Quote:
Originally Posted by Ridgerunner View Post
I have been off this site for a while.

Has someone got some pics of the TBM in action ?
somethingsomething security risk something.
     
     
  #8802  
Old Posted Sep 5, 2015, 9:03 PM
Alex Mackinnon's Avatar
Alex Mackinnon Alex Mackinnon is online now
Can I has a tunnel?
 
Join Date: May 2008
Location: East Van
Posts: 2,220
Quote:
Originally Posted by MIPS View Post
somethingsomething security risk something.
Nah, it's just confidential until the risk of claims has passed or until all claims are settled. I suspect we won't hear what the issues are until a Tunnel Association talk a year or two down the road.

I'm looking forward to being able to give a couple presentations on the Seymour Capilano Twin Tunnels soon. The legal wrap-up often lasts longer than the project though. I helped commission those tunnels from January to March this year. There's not much we can about them yet, other than the fact that you've probably already been drinking the water that passed through them.
     
     
  #8803  
Old Posted Sep 6, 2015, 6:44 PM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
The Evergreen line's tracks are being welded instead of bolted:


From http://www.evergreenline.gov.bc.ca/
     
     
  #8804  
Old Posted Sep 6, 2015, 8:05 PM
Meraki Meraki is offline
Registered User
 
Join Date: Mar 2012
Posts: 473
All of our lines are welded. There's a spot by Scott Road westbound before the SkyBridge that isn't for whatever reason, but most of everything is.
     
     
  #8805  
Old Posted Sep 7, 2015, 3:16 AM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
Quote:
Originally Posted by TransitJack View Post
...I think all this fuss is blown out of proportion by a Global news reporter whom in his own story used a lot of words like "might" and "maybe". He talks about "rusty rails" in the report, but new rail is rusty until they profile grind it (which clearly they don't need to do yet -- they are still installing it). http://globalnews.ca/news/2189822/evergreen-line-delays-causes-financial-pain-for-contractor/
Really? Isn't profile grinding a maintenance process that would only be done a ell into a rail system's life span? Why would a brand new rail line require this - isn't the correct profile forged onto the rail segments at the factory?

Last edited by Olden Retreiver; Sep 7, 2015 at 5:29 AM. Reason: Correct spelling
     
     
  #8806  
Old Posted Sep 7, 2015, 4:11 AM
Express691 Express691 is offline
Registered User
 
Join Date: Aug 2015
Posts: 650
Quote:
Originally Posted by Meraki View Post
All of our lines are welded. There's a spot by Scott Road westbound before the SkyBridge that isn't for whatever reason, but most of everything is.
The tracks are also like that just after the 2nd tower. I believe they are the equivalent to bridge expansion joints too add some flexibility.
     
     
  #8807  
Old Posted Sep 8, 2015, 8:40 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Of interest (but off topic) - article and link to the track "bridges" that'll be needed for Seattle's LRT line across the I-90 floating bridge:
http://www.seattletimes.com/seattle-news...d-to-finish-east-link-light-rail-design/
     
     
  #8808  
Old Posted Sep 9, 2015, 5:52 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,408
Quote:
Originally Posted by officedweller View Post
Of interest (but off topic) - article and link to the track "bridges" that'll be needed for Seattle's LRT line across the I-90 floating bridge:
http://www.seattletimes.com/seattle-news...d-to-finish-east-link-light-rail-design/
Good to see their LRT expansion moving forward. What is the reason for Lake Washington having two floating bridges? Is the lake too deep for normal bridges? It isn't very wide lake.
     
     
  #8809  
Old Posted Sep 9, 2015, 8:46 AM
GeeCee's Avatar
GeeCee GeeCee is offline
Registered User
 
Join Date: Jan 2009
Location: Port Coquitlam, BC
Posts: 2,816
Quote:
Originally Posted by Klazu View Post
Good to see their LRT expansion moving forward. What is the reason for Lake Washington having two floating bridges? Is the lake too deep for normal bridges? It isn't very wide lake.
It's too deep (there's a lot of silt at the bottom of the lake) for a normal bridge, and there are curves on both routes (I-90 and SR520) so they can't use suspension bridges.
     
     
  #8810  
Old Posted Sep 9, 2015, 1:55 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,740
Also the fact that it's a lake makes a floating bridge possible. If that body of water was connected to an ocean they'd probably re-visit one of the other options.
     
     
  #8811  
Old Posted Sep 9, 2015, 5:41 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is online now
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,740
Nine Months Behind Schedule

http://www.theprovince.com/news/evergree...+tunnel+machine+idle/11348327/story.html

Highlights:

MOT says the overall project is 70% complete.

The tunnel is 53% complete today.

Tunnel was started in June 2014, expected to take 7 months. 53% has taken 16 months.

Some talk already about a 2017 opening.
     
     
  #8812  
Old Posted Sep 9, 2015, 6:12 PM
finalcoolman finalcoolman is offline
Registered User
 
Join Date: Nov 2004
Posts: 262
I hate how Jordan Bateman has positioned himself as the go to all knowing transit/engineering /geological expert on all things Translink.
     
     
  #8813  
Old Posted Sep 9, 2015, 10:51 PM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Quote:
Originally Posted by finalcoolman View Post
I hate how Jordan Bateman has positioned himself as the go to all knowing transit/engineering /geological expert on all things Translink.
Right?

He who screams the loudest I guess gets all the attention.
     
     
  #8814  
Old Posted Sep 10, 2015, 3:29 AM
Ridgerunner Ridgerunner is offline
BANNED
 
Join Date: Dec 2014
Posts: 144
TBM restart

Everyone:

The Evergreen line web site had an update as of August that predicts a TBM restart for "early September".

Well ... direct from the horse's mouth.

Maybe it will get started after all.

Here is hoping.
     
     
  #8815  
Old Posted Sep 10, 2015, 6:59 AM
BCPhil BCPhil is offline
Registered User
 
Join Date: Jun 2009
Location: Surrey
Posts: 2,578
Quote:
Originally Posted by WarrenC12 View Post
Also the fact that it's a lake makes a floating bridge possible. If that body of water was connected to an ocean they'd probably re-visit one of the other options.
Hood Canal Bridge:

https://en.wikipedia.org/wiki/Hood_Canal_Bridge

... although, it did sink once.
     
     
  #8816  
Old Posted Sep 10, 2015, 2:51 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by BCPhil View Post
Hood Canal Bridge:

https://en.wikipedia.org/wiki/Hood_Canal_Bridge

... although, it did sink once.
I love the design of the bridge with the retractable span to open up for marine traffic.
     
     
  #8817  
Old Posted Sep 11, 2015, 7:01 PM
Olden Retreiver Olden Retreiver is offline
Registered User
 
Join Date: Nov 2013
Posts: 263
"Resume tunnelling by the end of this week" is sounding just like "resume tunnelling by late July"
https://www.youtube.com/watch?v=K8E_zMLCRNg
     
     
  #8818  
Old Posted Sep 11, 2015, 8:32 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
No timeline...

BTW - the Minister's comment about opening on time is likely posturing to continue pressure on the contractor.
You can't be seen to acquiesce in a delay (or it might jeopardize your ability to claim damages later) - so they have to continue saying they expect it to be finished "on time" (as adjusted).

Quote:
No timeline for tunnel boring to resume for the Evergreen Line
by Sonia Aslam
Posted Sep 11, 2015 1:04 pm PDT

PORT MOODY (NEWS 1130) – After promising for months the tunnel boring machine working on the Evergreen Line would be working by the fall, the provincial government now says it doesn’t have a timeline.

The machine has been sitting idle for months; you can blame several sinkholes during construction for that.

Crews have said they were surprised at the conditions of the sandy soil that kept getting stuck in the machine. Repairs have been completed, but the province still doesn’t know when tunnel boring will resume again in the Port Moody area.

Despite all this, Transportation Minister Todd Stone is confident it will finish on time.

“I’m still doing everything that I can to make sure that the Evergreen project team — and through them, the contractors — understand that we still very much expect this project to be up and running within the timeframes that are understood by everyone at this point.”

“There is no question we have lost some time — that’s frustating, but we’re going to continue to do everything we possibly can to get this tunnel work done so that we can proceed with opening this critical addition to the Lower Mainland’s transit network,” he adds.

But in a statement from the ministry, it now says the end goal of the fall of 2016 could potentially be in jeopardy unless everything goes as planned in the coming months, but there are no guarantees.

“We will let people know if there are any further schedule implications. Despite the delay, the contract language is clear: EGRT is on the hook to address any challenges that may arise and will cover all the costs connected to this work. Government will continue to hold EGRT to their agreement.”

“This was a key part of the contract we signed in order to protect British Columbia taxpayers from the costs of any potential challenges. This includes all delays associated with the project and any extra costs related to the tunnel boring machine.”
...
http://www.news1130.com/2015/09/11/no-timeline-tunnel-boring-evergreen-line/
     
     
  #8819  
Old Posted Sep 11, 2015, 11:04 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Tunnel almost complete after five years

http://globalnews.ca/news/2214719/huge-water-tunnel-under-the-fraser-river-nearing-completion/

No more dry spells in Surrey.

There's hope for the Evergreen tunnel...
     
     
  #8820  
Old Posted Sep 13, 2015, 9:13 PM
Ridgerunner Ridgerunner is offline
BANNED
 
Join Date: Dec 2014
Posts: 144
Highlights:

MOT says the overall project is 70% complete.

The tunnel is 53% complete today.

Tunnel was started in June 2014, expected to take 7 months. 53% has taken 16 months.

Some talk already about a 2017 opening.[/QUOTE]

The earliest that the Evergreen line can open is February 2017. And that calculation depends on the TBM restarting this month.

The bulletin from the Translink web site says that the TBM restarts in "early September" .... I guess anything before the 29th of this month is "early".

I just can't see it any other way.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 9:02 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.