  #1621  
Old Posted Aug 12, 2015, 11:28 AM
mctnguy mctnguy is offline
Registered User
 
Join Date: May 2010
Posts: 127
Pure speculation, but maybe they were waiting for the Events Center to get the go ahead? Since today is the day that Council will apparently decide to commit to the project, maybe the 55 developers got an early assurance that the project was a go?

Quote:
Originally Posted by Mattyyy View Post
Any rumors on Five Five Queen circulating?
Reply With Quote
     
     
  #1622  
Old Posted Aug 12, 2015, 12:14 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,134
Quote:
Originally Posted by Mattyyy View Post
Any rumors on Five Five Queen circulating? I noticed on the weekend that the large sign in the parking lot was removed but there was still on a sign on the side of the building with the model suite. Unless I'm dreaming I'm pretty sure there was a large sign in the parking lot that you could spot from both directions. Could this mean they are possible starting to prepare for construction, are giving up, or perhaps mean nothing at all? With an anticipated move in date of early 2017 the time to begin would be now. I'm assuming it would take at least 12 months to construct.
FWIW, their website is still operational - http://fivefive.ca/

They had quite a heavy advertising presence on social media (including SSP) for several months but that has recently stopped. If I was to guess, they probably needed to sell a certain number of condos to proceed with the project. Perhaps they met their objective and things are a go. Maybe that's why the advertising stopped.

We should soon know if that's the case or not......
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1623  
Old Posted Aug 12, 2015, 2:06 PM
Monctoncore Monctoncore is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,273
According to their website, there are not many suites availble... It says on each separate condo, 1 left, 2 left etc. I have been in contact with the owners on and off, so I sent them an email asking if they had plans to break ground soon, so we shall see.
Reply With Quote
     
     
  #1624  
Old Posted Aug 12, 2015, 4:13 PM
theshark's Avatar
theshark theshark is offline
Registered User
 
Join Date: Jun 2007
Location: Northern N.-B.
Posts: 1,145
Is there anyone who is good enough with photoshop or god knows what program to use, to take a picture of downtown Moncton and place 5-5 in there, just to see the impact it would have on the skyline?
Reply With Quote
     
     
  #1625  
Old Posted Aug 12, 2015, 7:00 PM
Monctoncore Monctoncore is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,273
They emailed me back and informed me they are planning to break ground this fall!
Reply With Quote
     
     
  #1626  
Old Posted Aug 12, 2015, 7:05 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,134
Quote:
Originally Posted by Monctoncore View Post
They emailed me back and informed me they are planning to break ground this fall!
Well, between FiveFive, the events centre and the preliminary work on Downing Street, next year could be quite an exciting one for downtown Moncton!

__________________
Go 'Cats Go
Reply With Quote
     
     
  #1627  
Old Posted Aug 12, 2015, 8:10 PM
Franco401 Franco401 is offline
Registered User
 
Join Date: Jan 2014
Location: Fredericton
Posts: 1,241
Quote:
Originally Posted by theshark View Post
Is there anyone who is good enough with photoshop or god knows what program to use, to take a picture of downtown Moncton and place 5-5 in there, just to see the impact it would have on the skyline?
I'm afraid you're out of luck. The website doesn't have any decent renders, so I have nothing to go on. If anybody else can do it, I'd like to see it just as much.
Reply With Quote
     
     
  #1628  
Old Posted Aug 12, 2015, 9:35 PM
David_99's Avatar
David_99 David_99 is online now
Registered User
 
Join Date: Nov 2008
Posts: 852
Quote:
Originally Posted by Franco401 View Post
I'm afraid you're out of luck. The website doesn't have any decent renders, so I have nothing to go on. If anybody else can do it, I'd like to see it just as much.
I attempted twice but the angle just isn't right. From the rendering angle, there wouldn't be much difference in the skyline from the Riverview side as the Marriott would block 6 of the 8 floors.
Reply With Quote
     
     
  #1629  
Old Posted Aug 17, 2015, 9:57 PM
BlackYear's Avatar
BlackYear BlackYear is offline
Registered User
 
Join Date: Jan 2009
Posts: 1,277
It's official, Zio's ready for Spring 2016. Large sign posted at the corner of Mt-Rd & Church.



Reply With Quote
     
     
  #1630  
Old Posted Aug 17, 2015, 10:07 PM
Monctoncore Monctoncore is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,273
That actually looks fantastic, street front presence, parking in the rear, which will please those who like the parking. It will really bring a change to that area, a well needed change, now if they can find someone willing to redevelop Moncton High, and a few other places along that stretch, we could be looking at another beautiful area downtown for people to visit.
Reply With Quote
     
     
  #1631  
Old Posted Aug 17, 2015, 10:09 PM
NBNYer's Avatar
NBNYer NBNYer is offline
Registered User
 
Join Date: Mar 2010
Location: Moncton
Posts: 1,269
Quote:
Originally Posted by Budyser View Post
It's official, Zio's ready for Spring 2016. Large sign posted at the corner of Mt-Rd & Church.
Excellent development for that corner! The neighbourhoods surrounding downtown need more of these pedestrian friendly developments. They help in extending the downtown further North of the Main and St-George area.

Next year is turning out to be pretty busy construction wise downtown!
Reply With Quote
     
     
  #1632  
Old Posted Aug 17, 2015, 11:13 PM
Monctoncore Monctoncore is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,273
Interesting enough, this finally comes up just days after the arena announcement, coincidence? Or am I just over thinking things like always. Also they must be planning to start construction soon if they are planning an opening for 2016.
Reply With Quote
     
     
  #1633  
Old Posted Aug 17, 2015, 11:16 PM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,134
Quote:
Originally Posted by Monctoncore View Post
Interesting enough, this finally comes up just days after the arena announcement, coincidence? Or am I just over thinking things like always.
I'm pretty sure that in this particular case that the timing is just a coincidence.

I like Zio's design BTW. It looks like a Greek or Italian village. The street presence, the outdoor seating on the corner and the hidden parking in behind are just what the city needs. The design is exotic for Moncton, but most new developments that have been proposed recently (like Fivefive and the events centre) have been somewhat exotic. Maybe this should be Moncton's signature - urban eclecticism (you never know what you'll see whenever you turn a street corner).
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1634  
Old Posted Aug 18, 2015, 12:10 AM
David_99's Avatar
David_99 David_99 is online now
Registered User
 
Join Date: Nov 2008
Posts: 852
Moncton Awards Contract for First Phase of Downing Plaza Project

Work will begin on a project connecting Moncton's Downtown to it's riverfront in the next two weeks.

At Monday night's regular public meeting, Moncton City Council awarded Dexter Construction the contract to begin work on Downing Plaza Reconstruction Project. The construction company will be responsible for the first phase of this project, which involves the creation of a one-way street from Main Street to Assomption Boulevard.

The recycled asphalt will be removed next spring. Concrete slab, granite curb and paver stones, decorative lights, benches and trees will be installed. This project is worth $3.3 million over two years.



Times&Transcript

Last edited by David_99; Aug 18, 2015 at 12:27 AM.
Reply With Quote
     
     
  #1635  
Old Posted Aug 18, 2015, 12:16 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,134


That's a pretty modest phase one.........
__________________
Go 'Cats Go
Reply With Quote
     
     
  #1636  
Old Posted Aug 18, 2015, 12:21 AM
David_99's Avatar
David_99 David_99 is online now
Registered User
 
Join Date: Nov 2008
Posts: 852
Quote:
Originally Posted by MonctonRad View Post
That's a pretty modest phase one.........
At least it's starting! Something that many, many projects have failed to even do.
Reply With Quote
     
     
  #1637  
Old Posted Aug 18, 2015, 1:33 AM
mylesmalley's Avatar
mylesmalley mylesmalley is offline
Moderator / Supervillain
 
Join Date: Aug 2007
Location: Moncton, NB
Posts: 4,102
I heard a presentation on the project a while back and it was mentioned that a huge amount of grading needed to be done. That, and underground infrastructure.
__________________
"When you go home tonight, there's gonna be another story on your house! "
Reply With Quote
     
     
  #1638  
Old Posted Aug 18, 2015, 1:42 AM
Monctoncore Monctoncore is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,273
It's actually a very good start because they are doing one whole half of the street. Phase one will give them a good start on the street, they will have the whole blue cross side finished by next fall. It is disappointing that they aren't going to do it all at once, but we have to take what we can get, at least this is a start, I just hope that they haven't given up on this project and Plan on just going with a small one way street.

Last edited by Monctoncore; Aug 18, 2015 at 1:55 AM.
Reply With Quote
     
     
  #1639  
Old Posted Aug 18, 2015, 11:30 AM
Mattyyy Mattyyy is offline
Registered User
 
Join Date: Nov 2011
Posts: 361
From the rendering above it looks like a small one way street with no open space in the middle with a road that barely connects to Assumption. Am I seeing this wrong? If this is the plan - well, it sucks.
Reply With Quote
     
     
  #1640  
Old Posted Aug 18, 2015, 11:32 AM
MonctonRad's Avatar
MonctonRad MonctonRad is online now
Wildcats Rule!!
 
Join Date: Jun 2008
Location: Moncton NB
Posts: 41,134
Quote:
Originally Posted by Mattyyy View Post
From the rendering above it looks like a small one way street with no open space in the middle with a road that barely connects to Assumption. Am I seeing this wrong? If this is the plan - well, it sucks.
It's phase one of the plan. Phase two would be creating the other lane and the plaza in between. Hopefully there won't be too much delay between this phase and the second phase.

Phase three is the extension of the public space to the riverfront, with the viewing platform over the river.

This is the one thing that makes me chuckle - just about every public project in this province proceeds in multiple phases over several construction seasons, usually with some delay while additional funding is secured. I know the province is broke, but this sort of strategy only ends up costing more in the end.

Classic examples include the Mapleton overpass at Wheeler. That took about five years while they did different components each year, usually with some demolition of the previous year's work before they could proceed with the new phase. The Dieppe/Harrisville interchange with Veterans Highway is following a similar trajectory. Everyone knows what needs to be done, but the province dithers with the widening of Dieppe Blvd done last year, the reconfiguring of the southbound off ramp from route 15 done this year and yet no commitment to actually widen the God damned overpass itself. It's bloody frustrating!
__________________
Go 'Cats Go
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Atlantic Provinces
Forum Jump



Forum Jump


All times are GMT. The time now is 7:23 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.