HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


    Claridge Icon in the SkyscraperPage Database

• Building Data Page   • Comparison Diagram   • Ottawa Skyscraper Diagram

• Map Location

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #11  
Old Posted Dec 19, 2014, 3:08 PM
jitterbug jitterbug is offline
 
Join Date: Dec 2006
Posts: 259
Quote:
Originally Posted by Marcus CLS View Post
The excavation on Preston Street has been paved over. It appears to have been for a hydro upgrade to service the project site. No activity on the site today. Workers continue to work on the interior of the sales building at Adeline using a generator for power. A hydro pole has been installed on the sales building site with the connection to a main line incomplete(a role of wire at the base of the pole.) The stairs have been rebuilt on the new site and wheel chair access ramp complete. Basically redoing the former set up that was on the project site. Since the sales building has been moved I'm curious if Claridge has asperations for the remainder of the block not knowing who owns the site of the relocated sales building at Adeline. Maybe too much detail for my update but I walk by the site everyday on the way to work.
Just imagine when the hole is done and the crane is installed. Hoping the Italia across the street is relaunched next spring as planned, giving the kind of gateway worthy of Little Italy.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 4:19 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.