Quote:
Originally Posted by dsmmace
Nah, proper piles, footings, basement waterproofing/sealing, adequate drainage with weeping tile, 32mpa Concrete and a sump. Shouldn't be a problem if done correctly, with the ground height being brought up, the water table will likely have be lower than Harbour Landing. Disclaimer: I'm not an engineer.
|
There's that, and now that there is drainage through the area the "Lake" Shouldn't be as much of an issue. As long as they leave enough of low "drainage" area to accommodate large rains / runoff from snow they should be OK.
BUT proper construction and deep piles will make a big difference. No spread footings should be allowed.
Now back to topic... Stadium Stuff