  #1521  
Old Posted Apr 3, 2015, 2:00 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
Quote:
Originally Posted by Axe View Post
You are joking right? They will have stairs.
When Centre house opens, East house will be closed and West House will still be under construction leaving Centre house with 3 elevators as the sole way to get up to platform (along with the stairs in centre house).
Reply With Quote
     
     
  #1522  
Old Posted Apr 3, 2015, 10:07 PM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Wow, much ado about nothing. I read somewhere that the existing passerelle will be removed summer next year. It's a safe bet that the 'spring' start on the existing stationhouse will have them block off the stairs (between Central and Beresford) into the ticket area so they can start the necessary ground work - they'll have to extend the stationhouse to fit those escalators in. The whole stationhouse will close in the summer when the passerelle is removed and the new stationhouse is open.
Reply With Quote
     
     
  #1523  
Old Posted Apr 6, 2015, 3:25 PM
CanSpice's Avatar
CanSpice CanSpice is online now
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,730
Quote:
Originally Posted by CanSpice View Post
I think that's just regular escalator maintenance. I got an email from TransLink the other day that implied that work hadn't started there yet.
Yeah, they haven't started construction at New Westminster yet. The escalator down to the bus loop is back in service.
Reply With Quote
     
     
  #1524  
Old Posted Apr 7, 2015, 1:51 PM
Axe Axe is offline
Registered User
 
Join Date: Oct 2009
Posts: 78
Quote:
Originally Posted by Mac Write View Post
When Centre house opens, East house will be closed and West House will still be under construction leaving Centre house with 3 elevators as the sole way to get up to platform (along with the stairs in centre house).
They will have stairs to get to the platform well the construction is going on.
Reply With Quote
     
     
  #1525  
Old Posted Apr 16, 2015, 12:42 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
Quote:
Originally Posted by CanSpice View Post
Yeah, they haven't started construction at New Westminster yet. The escalator down to the bus loop is back in service.
I was there today and they *still* haven't started construction - a month after they supposed to.
Reply With Quote
     
     
  #1526  
Old Posted Apr 16, 2015, 4:28 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
I don't understand why construction hasn't started at Commercial-Broadway. There is no way it's going to be ready for the opening of the Evergreen Line.
Reply With Quote
     
     
  #1527  
Old Posted Apr 16, 2015, 5:42 AM
Meraki Meraki is offline
Registered User
 
Join Date: Mar 2012
Posts: 473
Quote:
Originally Posted by red-paladin View Post
I don't understand why construction hasn't started at Commercial-Broadway. There is no way it's going to be ready for the opening of the Evergreen Line.
Were the station improvements pitched as part of Evergreen? I thought they were part of the upgrade package of Metrotown/New West/Main Street etc.
Reply With Quote
     
     
  #1528  
Old Posted Apr 16, 2015, 6:24 AM
dpogue dpogue is online now
Registered User
 
Join Date: Aug 2013
Posts: 769
Quote:
Originally Posted by Meraki View Post
Were the station improvements pitched as part of Evergreen? I thought they were part of the upgrade package of Metrotown/New West/Main Street etc.
The Commercial-Broadway upgrades are considered part of the Evergreen Line because it's intended to increase transfer capacity.
Reply With Quote
     
     
  #1529  
Old Posted Apr 16, 2015, 12:17 PM
TransitJack TransitJack is offline
Registered User
 
Join Date: Jul 2009
Posts: 443
Quote:
Originally Posted by dpogue View Post
The Commercial-Broadway upgrades are considered part of the Evergreen Line because it's intended to increase transfer capacity.
I think its a separate bid. The P3 building the EG line are not responsible for Commercial upgrades.

So it may be a requirement to upgrade for EG, its not part of that bid.

I think.
Reply With Quote
     
     
  #1530  
Old Posted Apr 24, 2015, 1:46 AM
Klazu's Avatar
Klazu Klazu is offline
Registered User
 
Join Date: Apr 2012
Location: Above Metro Vancouver clouds
Posts: 10,408
Main Street station.

Reply With Quote
     
     
  #1531  
Old Posted Apr 24, 2015, 5:17 AM
red-paladin red-paladin is offline
Vancouver Moderator
 
Join Date: Sep 2008
Location: Burnaby
Posts: 3,626
Great shot.
Reply With Quote
     
     
  #1532  
Old Posted Apr 24, 2015, 6:22 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
When is the west station house expected to re-open?
Reply With Quote
     
     
  #1533  
Old Posted Apr 24, 2015, 11:03 AM
DKaz DKaz is offline
Registered User
 
Join Date: Nov 2008
Location: Kelowna BC & Edmonton AB
Posts: 4,299
I heard July.
Reply With Quote
     
     
  #1534  
Old Posted Apr 29, 2015, 3:21 AM
dpogue dpogue is online now
Registered User
 
Join Date: Aug 2013
Posts: 769
Post on the Buzzer Blog about station upgrades at Commercial-Broadway:
http://buzzer.translink.ca/2015/04/phase...starting-at-commercial-broadway-station/
Reply With Quote
     
     
  #1535  
Old Posted May 1, 2015, 7:46 PM
CanSpice's Avatar
CanSpice CanSpice is online now
Registered User
 
Join Date: Dec 2014
Location: New Westminster, BC
Posts: 2,730
The following is all from an email I just received from TransLink regarding the New Westminster Station upgrades as a part of their Community Updates:

Upgrades to New Westminster Station are about to begin as the contractor prepares for the start of construction. Once complete, the upgrades will improve accessibility, capacity, safety and security at the station.

Project benefits:

- Replacement elevator and escalators to improve access for customers.
- Improved lighting and signage throughout the station.
- Glass panels that replace the existing mesh screens to improve station visibility from street level.
- Better integration with the surrounding community to make it easier to connect to and from the SkyTrain system.

Project status

The contractor expects to begin setting up on site in May. During the first few weeks, equipment will be brought in and the area will be prepped for construction.

Once setup work is complete, construction begins and is expected to continue until summer 2016.

What to expect

Our top priority is the safety of the public, passengers, employees, and contractors. Due to the nature of construction activity, we recognize there will be impacts to the public, including noise and changes to station access.

Below is a summary of the key project phases and expected impacts. For ongoing information about construction impacts associated with the project, visit www.translink.ca/newwestminster. Please note that timelines are subject to change based on construction activity.

Phase 1: East and West station access – spring 2015-summer 2015

Construction crews will focus on replacing the east escalator and upgrading the stairs, at the Eighth Street entrance, and the west escalator and stairs by the bus loop.

Painting and the installation of new window glazing will also begin at platform level, and the emergency exits at the north and south sides of the platform will be painted.

Impacts:

- Station access from Eighth Street will be closed. Passengers will be redirected to the Carnarvon Street entrance.
- The escalator and stairs from the bus loop to the concourse level will be closed. Passengers will be redirected along McNeely Street to the Carnarvon Street entrance, or through the parkade to the existing moving walkway that provides access up to the concourse level.
- Platform widths will be reduced in some areas to allow for painting, window installation, ceiling replacement and new lighting.
- Hoarding in the concourse area to allow for new ceilings, lighting and painting.
- Noise associated with large construction projects, including nighttime work with varying levels of noise while trains are not operating, is expected to begin in several weeks. Notifications will be sent in advance of particularly noisy work.

Phase 2: Eastbound and westbound platform access – summer 2015-fall 2015

Construction crews will focus on replacing the escalators and upgrading stairs to the eastbound and westbound SkyTrain platforms from the concourse level. Replacement of the south elevator, which provides access to the eastbound platform, will also begin.

Painting and installation of new window glazing at the platform level is expected to be completed in this phase.

Impacts:

- Passengers traveling eastbound and westbound can access the platforms via the Plaza 88 escalators and stairs.
- Passengers requiring the use of an elevator to access the eastbound platform can use the Plaza 88 elevator, by the cinema from the parkade west of the bus loop at street level, or by the cinema at the concourse level.
- The north elevator to the westbound platform will be in service.
- Hoarding in the concourse area to allow for new ceilings, lighting and painting.
- Neighbours can expect noise associated with large construction projects, including nighttime work with varying levels of noise while trains are not operating. Notifications will be sent in advance of particularly noisy work.

Phase 3: Concourse area upgrades – fall 2015-summer 2016

Construction crews will complete the replacement of the south elevator and begin upgrades to the concourse area.

Impacts:

- Hoarding in the concourse area to allow for new ceilings, lighting and painting.
- Neighbours can expect noise associated with large construction projects, including nighttime work with varying levels of noise while trains are not operating. Notifications will be sent in advance of particularly noisy work.
Reply With Quote
     
     
  #1536  
Old Posted May 2, 2015, 2:20 AM
Mac Write Mac Write is offline
Registered User
 
Join Date: Dec 2008
Posts: 1,423
I wish these upgrades included "down" escalators. Would really help people who have trouble with stairs and there isn't an elevator on the eight street entrance.
Reply With Quote
     
     
  #1537  
Old Posted May 3, 2015, 3:56 PM
Jimbo604 Jimbo604 is offline
Registered User
 
Join Date: Jan 2012
Posts: 1,888



Photo Source: me
Reply With Quote
     
     
  #1538  
Old Posted May 20, 2015, 12:06 AM
Sheba Sheba is offline
Registered User
 
Join Date: Jan 2015
Location: BC
Posts: 4,595
They've finally started work at New West Station - both of the street to ticket levels escalators were blocked off. Why did they have to block off the stairs too?

It was a great afternoon to hang out at Pier Park. The plantings have filled in so the traffic noise isn't as bad.
Reply With Quote
     
     
  #1539  
Old Posted Jun 11, 2015, 4:46 PM
MIPS's Avatar
MIPS MIPS is online now
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,112
Now here's is something that baffled me.
Sorry for no pics but I will try to get those up tomorrow.

Anyways at the corner of Powell and Victoria I found a shopping cart overfilled with the old brackets for the power rail. I contacted translink regarding this and they didn't seem to really care but the question still stands: how did they end up there, and what this mean about the thousands of others we've already apparently replaced?
Last I looked the cart was still there this morning.
Reply With Quote
     
     
  #1540  
Old Posted Jun 11, 2015, 4:52 PM
Kisai Kisai is offline
Registered User
 
Join Date: Jun 2014
Location: Burnaby
Posts: 1,154
Quote:
Originally Posted by MIPS View Post
Now here's is something that baffled me.
Sorry for no pics but I will try to get those up tomorrow.

Anyways at the corner of Powell and Victoria I found a shopping cart overfilled with the old brackets for the power rail. I contacted translink regarding this and they didn't seem to really care but the question still stands: how did they end up there, and what this mean about the thousands of others we've already apparently replaced?
Last I looked the cart was still there this morning.
Depends if it was intentionally left there. I'd suspect metal thieves.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 7:48 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.