It should be possible to run the northeast spur between Gateway and Raleigh off the Eastern RT line. You could then basically go from the north Perimeter to almost the south Perimeter on rapid transit.
|
That NE line will be sweet. What would one think. Have grade separations at the various crossings (Chalmers, Munroe, Concordia/Kimberly, McLeod, Springfield, Chief) Or go at grade.
The old rail bed is already 1m-2m higher than the roads on either side. You could dig that down probably 3m-4m from where it is now, without requiring a pump. So would seem feasible to have grade separations without too much work required. And with the relatively low cost for the rest of the corridor (basically just a road and a new path), wouldn't blow the budget. It would then get the AT path out of the intersections. I find cyclists will try to blow through the intersections without even stopping. Some of the more pro cyclist ones. Then give you a nasty look when you slam on the brakes.