Old Posted Jan 13, 2015, 7:44 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by Uhuniau View Post
Incidentally, anyone else finding the local bus service downtown crappier than usual with the new winter schedule?
Nah, just as bad as it usually gets in winter. Past 2 weeks might be a bad judge, service always tanks during deep freeze weeks.
     
     
  #1802  
Old Posted Jan 13, 2015, 10:51 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,718
Quote:
Originally Posted by Kitchissippi View Post
Well, the Red Blacks do train there, don't they?
Pretty crappy job at it, but yeah.
     
     
  #1803  
Old Posted Jan 14, 2015, 1:33 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,011
Quote:
Originally Posted by 1overcosc View Post
Nah, just as bad as it usually gets in winter. Past 2 weeks might be a bad judge, service always tanks during deep freeze weeks.
I dunno. It seems worser than usual.
     
     
  #1804  
Old Posted Jan 14, 2015, 2:35 AM
EdFromOttawa EdFromOttawa is offline
Registered User
 
Join Date: Sep 2013
Posts: 365
Quote:
Originally Posted by Uhuniau View Post
I dunno. It seems worser than usual.
I was turrrrible last week. Unreal how late the buses were getting. Things seem back on track this week.
     
     
  #1805  
Old Posted Jan 14, 2015, 4:21 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by EdFromOttawa View Post
I was turrrrible last week. Unreal how late the buses were getting. Things seem back on track this week.
It was the weather. -20 weather always does that... my theory is because people abandon walking entirely thus overloading everything.

I must say, I'm decently satisfied with OC but only because I'm living a short walk from the Transitway. If I wasn't, I wouldn't be. I picked my apartment specifically with this in mind.
     
     
  #1806  
Old Posted Jan 14, 2015, 5:42 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,011
Quote:
Originally Posted by 1overcosc View Post
It was the weather. -20 weather always does that... my theory is because people abandon walking entirely thus overloading everything.

I must say, I'm decently satisfied with OC but only because I'm living a short walk from the Transitway. If I wasn't, I wouldn't be. I picked my apartment specifically with this in mind.
I picked my house with transit service in mind.

Within a year, OC Transpo started "service improvements". I.e., they cut a crap-ton of runs, and replaced artics with 40-footers.
     
     
  #1807  
Old Posted Jan 15, 2015, 4:29 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,545
Construction Update
Week of January 12


Booth Street Bridge

Construction of the Booth Street Bridge is scheduled to begin this month. The Preston Street detour was put in place to allow to the use of Preston Street from Albert Street to Sir John A. MacDonald Parkway during the Booth Street closure.


Lyon Station Cavern

The Confederation Line tunnel second punch through occurred on January 4, 2015. From the West Portal, Jawbreaker punched through on the north side of the Lyon Station cavern from west to east, into the central shaft.


Parliament Station Cavern

Parliament Station cavern reinforcement continues with tension tie installation and backfilling. Mining of the bench is ongoing.


Rideau Station Canvern

Rideau Station cavern reinforcement works are ongoing 24/7.


Rideau Station

Exterior demolition of the roof and mezzanine of the existing Scotiabank building has begun and is scheduled to continue through January.


Rideau Pedestrian Footbridge

Work to reinforce the Rideau Pedestrian Footbridge on Rideau Street has been completed. Final works, including paving, are scheduled to be completed by end of month.


Belfast Yard Administration and Maintenance Building

Panel and glazing installation for building envelope is ongoing. Pouring slabs continues for the building’s internal components. Works on the shed, including roofing, continue.


Belfast Yard Connector

Works on the Belfast Yard connector, which allows vehicles to travel to and from the Light Rail Transit (LRT) track to Belfast Yard, are ongoing. Rebar, pouring of concrete bases and concrete walls continue.


Hurdman Station

Elevated guideway work continues with caisson drilling north of the existing Hurdman Station.


Highway 417 Roadworks

Drilling median foundations, installing electrical and light poles, and sewer works from Cyrville Road to Nicholas Street continue.


Hurdman Bridge

Mobilization and girder installation, part of the reconstruction of the bridge’s median span, continues.

Vanier Parkway Overpass

Final demolition works are being completed at the staging area.


Coventry Pedestrian Footbridge

Final railing installation and completion of the ceiling is taking place in the next weeks and the bridge is expected to be completed in the next month.


Belfast Road Underpass

Reconstruction on the abutments occurs as long-term closure of Belfast Road, north of Tremblay Road to Coventry Road continues.


Upcoming Construction Activities

In the coming weeks, the following construction activities will advance:
  • West Portal roadheader (Jawbreaker) is scheduled to move to the East Portal
  • Demolition of the Scotiabank building at William and Rideau streets continues.
  • Girder installation at Hurdman Bridge will continue through February.
  • Booth Street bridge construction will begin.
  • The roof of the Belfast Yard shed is scheduled for completion mid-winter.

Want photos? Go here (they're all to big for this forum):
http://www.confederationline.ca/construction/construction-update-2/
     
     
  #1808  
Old Posted Jan 15, 2015, 5:36 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,011
Quote:
Originally Posted by 1overcosc View Post
It was the weather. -20 weather always does that... my theory is because people abandon walking entirely thus overloading everything.

I must say, I'm decently satisfied with OC but only because I'm living a short walk from the Transitway. If I wasn't, I wouldn't be. I picked my apartment specifically with this in mind.
I guess I am too harsh on OCTranspo. Downtown service only sucks when the temperature is between -28 and +28, in either fall, winter, spring, or summer, only in the morning, afternoon, evening, or night, only when it's clear, raining, or snowing, and only when traffic is either light, moderate, or heavy.

At all other times, it's smooth sailing.
     
     
  #1809  
Old Posted Jan 15, 2015, 5:13 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,718
Any opinions on the new format for the updates, the frame by frame as opposed to a list.

Why do they have to provide extra support to the skywalks over Rideau?
     
     
  #1810  
Old Posted Jan 15, 2015, 6:39 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,545
Quote:
Originally Posted by J.OT13 View Post
Any opinions on the new format for the updates, the frame by frame as opposed to a list.
They seem to contain a bit less information, but that's not necessarily bad. It's certainly easier to navigate now on the web, but they're more difficult for me to reproduce here. (maybe that was the idea )
     
     
  #1811  
Old Posted Jan 15, 2015, 11:02 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,718
Quote:
Originally Posted by rocketphish View Post
They seem to contain a bit less information, but that's not necessarily bad. It's certainly easier to navigate now on the web, but they're more difficult for me to reproduce here. (maybe that was the idea )
My thoughts exactly.
     
     
  #1812  
Old Posted Jan 16, 2015, 1:00 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,677
Quote:
Originally Posted by J.OT13 View Post
Why do they have to provide extra support to the skywalks over Rideau?
Because they will be excavating the stairwell shafts beside the Rideau Centre almost right above the skywalk support foundations. The extra supports will spread the load.
     
     
  #1813  
Old Posted Jan 16, 2015, 2:06 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,011
I didn't even need to open this article to know (A) which church the headline referred to, and (B), almost word for word, what their arguments were going to be.

http://ottawacitizen.com/news/local-news/church-opposes-citys-preferred-western-lrt-route
     
     
  #1814  
Old Posted Jan 16, 2015, 4:26 PM
MoreTrains MoreTrains is offline
Registered User
 
Join Date: Oct 2014
Posts: 858
Quote:
Originally Posted by Uhuniau View Post
I didn't even need to open this article to know (A) which church the headline referred to, and (B), almost word for word, what their arguments were going to be.

http://ottawacitizen.com/news/local-news/church-opposes-citys-preferred-western-lrt-route
Yeah, I am pretty sure that there is a limit on how far below ground they can claim as theirs. Im pretty sure they can claim as far down as their lowest utility which is not as far down as the LRT would be, so these clown should probably get off their high horse.
     
     
  #1815  
Old Posted Jan 16, 2015, 5:11 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,545
Quote:
Originally Posted by Uhuniau View Post
I didn't even need to open this article to know (A) which church the headline referred to, and (B), almost word for word, what their arguments were going to be.

http://ottawacitizen.com/news/local-news/church-opposes-citys-preferred-western-lrt-route
Church opposes city's preferred western LRT route

Matthew Pearson, Ottawa Citizen
Published on: January 16, 2015, Last Updated: January 16, 2015 8:39 AM EST


An Ottawa church has come out against the city’s preferred option for the western LRT extension, saying the current routing through its Cleary Avenue property is “unacceptable.”

First Unitarian Congregation owns a 2.4-hectare parcel of land adjacent to where the proposed Cleary station would be located. In addition to the church, the property contains a seniors’ residence and daycare, both of which are also opposed to the city’s plan.

The new station is part of Phase 2 of light-rail construction, an ambitious $3-billion plan for 19 new stations and an additional 35 kilometres of track by 2023.

According to Blair Erskine, who chairs First Unitarian’s campus planning committee, the city has provided the congregation with a recent drawing that shows the proposed route cutting through its property.



The underground tunnel west of Cleary station would run beneath a parking lot and curve south to meet Richmond Road.

In a letter to Mayor Jim Watson, First Unitarian highlights four major concerns:
  • Traffic congestion: Cleary is a small street that ends at the church property. It provides the only road access to the church campus, as well as the Continental condo building on the northwest corner of Cleary and Richmond Road. The city has also approved the construction of two additional towers on the property at the northeast corner of Cleary and Richmond and the letter says access to those buildings would likely be off Cleary as well. The congregation is concerned all of this combined will create significant traffic congestion and an increased risk of accidents.

“We feel that would just be unlivable traffic congestion,” Erskine said. There are also concerns about people dropping off or picking up people at the station and parking illegally on church property, he said.
  • Noise and vibrations: Unitarian House worries its 134 residents, many of whom are in their 90s, will be constantly disrupted by noise and inconvenience during construction. There are also fears about ongoing noise due to vibration from operating trains.

“They can’t tell us this LRT is not going to affect us, and that’s what they’re trying to do is gloss over any disruptions to our lives,” said Unitarian House executive director Christina O’Neil.
  • Loss of parking: The construction phase would require the removal of a parking lot adjacent to Unitarian House and another lot used by the church for 18 to 24 months, exacerbating current problems with parking on the property.
  • Asset loss: The LRT route would travel underground beneath an area the church has designated for future development, perhaps along the lines of housing for adults living with mental health conditions.

“It will not be possible to build this type of construction over the LRT, denying the realization of this asset,” says the letter, which is signed by Maury Prevost, First Unitarian’s board president.

“For all of these reasons, the First Unitarian Congregation of Ottawa finds the current plan and proposed routing of the LRT through our property unacceptable,” concludes the letter, which was also sent to several city councillors and NCC boss Mark Kristmanson.

Despite its opposition to the city’s current plan, the church says it’s generally supportive of LRT and says that users of its property would “greatly benefit from a station within walking distance.”

What happens west of Dominion station remains an open and controversial question.

The city’s preferred route is to run trains along 1.2 kilometres of NCC land on the south side of the four-lane Sir John A. Macdonald Parkway, but the NCC is not pleased with this idea because it fears for the loss of mature trees, impeded access to the river and restricted views from the shoreline.

Last fall the NCC asked the city to include the Rochester Field-Richmond Road alignment in its ongoing environmental assessment for the construction of the western light-rail corridor or else consider a “completely buried” tunnel under the parkway to “protect this important national asset.”

In other words, the NCC did not completely slam the door on the city’s preferred route along the Ottawa River, but the commission is clearly not convinced of the city’s plan.

The disagreement caused some friction between Mayor Jim Watson and Foreign Affairs Minister John Baird, who met at the end of November and agreed to work toward a solution for 100 days.

Solving what to do in the gap between Dominion station and Lincoln Fields is “not an easy thing,” Erskine said.

“The situation is such that somebody is going to be unhappy regardless of where it goes,” he said.

Kitchissippi Coun. Jeff Leiper said Thursday he understands the church’s frustration and opposition to the city’s preferred route, but he noted it was a unanimous decision made in 2013 when the transportation master plan was approved by council.

“The city had a consultation about it and this is the route that they chose,” Leiper said. “Currently we’re in discussion with the NCC about getting to a ‘yes’ with respect to the current route, and it’s difficult to see an opportunity right now to try to reverse course.”

If the city and NCC can reach an agreement about using the Sir John A. Macdonald Parkway, Leiper said, he hopes those discussions will also provide an opportunity to re-raise the church’s concerns and address them then.

The issues raised by the congregation will be addressed in the environmental assessment study underway, the city said in a statement.

However, the extent of the impacts remains unclear as “we are still working with the National Capital Commission on an alignment,” said the statement, which was attributed to Vivi Chi, manager of transportation planning.

[email protected]
Twitter.com/mpearson78

http://ottawacitizen.com/news/local-news/church-opposes-citys-preferred-western-lrt-route
     
     
  #1816  
Old Posted Jan 16, 2015, 5:23 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
  #1817  
Old Posted Jan 16, 2015, 5:55 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,718
Maybe we should, you know, do them a favour and take it off their hands (expropriate). Once the LRT is complete, we can up-zone to 50 floors and sell it to a developer that will appreciate the subway station next door.
     
     
  #1818  
Old Posted Jan 16, 2015, 6:49 PM
silvergate's Avatar
silvergate silvergate is offline
Registered User
 
Join Date: Apr 2014
Location: Ottawa
Posts: 629
To be fair, they are doing a service to the city with their seniors residences, and building housing for the mentally ill is certainly something urgently required around the world. Perhaps the city will come up with a good compromise for them.
     
     
  #1819  
Old Posted Jan 16, 2015, 7:06 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
This just in, heard from my contact at the RIO that apparently Jawbreaker, the roadheader assigned to the western portal, is being relocated to the eastern portal tomorrow morning. The machine will be police escorted and there will be some traffic & bus disruptions as it happens.
     
     
  #1820  
Old Posted Jan 16, 2015, 7:15 PM
MoreTrains MoreTrains is offline
Registered User
 
Join Date: Oct 2014
Posts: 858
Quote:
Originally Posted by 1overcosc View Post
This just in, heard from my contact at the RIO that apparently Jawbreaker, the roadheader assigned to the western portal, is being relocated to the eastern portal tomorrow morning. The machine will be police escorted and there will be some traffic & bus disruptions as it happens.
Shouldve just bought a fourth roadheader.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:28 PM.

     
SkyscraperPage.com - Privacy Statement - Top

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.