Quote:
Originally Posted by jsbertram
But how do you get the trains from Burquitlam to PoMo if the tunnel isn't ready?
I know!
Barge-Train!
In the morning, just roll the trains onto a barge at Waterfront, and float them up to PoMo, and roll them onto the tracks there.
Barge them back to Waterfront at night so the trains can get back to Edmonds for overnight maintenance.
|
Nah...
All they would have to do take one of the Mark I train sets, and run them all 1-car on the disconnected part of the line. Maybe even run them manually if the computer system isn't setup to be able to run without the missing tunneled section. I assume it should be able to be run like that... what if there was ever a tunnel fire or collapse? I'm just thinking that it would be missing the communication infrastructure near the tunnel, so the stations closest to the tunnel would have no way for the train to "turn back."
Then for maintenance they just'd put them on a truck. That's what the TTC did AFAIK. The Port Moody station is supposed to be at-grade. The Mark I's are easier to de-couple than the Mark II's.
Though realistically, there's no point in running it before it's complete, because it would entail extra costs. It would only be worth doing for some kind of photo-op/ribbon-cutting stage (which would have to be done at Burquitlam station to show it "working") and even then, it would be embarrassing to have it incomplete.