HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure


 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Mar 11, 2015, 6:48 PM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by trofirhen View Post
That's what I was wondering, too. It might be adjusted (2 cars or 4 cars) to the time of day and ridership.
The new MkIII trains will be configured as "married quads" of four cars (A-C-C-B). They can't be separated into 2-car or 3-car trains.

I can see the new MkIII trains being used on the Waterfront - King George runs - especially while under warranty so anything that breaks is fixed by Bombardier.

Even with these 7 new train sets, Translink will still need the MkI and MkII train sets to handle the passenger volumes on the Expo line - especially during the rush hours. While the new MkIII trains are in constant use to be 'broken in', the MkI and MkII train sets can be added/dropped to handle the changes in passenger volumes over the day.
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:13 AM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.