Quote:
Originally Posted by bflatflat9
Thanks for the update.
It's somewhat encouraging, although it's still about a year out for 80% occupancy, which, I think someone said--I think you Future Mayor--that is the yardstick for starting the Cascade.
I think we'll have a years' worth of lull, and hopefully get Cascade, CCH, 151, AND the Regent Hotel all moving forward simultaneously. Oh, and maybe the mixed-use once called, or should I say NEE, the AIR. 2017 should have multiple cranes dotting the skyline.
|
I have no exact knowledge of the 80% threshold, that is simply my estimation, and what is logical to me. I do wonder if maybe they would look at it building by building, style by style or price point by price point basis, when considering when to build Cascade.
I look at the design for Cascade and it seems like it's trying to hit a similar demographic to The Regent. I believe Cascade is supposed to be around 19-20 floors, correct me if I'm wrong, although I wish it were 8-12 more.
Let's base the Cascade on the Regent. 20 floors, floor 2 has 7 units, 3 has 4, 4-16 are the floors with 9 units, floors 17-19 have 6 units and floor 20 has 4 units.
Regent:
2-16; 128 units available, 111 reserved. That's 86.7% Of those 17 units that are not sold/reserved, all 17 are on floors 13-16, everything 12 and below is completely sold/reserved.
So if we applied that logic to Cascade as a similar style of building, targeting a similar demographic, with a similar price point. It might make sense to start building the Cascade sooner rather than later, considering the entire Regent is nearly at 90%.
It will take several years to build the Cascade and I would assume they would get several deposits on units as soon as they announced it. During Cascade construction I imagine that the demographic for 99 West and Richards Court will continue to slowly buy those units, and more Regent units will be sold as well, most likely reaching the 80% overall total by the time Cascade opens. The total 80% threshold is 49 more units, since the 9/18/14 update to today, 45 units have sold or been reserved, even if that pace were cut in half, if Cascade started today and took two years, that 80% would be nearly reached.
Ok PRI, as soon as the crane is done at 111 just move it over to Cascade.