Quote:
Originally Posted by red-paladin
It's being used for the refurb of the Mk I trains also.
|
The MkIII cars are arriving this year, and scheduled to start running in service January 2016.
The OMC2 is in use to refurb the original MkI cars, which is scheduled to be done in December 2016.
With the year-long overlap in 2016, I'm not sure how the MkI refurb and MkIII standard maintenance can be done in that building.
Perhaps they will break the 4-car trains (A-C-C-B) into 2-car subsets (A-C and C-B) for maintenance IN OMC1 and then re-connect them into 4-car trains again.
That will be a real pain to do every time a MkIII train comes in for service or repairs.
The weird shunting track for OMC2 suggests to me that cars can be moved in to or out of the OMC2 only one car at a time. This would make maintenance on the MkIII trains even more problematic if the entire train has to be broken into individual cars just to get them into OMC2.
However, it appears to me that the OMC2 shunting track isn't long enough to hold a 4-car train while it is being separated into single cars for maintenance or re-assembled afterward.