  #721  
Old Posted Aug 12, 2015, 1:52 AM
dhottawa729's Avatar
dhottawa729 dhottawa729 is online now
Registered User
 
Join Date: Jul 2009
Posts: 247
Quote:
Originally Posted by Boxster View Post
It will have 10 floors of underground parking. It looks as though they are only down to about P4-P5 at the moment.
Reply With Quote
     
     
  #722  
Old Posted Aug 12, 2015, 4:21 PM
Boxster's Avatar
Boxster Boxster is offline
Registered User
 
Join Date: May 2012
Posts: 996
Quote:
Originally Posted by dhottawa729 View Post
It will have 10 floors of underground parking. It looks as though they are only down to about P4-P5 at the moment.


Enough to get very dizzy!
__________________
The Fast One!
Reply With Quote
     
     
  #723  
Old Posted Aug 13, 2015, 10:37 PM
Harley613's Avatar
Harley613 Harley613 is online now
Registered User
 
Join Date: Jun 2009
Location: Aylmer, QC
Posts: 6,886
Today's Progress:
https://youtu.be/x5JkkOuoKRQ
Reply With Quote
     
     
  #724  
Old Posted Aug 18, 2015, 2:55 AM
mtcross mtcross is offline
Registered User
 
Join Date: Dec 2014
Posts: 34
More Pictures





Reply With Quote
     
     
  #725  
Old Posted Aug 18, 2015, 3:41 AM
cr872190 cr872190 is offline
Registered User
 
Join Date: Aug 2013
Posts: 411
They've got a loooong way to go. Looks like they aren't even half way down far enough.
Reply With Quote
     
     
  #726  
Old Posted Aug 18, 2015, 2:22 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by cr872190 View Post
They've got a loooong way to go. Looks like they aren't even half way down far enough.
Claridge said last year that it would take them 4 years to build: all of 2015, 2016, 2017, and 2018, with occupancy in late 2018 or early 2019. Construction on the tower itself is not supposed to start until early 2017... it's all below-grade work until then.
__________________
"It is only because the control of the means of production is divided among many people acting independently that nobody has complete power over us, that we as individuals can decide what to do with ourselves." - Friedrich Hayek
Reply With Quote
     
     
  #727  
Old Posted Aug 18, 2015, 5:51 PM
dhottawa729's Avatar
dhottawa729 dhottawa729 is online now
Registered User
 
Join Date: Jul 2009
Posts: 247
Quote:
Originally Posted by Harley613 View Post
April 21, 2015
Just looking though the older posts and they started blasting just over 4 months ago, around April 21st. They seem to be around P4 right now, I would guess, so I figure it would take at least 6 more months until they bottom out... or maybe progress will be slower as they get deeper because getting the rock out becomes more challenging.
Reply With Quote
     
     
  #728  
Old Posted Aug 18, 2015, 7:08 PM
cr872190 cr872190 is offline
Registered User
 
Join Date: Aug 2013
Posts: 411
Quote:
Originally Posted by dhottawa729 View Post
Just looking though the older posts and they started blasting just over 4 months ago, around April 21st. They seem to be around P4 right now, I would guess, so I figure it would take at least 6 more months until they bottom out... or maybe progress will be slower as they get deeper because getting the rock out becomes more challenging.
P4 seems like a bit of a stretch.
Reply With Quote
     
     
  #729  
Old Posted Aug 18, 2015, 7:40 PM
HighwayStar's Avatar
HighwayStar HighwayStar is online now
Registered User
 
Join Date: Jul 2014
Location: PHX (by way of YOW)
Posts: 1,200
And I do have to ask how they get those backhoes out of there?? I'm assuming a "bigger" type crane.. but they just seem kind of bulky and heavy...

Last edited by HighwayStar; Aug 19, 2015 at 2:47 AM.
Reply With Quote
     
     
  #730  
Old Posted Aug 20, 2015, 3:54 PM
MarkR MarkR is offline
Registered User
 
Join Date: Apr 2015
Posts: 149
Quote:
Originally Posted by HighwayStar View Post
And I do have to ask how they get those backhoes out of there?? I'm assuming a "bigger" type crane.. but they just seem kind of bulky and heavy...

And where does all this excavated rock go? I presume either held for some future landfill project, with possibly the larger rocks being sold to landscaping companies.
Reply With Quote
     
     
  #731  
Old Posted Aug 21, 2015, 12:41 AM
ServiceGuy ServiceGuy is offline
Registered User
 
Join Date: Dec 2009
Posts: 335
Quote:
Originally Posted by HighwayStar View Post
And I do have to ask how they get those backhoes out of there?? I'm assuming a "bigger" type crane.. but they just seem kind of bulky and heavy...
Bigger crane for sure. What they will do is remove the arms (or booms) and then lift out the body and tracks as one unit. They will use the type of crane that shows up with about 8 tractor trailer trucks in tow carrying the counter weights and other parts.

Quote:
Originally Posted by MarkR View Post
And where does all this excavated rock go? I presume either held for some future landfill project, with possibly the larger rocks being sold to landscaping companies.
That rock goes to a quarry usually owned by the same company that is trucking away the fill to be crushed into gravel for road projects.
Reply With Quote
     
     
  #732  
Old Posted Oct 5, 2015, 2:26 AM
mtcross mtcross is offline
Registered User
 
Join Date: Dec 2014
Posts: 34
New Pics



Reply With Quote
     
     
  #733  
Old Posted Oct 5, 2015, 8:08 PM
Radster Radster is offline
Registered User
 
Join Date: Oct 2007
Location: Chelsea
Posts: 997
My guess is P6 or maybe even P7 by now.
Reply With Quote
     
     
  #734  
Old Posted Oct 5, 2015, 8:13 PM
cr872190 cr872190 is offline
Registered User
 
Join Date: Aug 2013
Posts: 411
Does that not seem incredibly dangerous having an excavator lean that far down to pick up rocks?
Reply With Quote
     
     
  #735  
Old Posted Oct 6, 2015, 2:21 AM
Davis137's Avatar
Davis137 Davis137 is offline
Registered User
 
Join Date: Aug 2008
Posts: 2,363
Hole is getting big for sure. It will be awesome to see it fill in with garage and mechanical floors, and eventually rise above grade...
Reply With Quote
     
     
  #736  
Old Posted Oct 6, 2015, 4:06 AM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,400
Quote:
Originally Posted by cr872190 View Post
Does that not seem incredibly dangerous having an excavator lean that far down to pick up rocks?
It's not leaning into the hole, it's sitting on solid ground. Excavators are designed to have safe lifting capacities at various arm extensions, on a chart usually stuck inside the cab. This identifies whether the weight restriction is based on tipping over, or hydraulic force. With the arm that long, as long as the bucket is kelp close to the base, the limit would likely be the hydraulic force available long before the machine came close to tipping. Even if the operator managed to lift the back track off the ground, they likely have the skill to stabilize the machine well before it has any risk of falling in.
Reply With Quote
     
     
  #737  
Old Posted Oct 8, 2015, 6:35 PM
jitterbug jitterbug is offline
Registered User
 
Join Date: Dec 2006
Posts: 259
I've watched them scoop large boulders out of that massive hole and it's an impressive sight. As interesting as all this is, I'm more looking forward to seeing a 45-storey crane there!
Reply With Quote
     
     
  #738  
Old Posted Oct 8, 2015, 6:46 PM
HighwayStar's Avatar
HighwayStar HighwayStar is online now
Registered User
 
Join Date: Jul 2014
Location: PHX (by way of YOW)
Posts: 1,200
Quote:
Originally Posted by jitterbug View Post
I've watched them scoop large boulders out of that massive hole and it's an impressive sight. As interesting as all this is, I'm more looking forward to seeing a 45-storey crane there!
Agreed... A couple of days ago, I sat behind it and watched it fill a couple of dump trucks. I can confirm the "back end" is more than firmly on then ground.

Man that is one big honkin' hole though... can't wait for the cranes too!!
Reply With Quote
     
     
  #739  
Old Posted Oct 9, 2015, 4:39 PM
Arcologist Arcologist is offline
Registered User
 
Join Date: Oct 2011
Location: The Nation's Capital
Posts: 696
Wow, that is one BIG hole, and a LOT of rock! Impressive!
Reply With Quote
     
     
  #740  
Old Posted Oct 9, 2015, 7:31 PM
Beedok Beedok is offline
Exiled Hamiltonian Gal
 
Join Date: Jun 2012
Posts: 6,793
Quote:
Originally Posted by jitterbug View Post
I've watched them scoop large boulders out of that massive hole and it's an impressive sight. As interesting as all this is, I'm more looking forward to seeing a 45-storey crane there!
The crane will probably push 50. It always makes me sad thinking about how the building is shorter than the crane.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 9:00 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.