Quote:
Originally Posted by TransitFreak
Thanks office dweller that's exactly what I was trying to say. Yeah guess you can single load it was consumed with the use of all 3 platforms. Guess they'll have to decide operationally what works best opposite original mandate. In the single load scenario the middle platform now is just a pocket track for all intent and purposes...
|
There's an even simpler use of Lougheed that doesn't require wrong-railing on North Road.
a) Millennium trains from Coquitlam to Vancouver use the new north platform and track.
b) Millennium trains from Vancouver to Coquitlam use the existing platform and south track.
c) Expo trains use the existing platform and middle track, and have Lougheed as their terminal station.
Expo trains can 'rest' at Lougheed without interfering with the though-traffic of the Millennium trains using the north and south tracks.
When the Expo train is ready for the trip back to Braid, New West, Metrotown and Waterfront, it just head eastwards on the middle track and through the switches back to Braid.
The switches West of Lougheed can be 'set and forget' for the Millennium trains.
The switches East of Lougheed would handle all the trains that have to change tracks (Braid to middle track and middle track to Braid for Expo trains; south track to Burquitlam for Millennium trains), but with proper train timing there shouldn't be any train interference.
This still means that anyone coming from Braid on Expo trains who has to continue westwards, and anyone from Burquitlam on Millennium trains heading to New West has to do the down/up platform shuffle.
This also makes a New West (and Surrey) to Coquitlam, or a Lougheed Highway to New West (and Surrey) transfer just a walk across the main platform.