Quote
     
     
  #759  
Old Posted Jan 4, 2016, 8:38 PM
UrbOttawa UrbOttawa is offline
Registered User
 
Join Date: Oct 2014
Posts: 415
cranes going up today!
Reply With Quote
     
     
  #760  
Old Posted Jan 8, 2016, 12:31 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Building permit - value $13,854,655 - issued Dec 24, 2015
FOUNDATION ONLY - Construct a 47 storey mixed use (retail, office, residential) building with 10 levels of underground parking
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 5:05 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.