View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #7021  
Old Posted Oct 26, 2015, 3:09 AM
BCPhil BCPhil is offline
Registered User
 
Join Date: Jun 2009
Location: Surrey
Posts: 2,578
Quote:
Originally Posted by GlassCity View Post
I think TransLink's already said that if SkyTrain was built to Langley, it would in fact short turn at King George and only have every 2nd train go to Langley.

Also I just wanna point out, it's funny how some people (not you guys) say Broadway shouldn't get SkyTrain past Arbutus because it's not dense enough, yet support SkyTrain to Langley. Like if you think Fraser Highway is dense enough for SkyTrain, surely West Broadway is as well.
I don't think you would need to short turn half the trains at King George. The trains currently arrive almost completely full at Surrey Center and King George, with many of those people transferring to buses that head east of 148 St. And expanding Skytrain into Fleetwood would attract a lot of riders that are currently in a transit no mans land that would become a 5 minute bus ride to a station. You could easily run every Expo line train to 168 St and they would be pretty full.

Now, I would love to see Skytrain all the way to UBC.

But you do have to consider the cost. While it might actually generate more passengers per km than Skytrain in Surrey, and maybe even more new passengers per dollar spent, the sum of money you need at one time might be beyond what we are capable of assembling.

Skytrain to UBC might be the most beneficial project we could do in BC right now; we might get the most benefit out of doing it; it could even be profitable; but the money might be impossible to assemble. if it is a $5+ billion project to build to UBC, it might just be a sum of money we cannot come up with at one time for one project.

I do actually think they should all be done in stages. Skytrain to Langley should first be built out to 168 St as Phase 1, then completed to Langley Center later. And Broadway should be built to Arbutus as phase 1, and out to UBC later as phase 2. You would get immediate gains in both areas (that would be huge game changers for so many people) while still having plans for the future.

The full lines should be identified as our long term goals, something we will do for sure, and build them as money becomes available. You could even further phase in the Langley line. Just build it a couple stations at a time. That's they approach they started using with expansion in Surrey (first to Scott Road, the King George).
     
     
  #7022  
Old Posted Oct 26, 2015, 3:14 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Quote:
Originally Posted by MIPS View Post
Hmm. I wonder the options are for an underground OMC...
Unless the TBM runs into Yamashita's gold, none!


I would expect 2/3 of Expo Line trains to travel to King George and 1/3 to go to Production Way.
     
     
  #7023  
Old Posted Oct 26, 2015, 3:32 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,593
Quote:
Originally Posted by BCPhil View Post
I don't think you would need to short turn half the trains at King George. The trains currently arrive almost completely full at Surrey Center and King George, with many of those people transferring to buses that head east of 148 St. And expanding Skytrain into Fleetwood would attract a lot of riders that are currently in a transit no mans land that would become a 5 minute bus ride to a station. You could easily run every Expo line train to 168 St and they would be pretty full.

Now, I would love to see Skytrain all the way to UBC.

But you do have to consider the cost. While it might actually generate more passengers per km than Skytrain in Surrey, and maybe even more new passengers per dollar spent, the sum of money you need at one time might be beyond what we are capable of assembling.

Skytrain to UBC might be the most beneficial project we could do in BC right now; we might get the most benefit out of doing it; it could even be profitable; but the money might be impossible to assemble. if it is a $5+ billion project to build to UBC, it might just be a sum of money we cannot come up with at one time for one project.

I do actually think they should all be done in stages. Skytrain to Langley should first be built out to 168 St as Phase 1, then completed to Langley Center later. And Broadway should be built to Arbutus as phase 1, and out to UBC later as phase 2. You would get immediate gains in both areas (that would be huge game changers for so many people) while still having plans for the future.

The full lines should be identified as our long term goals, something we will do for sure, and build them as money becomes available. You could even further phase in the Langley line. Just build it a couple stations at a time. That's they approach they started using with expansion in Surrey (first to Scott Road, the King George).


If they have any sense (which is always questionable) they'll build the Skytrain down Fraser Hwy a few stations at a time and then open them while building the next few. I could easily see them doing this until 168th and then taking a break before continuing to Langley in exactly the same manner.

Broadway on the other hand... Tunnelling is going to be a long expensive process. Would it be possible to move the end pit as they go, and so open to Cambie and then Arbutus (I honestly have no idea if it's possible). I foresee Arbutus to UBC being in the distant future solely due to lack of money. Unless someone gifts the money for it, I really can't see how we can afford that long of a bored tunnel.
     
     
  #7024  
Old Posted Oct 26, 2015, 3:35 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,593
Quote:
Originally Posted by red-paladin View Post
Unless the TBM runs into Yamashita's gold, none!
Well if it's the Evergreen OMC and they dig down now (kind of like for underground parking for towers) then yeah sure it's possible. Digging it bored tunnel style though, uhm
     
     
  #7025  
Old Posted Oct 26, 2015, 4:00 AM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by MIPS View Post
Hmm. I wonder the options are for an underground OMC...
You don't really need that. You don't need every train to be in the OMC overnight, you can store trains at the terminal stations and other areas along the line (such as pocket tracks) and only have those trains that need maintenance/cleaning at the OMC overnight.
     
     
  #7026  
Old Posted Oct 26, 2015, 5:49 AM
MIPS's Avatar
MIPS MIPS is online now
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,092
Quote:
Originally Posted by Sheba View Post
Well if it's the Evergreen OMC and they dig down now (kind of like for underground parking for towers) then yeah sure it's possible. Digging it bored tunnel style though, uhm
cut and cover under Broadway and burrard.
     
     
  #7027  
Old Posted Oct 26, 2015, 6:34 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,095
Quote:
Originally Posted by Jebby View Post
You don't really need that. You don't need every train to be in the OMC overnight, you can store trains at the terminal stations and other areas along the line (such as pocket tracks) and only have those trains that need maintenance/cleaning at the OMC overnight.
They can certainly do that. Before the yard expansion in 2008, it only have enough space to store 114 of the 150 MKIs. The other 36 MKIs were stored on the mainline track overnight. Now there is enough space to store all vehicles, but not every vehicle go back at night.
     
     
  #7028  
Old Posted Oct 26, 2015, 6:51 AM
xd_1771's Avatar
xd_1771 xd_1771 is offline
(daka_x)
 
Join Date: Aug 2010
Location: Metro Vancouver, Canada
Posts: 1,740
^ The ability to have on-track storage is definitely one of the few underappreciated traits of our SkyTrain system driver-less design, as it really allows us to reduce the land footprint needed for train storage, in a metropolitan area with one of the highest land prices on earth. Our linear motor propulsion also means that we don't need large facilities for maintenance because there isn't a lot to maintain anyway. So I think that's a key reason why the Evergreen Line's OMC is only being built as a "partial" facility. It's likely it's that we can have some sort of facilitation for what would otherwise be a separate line on our system (with incoming extensions of its own).

Trains don't have to be stored on tail/side tracks when it's out-of-service time. Sometimes when I arrive at the King George Station area (current place of residence) after hours, there are usually multiple trains parked on the tail track beyond the station but also on both tracks in the station itself, probably ready to be activated for morning service. In effect the entire system is like one big train yard since there's no need for drivers to walk up to the train in the morning and away from them at the end of the night. At this point, OMC need is probably more about strategic position so that cars that do need maintenance do not need to, say, loop around the entire system to get to the yard.

So a Broadway extension or a Surrey extension may not even need any new OMC-related development - especially as newer-generation vehicles will probably create even less maintenance needs with newer parts and systems. Both rapid transit expansion studies (Broadway, Surrey RTS) assumed some sort of vague OMC need - but effectively that would be finalized in the phase 3 planning process. We'll know sometime for Broadway, although harder to say for Surrey (since the Mayors' Council dictation has basically shut down all work on anything that isn't LRT so at the moment there isn't a chance we'll know)
     
     
  #7029  
Old Posted Oct 27, 2015, 12:02 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by MIPS View Post
Hmm. I wonder the options are for an underground OMC...
Why go underground, when the new Broadway line runs south of the Rocky Mountaineer station and between the BNSF yards and the new Emily Carr campus?

Build a new OMC over part of the existing train yards between Home Depot and the new GNW campus.
     
     
  #7030  
Old Posted Oct 27, 2015, 12:16 AM
jlousa's Avatar
jlousa jlousa is offline
Ferris Wheel Hater
 
Join Date: Jun 2006
Posts: 8,371
Or you can build it over the home depot parking lot, customers get cover and you can connect it to both the M-Line and E-Line easily. I'm j/k.
Don't think there is another need for a OMC at this point, and if the Surrey line does become skytrain you can build one out east cheaper.
     
     
  #7031  
Old Posted Oct 27, 2015, 4:42 AM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by jlousa View Post
O
Don't think there is another need for a OMC at this point, and if the Surrey line does become skytrain you can build one out east cheaper.
A big train yard could be built between Surrey and Langley on cheap land.
     
     
  #7032  
Old Posted Oct 31, 2015, 10:04 PM
AMTDGT AMTDGT is offline
Registered User
 
Join Date: Jul 2009
Posts: 133
Quote:
Originally Posted by Jebby View Post
A big train yard could be built between Surrey and Langley on cheap land.

They were coring today (Saturday) in the middle of Broadway on the west side of Cambie.
     
     
  #7033  
Old Posted Nov 1, 2015, 12:07 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,052
Quote:
Originally Posted by Sheba View Post


If they have any sense (which is always questionable) they'll build the Skytrain down Fraser Hwy a few stations at a time and then open them while building the next few. I could easily see them doing this until 168th and then taking a break before continuing to Langley in exactly the same manner.

Broadway on the other hand... Tunnelling is going to be a long expensive process. Would it be possible to move the end pit as they go, and so open to Cambie and then Arbutus (I honestly have no idea if it's possible). I foresee Arbutus to UBC being in the distant future solely due to lack of money. Unless someone gifts the money for it, I really can't see how we can afford that long of a bored tunnel.
Maybe this is where Justin might help out.
     
     
  #7034  
Old Posted Nov 1, 2015, 3:15 AM
retro_orange retro_orange is offline
retro_orange
 
Join Date: Sep 2014
Location: East Van
Posts: 2,029
Quote:
Originally Posted by trofirhen View Post
Maybe this is where Justin might help out.
You could say he's 'Just-in' time to save the day. I should be him for Halloween next year.
     
     
  #7035  
Old Posted Nov 1, 2015, 3:28 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,052
Quote:
Originally Posted by retro_orange View Post
You could say he's 'Just-in' time to save the day. I should be him for Halloween next year.
Try it out. It might work.
     
     
  #7036  
Old Posted Nov 1, 2015, 10:34 AM
retro_orange retro_orange is offline
retro_orange
 
Join Date: Sep 2014
Location: East Van
Posts: 2,029
Quote:
Originally Posted by trofirhen View Post
Try it out. It might work.


Haha. I already voted for the guy.
     
     
  #7037  
Old Posted Nov 2, 2015, 10:17 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
I just noticed a crew taking core samples north of Broadway @ Laurel today.

Not sure if this is part of the Broadway / UBC extension pre-engineering, but it kinda makes sense to have the Oak station running from Oak to Laurel - and have station entrances at each street.

The new building on the SW corner of Broadway @ Oak is being built with a station entrance ready to connect to the station mezzanine.

An entrance at Laurel would make access by the VGH staff easier.
     
     
  #7038  
Old Posted Nov 3, 2015, 2:27 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,790
Quote:
Originally Posted by jsbertram View Post
Not sure if this is part of the Broadway / UBC extension pre-engineering, but it kinda makes sense to have the Oak station running from Oak to Laurel - and have station entrances at each street.
I really, really hope they don't cheap out like the Canada Line did and have only one entrance per station. One of the things I always loved about the Toronto subway system was the plethora of entrances for the stations, with major intersections getting entrances on all four corners.
     
     
  #7039  
Old Posted Nov 3, 2015, 3:31 AM
Rico Rico is offline
Registered User
 
Join Date: Feb 2012
Posts: 319
I would be surprised if they did not learn from the Canada Line experience combined with the need to add entrances to Expo line stations during the upgrades....that said I would guess they will limit access to 2 per station because of cost.
     
     
  #7040  
Old Posted Nov 3, 2015, 5:11 PM
TransitFreak TransitFreak is offline
Registered User
 
Join Date: Oct 2009
Posts: 194
Not primarily cost it's CPTED accommodations. Given the openness of the system community response was to have one entry point for safety reasons. Also why the extensive use of glazing for station houses instead of mesh. One direction escalators are cost items
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 4:48 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.