Posted Mar 6, 2015, 6:22 AM
|
 |
Registered User
|
|
Join Date: Sep 2008
Location: Japan
Posts: 17,932
|
|
Skytrain to Maple Ridge could be a real option in 25 years or so if growth continues in the North East sector and Pitt Meadows / Maple Ridge begin to focus their growth in their downtown cores.
The ALR stretch is long but I feel much of it could be built at a much lower cost at grade similar to the at grade sections at YVR.
Until then a 2 station spur to PoCo could be built and would be a decent small expansion in 15 years or so.
|