Quote:
Originally Posted by lrt's friend View Post
It has to work around three major waterways, which blocks streets in many places, the Ottawa River, Rideau River and Rideau Canal.
The waterways are the least of Ottawa's road-planning problems, esp. since the Ottawa River only has a few transit crossings.

The real problems are the Brownbelt and the god-awful 50s-style suburban street blobs THAT THE CITY OF OTTAWA CONTINUES TO APPROVE IN THE 21ST CENTURY.

Quote:
That is why Montreal Road, Bank Street and Wellington/Richmond Road don't follow straight lines.
The fact that those streets are not rectilinear is immaterial; their topology is sound. In fact, there are some suburban areas with perfectly rectilinear street layouts now, but crap topology. Even old European cities, like London, despite the lack of linearity, have excellent street topology. That is what matters, not just for transit operations but for land-use management, street-level experience, and the ability of a city to change over time in response to natural economic and social pressures.

Suburban areas with wasteful and inefficient street topologies are going to bake that wastefulness and inefficiency into the economy and public administration for centuries to come. It is baffling that Ottawa and other cities keep building, and allowing building, in this way.
     
     
  #2362  
Old Posted Aug 23, 2015, 10:58 AM
Aylmer's Avatar
Aylmer Aylmer is offline
 
Join Date: Nov 2007
Posts: 5,407
Quote:
Originally Posted by Uhuniau View Post
A 10-15 minute walk, plus a 10-15 minute headway, equals a 20-30 minute effective wait for a bus if you don't get your timing just right.

I'm not sure that's much of an improvement.
Actually, it would be 15-22 minutes. (Walk time + [headway/2])
     
     
  #2363  
Old Posted Aug 24, 2015, 1:27 AM
acottawa acottawa is offline
 
Join Date: Aug 2009
Posts: 18,941
Quote:
Originally Posted by Uhuniau View Post
A 10-15 minute walk, plus a 10-15 minute headway, equals a 20-30 minute effective wait for a bus if you don't get your timing just right.

I'm not sure that's much of an improvement.
I think the time savings comes from lower travel time on the bus itself (the bus goes straight down an arterial road and doesn't waste time taking tours of neighbourhoods).
     
     
  #2364  
Old Posted Aug 24, 2015, 2:19 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
 
Join Date: Jun 2013
Posts: 12,377
Quote:
Originally Posted by acottawa View Post
I think the time savings comes from lower travel time on the bus itself (the bus goes straight down an arterial road and doesn't waste time taking tours of neighbourhoods).
Yep. Even if the increased walking distance cancels out the increased frequency, travel time is still lower.
     
     
  #2365  
Old Posted Aug 24, 2015, 3:49 PM
Radster Radster is offline
 
Join Date: Oct 2007
Posts: 997
Anyone know why they are lining the entire Confederation line tunnel with concrete? Is it not bedrock down there? I am a bit disappointed in that (though I bet its good $ for the local concrete firms!), I was hoping for something similar to the Stockholm metro where the bedrock is visible throughout (covered by shotcrete I assume), and concrete is used very sparingly. This results in some cool artwork and lighting effects too!

http://www.dailymail.co.uk/news/article-...s-beautiful-subway-makeover-artists.html
     
     
  #2366  
Old Posted Aug 24, 2015, 4:37 PM
HighwayStar's Avatar
HighwayStar HighwayStar is offline
 
Join Date: Jul 2014
Posts: 1,200


Wow... impressive.

I'm actually doubly impressed that a city the size of Stockholm (metro pop 2.2m) has 100 Subway stations... 47 of which are underground !!
     
     
  #2367  
Old Posted Aug 24, 2015, 4:41 PM
rocketphish's Avatar
rocketphish rocketphish is offline
 
Join Date: Feb 2009
Posts: 14,725
Quote:
Originally Posted by Radster View Post
Anyone know why they are lining the entire Confederation line tunnel with concrete? Is it not bedrock down there? I am a bit disappointed in that (though I bet its good $ for the local concrete firms!), I was hoping for something similar to the Stockholm metro where the bedrock is visible throughout (covered by shotcrete I assume), and concrete is used very sparingly. This results in some cool artwork and lighting effects too!

http://www.dailymail.co.uk/news/article-...s-beautiful-subway-makeover-artists.html
With Ottawa being located in a significant seismic zone, I'm very happy that the tunnel will be properly reinforced and fully lined in concrete.
     
     
  #2368  
Old Posted Aug 28, 2015, 12:41 AM
rocketphish's Avatar
rocketphish rocketphish is offline
 
Join Date: Feb 2009
Posts: 14,725
Shopowners get one week's notice of three-year Rideau Street shutdown

Vito Pilieci, Ottawa Citizen
Published on: August 27, 2015 | Last Updated: August 27, 2015 8:00 PM EDT


Rideau Street businesses facing disruption with the construction of the $2-billion Confederation Line LRT only learned a week ago that a section of Rideau Street will be closed for three years.

“This is going to affect everyone,” said Corey Hackett, co-owner of Top of the World skateboard shop, which has been on Rideau Street for 23 years. “Every business owner I’ve spoken to in the past few days has been concerned.”

Starting Friday, the busy section of downtown Rideau between Mackenzie Avenue and Dalhousie Streets was to be closed to cars and most buses.

The city says pedestrians will be permitted in most parts of the area, but construction fencing and heavy equipment has shopkeepers worried that will likely mean lost foot traffic. And they question how such a huge project, in the works since 2012, could suddenly require the closure of one of the city’s busiest thoroughfares.

The Confederation Line is not scheduled to open until 2018.

“I don’t think that the city understood the scope of what the construction companies required,” said Hackett.

The city said it plans to work with businesses in the area on a campaign to let Ottawa residents know that the strip will remain open for business, but it’s particularly concerned about how the construction will affect bus traffic.

“Our biggest challenge is not car traffic, it’s making sure there is timely bus operations,” said Rideau-Vanier Coun. Mathieu Fleury, adding that recent lane reductions in the area have caused big issues for public-transit schedules. “It’s one of the key stations along the corridor. What’s important is making sure there is on-time transit.

“We’ve had ongoing discussions. It’s different between discussion and the time when implementation comes. The issue here has been making sure everyone is aware what’s happening starting the 28th.”

News of the street disruption — shopkeepers say they were only notified of the three-year closure at a meeting with city staff officials a little over a week ago — sparked the Downtown Rideau Business Improvement Area (BIA) to request a meeting with the city to try to find a way to ensure that foot traffic isn’t significantly impacted.

The area has been through several rounds of construction in recent years. The building of the Shaw Centre, which started with the demolition of the old Ottawa Congress Centre in 2008, snarled traffic in the area heading toward the ByWard Market.

Lane reductions east of Dalhousie due to more recent construction and the installation of large water mains near King Edward Avenue have also taken a toll.

An $8-million project in 2003 to renew a large portion of Bank Street in Old Ottawa South saw foot traffic to area businesses fall by more than 20 per cent as consumers simply chose to avoid the area. That project lasted less than a year, but several shops ended up closing.

The BIA has asked the city to consider finding ways to open portions of the road during off-peak periods, provide more advance notice about construction and the impact it will have, establish passenger drop-off areas within the construction zone, and to set aside funds for a marketing campaign alerting Ottawa residents to the fact that businesses in the area remain open.

“We’re very concerned, which is why we arranged to meet with city officials as quickly as we could,” said Peggy DuCharme, the BIA’s executive director. “This is what’s going to be, and there doesn’t appear that we will have much effect in changing this. It’s a matter of what can we do that can ensure we minimize impact on our business members and economic viability, as well as our customers.”

According to the BIA as many as 55 per cent of customers arrive at their shops by car. Another large proportion arrives by bus.

“I don’t want people to believe that it’s hell to get down here and it’s an area to be avoided. It’s an optics issue. It’s the continuation of the ongoing construction that’s been going on for years down here,” said Hackett, adding that its not in the city’s interest to see Rideau Street business owners close.

“This isn’t a couple months of short term pain. I don’t think the city’s vision of the first passengers coming out of the LRT at the Rideau Station is that they come out of the underground and are greeted by half of the storefronts being boarded up.”

http://ottawacitizen.com/news/local-news...rned-by-shutdown-due-to-lrt-construction
     
     
  #2369  
Old Posted Aug 28, 2015, 1:29 AM
JCL JCL is offline
 
Join Date: Mar 2010
Posts: 332
Blair Station and the demolition work that is happening. Filmed today.

• Video Link
     
     
  #2370  
Old Posted Aug 28, 2015, 3:06 AM
Uhuniau Uhuniau is offline
 
Join Date: Jan 2010
Posts: 9,104
Quote:
Originally Posted by rocketphish View Post
With Ottawa being located in a significant seismic zone, I'm very happy that the tunnel will be properly reinforced and fully lined in concrete.
Ottawa is not in a terribly significant seismic zone.
     
     
  #2371  
Old Posted Aug 28, 2015, 3:11 AM
Uhuniau Uhuniau is offline
 
Join Date: Jan 2010
Posts: 9,104
Quote:
Originally Posted by JCL View Post
Blair Station and the demolition work that is happening. Filmed today.

• Video Link
Can't wait to see more of those ugly red greenhouses get smashed to atoms.

Too bad there is no sign that the new stations will be any better at providing shade than the 1980s red things. Maybe if the people who built the Ottawa transit system had to use the Ottawa transit system during the summer, such considerations would be given higher and proper design weighting.
     
     
  #2372  
Old Posted Aug 28, 2015, 3:44 AM
Lambda11 Lambda11 is offline
 
Join Date: Jul 2015
Posts: 6
Quote:
Originally Posted by Uhuniau View Post
Ottawa is not in a terribly significant seismic zone.
Depends what you consider to be 'significant' but structural design in Ottawa tends to be governed by seismic considerations, much more so than in Toronto for example.
     
     
  #2373  
Old Posted Aug 28, 2015, 2:34 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
 
Join Date: Jun 2013
Posts: 12,377
Quote:
Originally Posted by Uhuniau View Post
Ottawa is not in a terribly significant seismic zone.
Actually, Ottawa is a pretty seismic place.

Earthquakes of mag 5-6 are regular, and there is evidence to suggest that earthquakes of up to make 7-8 can happen here as well, both geological evidence (certain landslide scars found in the valley strongly suggest powerful earthquakes created them in the current geological era) and cultural (Algonquin legends about earthquake tragedies).

We're easily the most earthquake-prone city in Canada east of the Rockies.

Remember that earthquake back in 2010? It caused a bridge in Bowman just north of Gatineau to partially collapse, and created cracks in the walls at Parliament Hill.

It's very good that the Confederation Line is properly reinforced against seismic events.
     
     
  #2374  
Old Posted Aug 29, 2015, 5:06 AM
Admiral Nelson Admiral Nelson is offline
 
Join Date: Jun 2009
Posts: 519
No one's posted this week's construction email update?
     
     
  #2375  
Old Posted Aug 29, 2015, 6:34 AM
mykl mykl is offline
 
Join Date: Jan 2015
Posts: 475
In fact, although most of them go unnoticed, Ottawa experiences over 400 seismic events each year! The Ottawa Valley is a rift valley.

If a big earthquake ever hits, Carleton University is gone. Who builds a university on a swamp in an earthquake zone? lol
     
     
  #2376  
Old Posted Aug 30, 2015, 12:35 AM
rocketphish's Avatar
rocketphish rocketphish is offline
 
Join Date: Feb 2009
Posts: 14,725
Quote:
Originally Posted by Admiral Nelson View Post
No one's posted this week's construction email update?
Sorry, I didn't realize how vital a service it is that I provide





Construction Update
Week of August 24





Scott Street Widening


Crews continue excavating and installing catch basins, part of Scott Street widening work from Carruthers to Holland avenues.




Lyon Station

Jawbreaker mines the central pillar and drifts. Crews continue drilling and tunnel reinforcements. Arch concrete pours are ongoing in sections of the running tunnel.




Lyon Station East and West Entrance

East Entrance: removals continue at the concourse level in Place de Ville. Rebar and formwork installations occur.

West Entrance: removals of asphalt and installation of manholes continues. Preparations for shoring and drilling at the entrance are ongoing.




Parliament Station Cavern

Tunnel reinforcements occur this week, including drilling and grouting of the umbrella. Mining in drifts continues this week in the Parliament Station cavern.




Rideau Station

Crocodile Rouge mines the elevator niches and HVAC adit. Drilling and grouting of the umbrella continues in the station cavern. Waterproofing and mud slab pours are ongoing in the running tunnel.




Rideau Station East and West Entrance

East Entrance: excavation and preparations for shoring installation occur at the entrance.

West Entrance: crews finalize traffic set-up and relocate utilities and hydrants, part of preliminary work for the station entrance.

Rideau Street Closure Notice




uOttawa Station

Crew begin traffic set-up for the relocation of the utility corridor bank under and adjacent to the Transitway at Nicholas Street, in anticipation of uOttawa station construction in 2016.




Hurdman Station

Crews continue removing the existing island and placing granular for the new bus platform. Conduit and lighting installations occur. The bus loop will be used during station construction later this fall. Pathway realignment will be in place until station construction works are complete.




Tremblay, St-Laurent, Cyrville and Blair Stations

Crews continue demolition of the existing structures onsite at Cyrville and Blair stations. St-Laurent Station works continue with set-up and removals. Mobilization occurs for the next week at Tremblay Station. Pathway realignment around the stations continue and will be in place until construction is complete.




Guideway construction – Booth Street Bridge

Construction continues at the bridge’s south abutment and includes installation of rebar. Crews finalize works on the pier caps.




Guideway construction – Hurdman Station

Work continues on the pier caps and crews prepare the elevated guideway columns for girders. Construction of the embankment is ongoing east of the station. Pathway realignment will be in place until construction is complete.




Guideway construction – Tremblay Station

Crews continue reinforcing the protection system east of VIA Rail Station. Pathway realignment will be in place until construction is complete.




Guideway construction – St-Laurent, Cyrville and Blair Stations

Crews install duct banks and sewers along this section of guideway. Preparations continue to install caissons for the overhead catenary poles.




Belfast Yard Administration and Maintenance Building and Yard

Crews complete flooring, doors and stairs this week. Saw cutting and installation of rails occurs in the maintenance and sanding areas. Aluminium panels are installed on the exterior of the building’s main entrance.




Belfast Yard Vehicle Storage Shed, Yard and Connector Works

Ballast tamping is ongoing in the shed and yard. Crews begin constructing the access to the main entrance and finalize curbs, paving and sidewalks in the yard. Installation of the infrastructure for the retaining pond occurs. Slab work for tracks, backfilling, landscaping and vent construction are ongoing at the connector.



Upcoming Construction Activities

In the coming weeks, the following construction activities are scheduled to occur:
  • Lyon Station east entrance excavation and west shaft construction.
  • Girder installations for the Hurdman Station elevated guideway.
  • Installation of the roof at the Belfast Yard connector.

http://www.ligneconfederationline.ca/construction/construction-update-37/
     
     
  #2377  
Old Posted Aug 30, 2015, 11:23 PM
eemy's Avatar
eemy eemy is offline
 
Join Date: Aug 2006
Posts: 4,425
I wonder if the St. Laurent platforms will be really wide since the LRT won't require the four lanes that go through there presently.
     
     
  #2378  
Old Posted Aug 30, 2015, 11:29 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
 
Join Date: Mar 2012
Posts: 29,174
Quote:
Originally Posted by jeremy_haak View Post
I wonder if the St. Laurent platforms will be really wide since the LRT won't require the four lanes that go through there presently.
If I recall, there was also an issue with a main sewer line passing through the middle of the St-Laurent station lower level, so they might opt to keep the platforms in the same location to avoid any work down the middle.
     
     
  #2379  
Old Posted Aug 31, 2015, 2:20 PM
Radster Radster is offline
 
Join Date: Oct 2007
Posts: 997
They should put some small shops down there on both platforms to make it a bit less boring and depressing, selling tickets, snacks, magazines, flowers etc.
     
     
  #2380  
Old Posted Aug 31, 2015, 2:34 PM
hwy418 hwy418 is offline
 
Join Date: Jun 2013
Posts: 410
Stage 2 OLRT Preliminary Eng. & Project Mgt Svcs Contract

REPORT RECOMMENDATION:

That the Finance and Economic Development Committee receive the non-competitive procurement strategy for Stage 2 Ottawa Light Rail Transit preliminary engineering and project management services, as outlined in this report.

See the report here:
http://app05.ottawa.ca/sirepub/agdocs.aspx?doctype=agenda&itemid=334495
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 11:22 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.