Quote:
Originally Posted by Mattyyy
From the rendering above it looks like a small one way street with no open space in the middle with a road that barely connects to Assumption. Am I seeing this wrong? If this is the plan - well, it sucks.
|
It's phase one of the plan. Phase two would be creating the other lane and the plaza in between. Hopefully there won't be too much delay between this phase and the second phase.
Phase three is the extension of the public space to the riverfront, with the viewing platform over the river.
This is the one thing that makes me chuckle - just about every public project in this province proceeds in multiple phases over several construction seasons, usually with some delay while additional funding is secured. I know the province is broke, but this sort of strategy only ends up costing more in the end.
Classic examples include the Mapleton overpass at Wheeler. That took about five years while they did different components each year, usually with some demolition of the previous year's work before they could proceed with the new phase. The Dieppe/Harrisville interchange with Veterans Highway is following a similar trajectory. Everyone knows what needs to be done, but the province dithers with the widening of Dieppe Blvd done last year, the reconfiguring of the southbound off ramp from route 15 done this year and yet no commitment to actually widen the God damned overpass itself. It's bloody frustrating!