HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive


    W Philadelphia & Element Philadelphia Hotel in the SkyscraperPage Database

Building Data Page   • Comparison Diagram   • Philadelphia Skyscraper Diagram

Map Location
Philadelphia Projects & Construction Forum

 

 
Thread Tools Display Modes
     
     
  #881  
Old Posted May 28, 2015, 12:08 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,462
Update from Building Philly



More photos here:
https://www.facebook.com/BuildingPhilly
     
     
  #882  
Old Posted Jun 2, 2015, 12:36 PM
thisisforreal's Avatar
thisisforreal thisisforreal is offline
Registered User
 
Join Date: Jun 2014
Posts: 752
From 5 minutes ago:

     
     
  #883  
Old Posted Jun 4, 2015, 7:18 PM
Jawnadelphia's Avatar
Jawnadelphia Jawnadelphia is offline
Registered User
 
Join Date: May 2014
Location: Wilmington, Delaware
Posts: 2,906
From today:


[IMG]IMG_1539 by screennameLLC, on Flickr[/IMG]

[IMG]IMG_1538 by screennameLLC, on Flickr[/IMG]

[IMG]IMG_1556 by screennameLLC, on Flickr[/IMG]

[IMG]IMG_1554 by screennameLLC, on Flickr[/IMG]

[IMG]IMG_1557 by screennameLLC, on Flickr[/IMG]
     
     
  #884  
Old Posted Jun 4, 2015, 7:20 PM
MikeNigh MikeNigh is offline
Registered User
 
Join Date: Aug 2013
Location: Philadelphia, PA
Posts: 597
Looks like the scaffolding for the avenir is finally down.
     
     
  #885  
Old Posted Jun 4, 2015, 7:28 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
Quote:
Originally Posted by MikeNigh View Post
Looks like the scaffolding for the avenir is finally down.
Yes, its been down for weeks. I think the bank is about to open. The exterior looks much better after a cleaning.
     
     
  #886  
Old Posted Jun 4, 2015, 7:32 PM
MikeNigh MikeNigh is offline
Registered User
 
Join Date: Aug 2013
Location: Philadelphia, PA
Posts: 597
Quote:
Originally Posted by 1487 View Post
Yes, its been down for weeks. I think the bank is about to open. The exterior looks much better after a cleaning.
Ya but the last bit they had in front of the entrance is now gone.
     
     
  #887  
Old Posted Jun 4, 2015, 9:41 PM
Cro Burnham's Avatar
Cro Burnham Cro Burnham is offline
Registered User
 
Join Date: Jun 2005
Location: delco
Posts: 2,396
Quote:
Originally Posted by 1487 View Post
Yes, its been down for weeks. I think the bank is about to open. The exterior looks much better after a cleaning.
Has the facade been cleaned? The windows have not been washed. Still coated with dirt.
     
     
  #888  
Old Posted Jun 5, 2015, 3:18 AM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,462
Update from Building Philly



More photos here:
https://www.facebook.com/BuildingPhilly
     
     
  #889  
Old Posted Jun 5, 2015, 4:00 AM
Philly-Drew's Avatar
Philly-Drew Philly-Drew is offline
Φιλαδέλφεια
 
Join Date: Feb 2005
Location: NoLibs
Posts: 1,395
Awesome vantage point TallCoolOne! Great pics guys! Thank!!
__________________
"Imagine all the people, living life in peace." :Lennon
     
     
  #890  
Old Posted Jun 5, 2015, 12:11 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
Quote:
Originally Posted by Cro Burnham View Post
Has the facade been cleaned? The windows have not been washed. Still coated with dirt.
Yes, there was a masonry restoration contractor on the job in the early phases. The building almost looks white now.
     
     
  #891  
Old Posted Jun 5, 2015, 2:33 PM
Cro Burnham's Avatar
Cro Burnham Cro Burnham is offline
Registered User
 
Join Date: Jun 2005
Location: delco
Posts: 2,396
Quote:
Originally Posted by 1487 View Post
Yes, there was a masonry restoration contractor on the job in the early phases. The building almost looks white now.
I wouldn't say the building is almost white - just my personal POV, and I go by several times a week - but I guess it must be cleaner than before. I just forget how dirty it used to be . . . I never recall it having been that dark to begin with.

The windows are relatively new and in pretty good shape, so I understand why they are keeping rather than replacing them - though they are not the most beautiful windows. But they are still dirty.

I hope they get a window cleaner soon.
     
     
  #892  
Old Posted Jun 9, 2015, 1:52 PM
loves development loves development is offline
Registered User
 
Join Date: Oct 2014
Location: Philadelphia
Posts: 31
1441 CHESTNUT ST PHILADELPHIA, PA

Permit Number 606135

Application Type USE PERMIT

Permit Type USE-USE CHANGE FOR PARTOF BLDG

Status COMPLETED

Date Issued May 18, 2015

Last Updated May 18, 2015

Work Description To amend original permit #710942, AP#040715007 (subsequent admin permits AP#178843, AP#422528, AP#545847 & AP#589528) - existing 51 story building (582' high) with rooftop mechanicals/elevator shaft, subbasement for underground private and public parking ( 163 spaces) accessory to the 755 hotel rooms with accessory spaces for guests and retail commerical spaces; Propose change to increase the number of accessory parking spaces from 163 to 171 total spaces (138 standard, 27 compact, 6 handicap), (size and location as shown on the plan).

Contact Information

KLEHR HARRISON HARVEY BRANZBURG
1835 MARKET STREET
STE# 1400
PHILADELPHIA, PA 19102

Contact Type PROFESSIONAL
     
     
  #893  
Old Posted Jun 9, 2015, 6:17 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
Quote:
Originally Posted by loves development View Post
1441 CHESTNUT ST PHILADELPHIA, PA

Permit Number 606135

Application Type USE PERMIT

Permit Type USE-USE CHANGE FOR PARTOF BLDG

Status COMPLETED

Date Issued May 18, 2015

Last Updated May 18, 2015

Work Description To amend original permit #710942, AP#040715007 (subsequent admin permits AP#178843, AP#422528, AP#545847 & AP#589528) - existing 51 story building (582' high) with rooftop mechanicals/elevator shaft, subbasement for underground private and public parking ( 163 spaces) accessory to the 755 hotel rooms with accessory spaces for guests and retail commerical spaces; Propose change to increase the number of accessory parking spaces from 163 to 171 total spaces (138 standard, 27 compact, 6 handicap), (size and location as shown on the plan).

Contact Information

KLEHR HARRISON HARVEY BRANZBURG
1835 MARKET STREET
STE# 1400
PHILADELPHIA, PA 19102

Contact Type PROFESSIONAL

Well obviously this is going to have a substantial below grade garage. This project is adding a LOT of rooms to the market. I wonder if any hotel in CC outside of the CC marriott has more rooms than this. I believe the marriott has 1200 rooms and is the largest in the state.
     
     
  #894  
Old Posted Jun 9, 2015, 6:58 PM
boxbot's Avatar
boxbot boxbot is offline
Registered User
 
Join Date: Feb 2014
Location: Delco., Pa.
Posts: 842
Maybe someday I can park at this lot for City Hall instead of the one under Love Park, which is a dangerous, dark, filthy, urine-soaked cesspool.
     
     
  #895  
Old Posted Jun 9, 2015, 7:43 PM
zakuc258 zakuc258 is offline
Registered User
 
Join Date: Feb 2015
Location: Secane, PA
Posts: 14
Quote:
Originally Posted by 1487 View Post
Well obviously this is going to have a substantial below grade garage. This project is adding a LOT of rooms to the market. I wonder if any hotel in CC outside of the CC marriott has more rooms than this. I believe the marriott has 1200 rooms and is the largest in the state.
The Philadelphia Marriott Downtown has 1,408 guest rooms, and is the largest Marriott property in the state of PA. The second largest Marriott is the Courtyard Philadelphia Downtown with 499 guest rooms, and the Philadelphia Airport Marriott comes in 3rd with 419 guest rooms. I am an employee of Marriott so I know these numbers are accurate, as for other hotel chains I am not sure how many rooms there are.
     
     
  #896  
Old Posted Jun 9, 2015, 8:13 PM
MetroSplash's Avatar
MetroSplash MetroSplash is offline
Registered User
 
Join Date: Feb 2006
Posts: 101
Quote:
Originally Posted by Cro Burnham View Post
I wouldn't say the building is almost white - just my personal POV, and I go by several times a week - but I guess it must be cleaner than before. I just forget how dirty it used to be . . . I never recall it having been that dark to begin with.

I hope they get a window cleaner soon.
The first floor facade is nearly white because the original masonry was removed and an all new facade was created. I watched them putting it up.

Yesterday, they were cleaning all the windows, at least on Chestnut side.

Also, this morning they were putting up all new sconces on the first floor. I'm thankful because the temporary lights along Chestnut didn't look so great.

People have been moving in since 6/1. I can see them unpacking there boxes and setting up house in a handful of units.
     
     
  #897  
Old Posted Jun 9, 2015, 8:17 PM
MetroSplash's Avatar
MetroSplash MetroSplash is offline
Registered User
 
Join Date: Feb 2006
Posts: 101
On the W site, it looks like they are exploring and removing parts of the original foundations. one day they were digging up and removing a bunch of girders and another day they appeared to have located a basement wall and were breaking it up and removing it. it looks like slow, tedious work. I just want them to begin digging in earnest.
     
     
  #898  
Old Posted Jun 9, 2015, 11:05 PM
summersm343's Avatar
summersm343 summersm343 is offline
Moderator
 
Join Date: Oct 2011
Location: Philadelphia
Posts: 18,462
Even though the building will house 700 hotel rooms, it will be split between two different hotels: The W and the Element hotels. I don't think these will be counted as one but two separate.
     
     
  #899  
Old Posted Jun 10, 2015, 3:20 AM
FiggyOlive FiggyOlive is offline
Closed account
 
Join Date: Feb 2015
Posts: 26
Quote:
Originally Posted by summersm343 View Post
Even though the building will house 700 hotel rooms, it will be split between two different hotels: The W and the Element hotels. I don't think these will be counted as one but two separate.
Yes and two separate entrances. Probably a single General Manger though, for the whole property. Reminds me of the Four Seasons at the Mirage (?) in Las Vegas. Old building but if you gut a couple floors, change the quality of the finishes, and establish a separate entrance, you have what some call the best luxury hotel on the strip.
     
     
  #900  
Old Posted Jun 10, 2015, 12:16 PM
1487 1487 is offline
BANNED
 
Join Date: Jun 2014
Posts: 3,401
Quote:
Originally Posted by boxbot View Post
Maybe someday I can park at this lot for City Hall instead of the one under Love Park, which is a dangerous, dark, filthy, urine-soaked cesspool.
LOVE park garage is being renovated along with the park on top. It will get elevators, ventilation upgrades and other improvements. Its been sold to a chicago parking company.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 11:12 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.