Quote:
Originally Posted by milomilo
If you have a fully operationally separate spur then all the transferring passengers from the MRU spur (basically all of them) will have to cram onto already loaded trains at Westbrook, along with passengers already waiting at the station. This would be severely detrimental to service quality.
|
Except the very logic of building rail to MRU would suggest that there would be sufficient reverse traffic to not be overly detrimental to service. Some people going to MRU/Lincoln Park/Currie Barracks (MLC) will also be coming from the west making space for folks from MLC going downtown and beyond. A far greater influence on the service quality will be determined by the trade off between potential capacity on both lines and time savings from removing the transfer time penalty.
Quote:
Originally Posted by Socguy
If it does go to Mt. Royal, I wonder how long it would take the Tsu Tsina to push for the extra km to their new development.
|
If the Tsuu T'ina wish to pay for the extension to their development, it would be a welcome development for our city, though it seems geometrically challenging to draw an appropriate line that meaningfully services MRU then goes on to the 940 lands.