Yup. NW corner. Fascinating how fast it's going up.
The first pic gives a good perspective how big/deep the hole is.
No kidding... and yes 10m (30ft) is no small hole to be digging. It is amazing to think 50% or so of that will be seating! An Amazing facility we are going to have!
And yes it is quite a site from 11th. I can just imagine the finished structure at night all lit up during a night game and snapping some great pics from street level or the pedway
Here's the view from 11th Ave pedway, about 10 days ago.
You know for all the talk of a great view of downtown... Almost none of the seats will see any of it... Quite sad really. But oh well, most of the looking will be at the field anyway
Last edited by North_Regina_Boy; Apr 20, 2015 at 4:46 PM.
It appears that those steel beams poking out the top of the forms will actually hold up the roof. Not the tallest part of the roof as that floats, but the part of the roof behind the seats.
It appears they have begun work on one of the two little buildings in the south end of the stadium at street level. Look to be doing the walls with cindercrete blocks. Anyone know what those two building's function will be?
They also appear to be digging the trench/ramp for the "driveway" for street level vehicles to be able to drive down to field level after the stadium is finished.