Quote:
Originally Posted by officedweller
See the 2nd sentence of the 2nd paragraph in the bulletin you quoted....
Tunnel pics showed an overhead conveyor belt to remove the spoil.
|
Likely to speed things up, the dismantling of the TBM will happen at both portals. ie: the conveyor belt, hydraulics, electrics and muck train rails will be dismantled out the north portal, and the main TBM machine will be dismantled out the south portal.
After SELI has removed all traces of the TBM and associated equipment - leaving just the bare tunnel concrete rings, then the precast concrete for the trackbeds and dividing walls can be installed, followed by the rails, conduits and other needed parts of the finished tracks, and safety systems.
With luck, they may be able to run the first test train through the tunnel in the late summer.