I think TransLink's already said that if SkyTrain was built to Langley, it would in fact short turn at King George and only have every 2nd train go to Langley.
Also I just wanna point out, it's funny how some people (not you guys) say Broadway shouldn't get SkyTrain past Arbutus because it's not dense enough, yet support SkyTrain to Langley. Like if you think Fraser Highway is dense enough for SkyTrain, surely West Broadway is as well.
|
I don't think you would need to short turn half the trains at King George. The trains currently arrive almost completely full at Surrey Center and King George, with many of those people transferring to buses that head east of 148 St. And expanding Skytrain into Fleetwood would attract a lot of riders that are currently in a transit no mans land that would become a 5 minute bus ride to a station. You could easily run every Expo line train to 168 St and they would be pretty full.
Now, I would love to see Skytrain all the way to UBC.
But you do have to consider the cost. While it might actually generate more passengers per km than Skytrain in Surrey, and maybe even more new passengers per dollar spent, the sum of money you need at one time might be beyond what we are capable of assembling.
Skytrain to UBC might be the most beneficial project we could do in BC right now; we might get the most benefit out of doing it; it could even be profitable; but the money might be impossible to assemble. if it is a $5+ billion project to build to UBC, it might just be a sum of money we cannot come up with at one time for one project.
I do actually think they should all be done in stages. Skytrain to Langley should first be built out to 168 St as Phase 1, then completed to Langley Center later. And Broadway should be built to Arbutus as phase 1, and out to UBC later as phase 2. You would get immediate gains in both areas (that would be huge game changers for so many people) while still having plans for the future.
The full lines should be identified as our long term goals, something we will do for sure, and build them as money becomes available. You could even further phase in the Langley line. Just build it a couple stations at a time. That's they approach they started using with expansion in Surrey (first to Scott Road, the King George).