HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture


    Comcast Innovation & Technology Center in the SkyscraperPage Database

• Building Data Page   • Comparison Diagram   • Philadelphia Skyscraper Diagram

• Map Location
• Philadelphia Projects & Construction Forum

Reply

 
Thread Tools Display Modes
     
     
  #2501  
Old Posted Aug 3, 2015, 2:26 AM
TechTalkGuy's Avatar
TechTalkGuy TechTalkGuy is offline
Mr. Technology
 
Join Date: Jul 2006
Posts: 3,008
Quote:
Originally Posted by Plokoon11 View Post
Had a dream the design changed, and now went up to 1200 roof height, with a 100 ft spire. Everyone was celebrating on here, and the I woke up.
That's nothing compared to my dream where they moved the entire core to NYC, then I woke up!
Reply With Quote
     
     
  #2502  
Old Posted Aug 3, 2015, 11:12 AM
SkyNerd SkyNerd is offline
Registered User
 
Join Date: Jul 2015
Posts: 6
A shot of the split work platforms inside the core. Question for those who are more familiar with the process - It looks like the all scaffolding inside the core; at what point do they install the internal structure and decking?

Reply With Quote
     
     
  #2503  
Old Posted Aug 3, 2015, 1:52 PM
AJM AJM is offline
Registered User
 
Join Date: Sep 2006
Posts: 96


Crane 3 being built, note how cam shaped end pieces can retract out of way to climb up ladder and lower tower sections (TG1900) can push up crane through upper sections (TG2300).
Reply With Quote
     
     
  #2504  
Old Posted Aug 3, 2015, 9:06 PM
gw04 gw04 is offline
Registered User
 
Join Date: Jun 2015
Posts: 172
Quote:
Originally Posted by AJM View Post


Crane 3 being built, note how cam shaped end pieces can retract out of way to climb up ladder and lower tower sections (TG1900) can push up crane through upper sections (TG2300).
So the bottom section keeps moving up to a new floor/height similar to the red crane on the east side of the core, is that correct?
Reply With Quote
     
     
  #2505  
Old Posted Aug 4, 2015, 5:11 PM
Londonee Londonee is offline
Registered User
 
Join Date: Aug 2005
Location: Fitler Square (via London)
Posts: 2,114
Steel taking shape - eastern side decking coming along nicely.

Reply With Quote
     
     
  #2506  
Old Posted Aug 4, 2015, 7:45 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
Yeah it looks like they got quite a lot of floor decking done in the newer installed I beams.
Reply With Quote
     
     
  #2507  
Old Posted Aug 5, 2015, 3:00 PM
ekt8750 ekt8750 is offline
Registered User
 
Join Date: Jun 2015
Posts: 201
I drove by the site yesterday and was just floored at how massive the steel beams are. It's simply amazing.
Reply With Quote
     
     
  #2508  
Old Posted Aug 5, 2015, 7:02 PM
Jawnadelphia's Avatar
Jawnadelphia Jawnadelphia is offline
Registered User
 
Join Date: May 2014
Location: Wilmington, Delaware
Posts: 2,907
[IMG]Untitled by screennameLLC, on Flickr[/IMG]
Reply With Quote
     
     
  #2509  
Old Posted Aug 5, 2015, 7:24 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
Decking for north side is going in fast!
Reply With Quote
     
     
  #2510  
Old Posted Aug 5, 2015, 7:27 PM
ekt8750 ekt8750 is offline
Registered User
 
Join Date: Jun 2015
Posts: 201
Quote:
Originally Posted by Plokoon11 View Post
Decking for north side is going in fast!
Just as I suspected, as soon as the 3rd crane was put in, they'd hit the accelerator.
Reply With Quote
     
     
  #2511  
Old Posted Aug 6, 2015, 5:07 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,474
Update from Building Philly



https://www.facebook.com/BuildingPhilly
Reply With Quote
     
     
  #2512  
Old Posted Aug 6, 2015, 5:41 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,474
8/5/2015







Reply With Quote
     
     
  #2513  
Old Posted Aug 6, 2015, 6:23 AM
Human Scale's Avatar
Human Scale Human Scale is offline
More of that.
 
Join Date: Jul 2015
Location: Philadelphia
Posts: 430
Quote:
Originally Posted by gw04 View Post
See this architectural document, section 5, first two pages: CITC Civic Design Review

Fascinating Read!!

I fine-tooth-combed it.

Even though it's old, I still found interesting tidbits that were news to me:

Only 70 parking spaces? Who will get those? Hotel Valet? NBC Studios? Pay to park? On the schematic it looks like it might as well be ten parking spaces.

The bench count says there is ONE bench on 19th street (hotel side) but there is no corresponding graphic showing a bench in the schematic. I later saw on a cross-cut view; a lady sitting on a bench under the porte cochere, facing the hotel entrance. I believe this means the ONE bench on the 19th Street hotel side is actually not a regular bench but an architectural flourish in the form of one large bench that stretches the length of the porte cochere and possibly acts as a planter. The Five Diamond thugs at Four Seasons are sure to keep a vigilant eye for homeless use.

The core, as it pierces through the hotel, actually becomes a shell for hotel rooms. Remember the hotel elevators are separate, situated to the far West near the decorative fin.

The hotel will only have three exterior-view express elevators to the top (North side). The South side exterior-view elevators are SERVICE ELEVATORS! ..AND one floor plan shows 4 of these elevators, while the later version in the same document shows 3 (matching the other side).

Other discrepancies between floor plans show:
-possible stairs immediately to the left and right when entering the "public room," for quick access to the concourse below.
-possible door to hotel's street lobby opening directly onto Arch Street. Otherwise there is just the main entrance on 19th OR a back way through the street level restaurant when coming from the East (18th Street/Office entrance).

Last edited by Human Scale; Aug 6, 2015 at 7:55 AM.
Reply With Quote
     
     
  #2514  
Old Posted Aug 6, 2015, 2:13 PM
Londonee Londonee is offline
Registered User
 
Join Date: Aug 2005
Location: Fitler Square (via London)
Posts: 2,114
Quote:
Originally Posted by Human Scale View Post
Only 70 parking spaces? Who will get those? Hotel Valet? NBC Studios? Pay to park? On the schematic it looks like it might as well be ten parking spaces.
It's a good question - the current building has about the same number of spaces, maybe a few less - used exclusively for top executive parking. My guess is that it'll be the same for this building with maybe a handful going to the hotel valet for high-end guests. The 4 Seasons can easily contract with parking garage across the street for additional valet spaces.

Quote:
Originally Posted by Human Scale View Post
The South side exterior-view elevators are SERVICE ELEVATORS!
Interesting, seems like a waste of a good view - bury those service elevators in the building's interior.
Reply With Quote
     
     
  #2515  
Old Posted Aug 6, 2015, 2:41 PM
Plokoon11 Plokoon11 is offline
Registered User
 
Join Date: Jun 2007
Posts: 1,698
Core pour today.
Reply With Quote
     
     
  #2516  
Old Posted Aug 6, 2015, 3:08 PM
JLKim JLKim is offline
Registered User
 
Join Date: Apr 2015
Posts: 9
CITC from the Spring Garden Bridge

Reply With Quote
     
     
  #2517  
Old Posted Aug 6, 2015, 3:53 PM
MikeNigh MikeNigh is offline
Registered User
 
Join Date: Aug 2013
Location: Philadelphia, PA
Posts: 597
cool shot. still tiny compared to what it'll end up.
Reply With Quote
     
     
  #2518  
Old Posted Aug 7, 2015, 12:37 AM
bulgar bulgar is offline
Registered User
 
Join Date: Aug 2015
Posts: 59
Citc



Concrete core & steel erection from earlier this evening.
Reply With Quote
     
     
  #2519  
Old Posted Aug 7, 2015, 12:51 AM
bulgar bulgar is offline
Registered User
 
Join Date: Aug 2015
Posts: 59
Quote:
Originally Posted by SkyNerd View Post
A shot of the split work platforms inside the core. Question for those who are more familiar with the process - It looks like the all scaffolding inside the core; at what point do they install the internal structure and decking?
If by internal structure you mean the structural steel framing - the cast-in-place core goes up substantially faster than the steel initially. I believe they cast embedded anchors into the core to tie off the steel. The core should house most, if not all, elevator hoist-ways and stairwells since it is inherently a fire-rated enclosure. The scaffolding inside the core is most likely form-work to pour the bearing walls that separate these elements. Hope this helps.
Reply With Quote
     
     
  #2520  
Old Posted Aug 7, 2015, 3:53 AM
Philly-Drew's Avatar
Philly-Drew Philly-Drew is offline
Φιλαδέλφεια
 
Join Date: Feb 2005
Location: NoLibs
Posts: 1,395
Quote:
Originally Posted by Human Scale View Post
Fascinating Read!!

The hotel will only have three exterior-view express elevators to the top (North side). The South side exterior-view elevators are SERVICE ELEVATORS! ..AND one floor plan shows 4 of these elevators, while the later version in the same document shows 3 (matching the other side).
Something doesn't make sense here.
__________________
"Imagine all the people, living life in peace." :Lennon
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture
Forum Jump



Forum Jump


All times are GMT. The time now is 4:07 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.