  #2221  
Old Posted Dec 15, 2014, 5:00 PM
upward 2000 upward 2000 is offline
Registered User
 
Join Date: Sep 2014
Posts: 403
Quote:
Originally Posted by Eightball View Post
^^hope so

Took some crappy videos of some pouring at the base.

• Video Link
Hey Eightball. Could you get a picture today of this area that they were pouring on Saturday. I was told by them last week that the 1st columns are arriving today pending no rain delays.
     
           
     
  #2223  
Old Posted Dec 15, 2014, 9:37 PM
upward 2000 upward 2000 is offline
Registered User
 
Join Date: Sep 2014
Posts: 403
[QUOTE=Eightball;6844662]I got you bro

Wilshire Grand 12/15 am by thaeisahtbizall, on Flickr
Thanks bro! It looks like they are having a lunch gathering.
     
     
  #2224  
Old Posted Dec 16, 2014, 1:25 AM
Eightball's Avatar
Eightball Eightball is offline
life is good
 
Join Date: Jun 2013
Location: all over
Posts: 2,301
I took those photos around between 9:30 and 10am though

That smoke smelled bad, not sure exactly what they were doing.
     
     
  #2225  
Old Posted Dec 16, 2014, 4:42 AM
dachacon dachacon is offline
Registered User
 
Join Date: Jan 2009
Location: Los Angeles
Posts: 149
Quote:
Originally Posted by Eightball View Post
I took those photos around between 9:30 and 10am though

That smoke smelled bad, not sure exactly what they were doing.
I was by the site around 11. I smelled sulfur which is a dead giveaway that they were wielding. couldn't peek at the hole though since I was just walking by. Gonna stop by tomorrow morning and take pictures.
     
     
  #2226  
Old Posted Dec 16, 2014, 5:08 AM
upward 2000 upward 2000 is offline
Registered User
 
Join Date: Sep 2014
Posts: 403
Quote:
Originally Posted by dachacon View Post
I was by the site around 11. I smelled sulfur which is a dead giveaway that they were wielding. couldn't peek at the hole though since I was just walking by. Gonna stop by tomorrow morning and take pictures.
That would be cool to see the 1st floor deck up close.
     
     
  #2227  
Old Posted Dec 16, 2014, 5:45 AM
SLJR SLJR is offline
Registered User
 
Join Date: Dec 2013
Posts: 52
Quote:
Originally Posted by upward 2000 View Post
Hey Eightball. Could you get a picture today of this area that they were pouring on Saturday. I was told by them last week that the 1st columns are arriving today pending no rain delays.
Steel starts next Monday.
     
     
  #2228  
Old Posted Dec 16, 2014, 5:03 PM
upward 2000 upward 2000 is offline
Registered User
 
Join Date: Sep 2014
Posts: 403
Quote:
Originally Posted by SLJR View Post
Steel starts next Monday.
Thanks.
     
     
  #2229  
Old Posted Dec 17, 2014, 1:57 AM
upward 2000 upward 2000 is offline
Registered User
 
Join Date: Sep 2014
Posts: 403

Another diagram.
     
     
  #2230  
Old Posted Dec 17, 2014, 2:57 AM
Ploppalopp Ploppalopp is offline
Registered User
 
Join Date: Sep 2014
Posts: 161
Upward,
Are you making those diagrams or are you getting them from somewhere? They are really cool. Thanks for all of the updates you provide us with all of the time!!!
     
     
  #2231  
Old Posted Dec 17, 2014, 4:48 AM
upward 2000 upward 2000 is offline
Registered User
 
Join Date: Sep 2014
Posts: 403
Quote:
Originally Posted by mdiederi View Post
"Utilizing a unique lateral system; the building has a concrete core wall up to 4 feet in thickness with buckling restrained outrigger braces in the transverse direction at three elevations along the height of the structure. At two of the outrigger levels the structure has a perimeter belt truss to resist torsion and provide for vertical load redundancy."

"For gravity loads the structure utilizes a concrete and metal deck floor framing with structural steel beams and girders. The perimeter building columns are composite steel box columns filled with structural concrete."

"The top of the building has a 100-foot tall sail structure with two BMU’s (Building Maintenance Units) for window washing and a tactical landing approach. The uppermost top of the structure will be crowned with an artist designed architectural spire..."
http://bjsce.com/portfolio/high-rise-buildings/sample-page-with-gallery/


http://bjsce.com/portfolio/high-rise-buildings/sample-page-with-gallery/


http://bjsce.com/portfolio/high-rise-buildings/sample-page-with-gallery/
This is the original post with the diagrams. Thanks to mdiederi.
     
     
  #2232  
Old Posted Dec 17, 2014, 5:18 AM
Ploppalopp Ploppalopp is offline
Registered User
 
Join Date: Sep 2014
Posts: 161
Ah ok I see. What a cool tower!
     
     
  #2233  
Old Posted Dec 18, 2014, 12:27 AM
upward 2000 upward 2000 is offline
Registered User
 
Join Date: Sep 2014
Posts: 403
Quote:
Originally Posted by Eightball View Post
I took those photos around between 9:30 and 10am though

That smoke smelled bad, not sure exactly what they were doing.
Eightball. Have they started another jump.
     
     
  #2234  
Old Posted Dec 18, 2014, 12:37 AM
mdiederi's Avatar
mdiederi mdiederi is offline
4
 
Join Date: Sep 2006
Location: JT
Posts: 4,901

wilshiregrandcenter.com


wilshiregrandcenter.com


wilshiregrandcenter.com
     
     
  #2235  
Old Posted Dec 18, 2014, 1:50 AM
Eightball's Avatar
Eightball Eightball is offline
life is good
 
Join Date: Jun 2013
Location: all over
Posts: 2,301
Rebarb is up on like 30% of the next level. Will grab a pic tomorrow am
     
     
  #2236  
Old Posted Dec 18, 2014, 7:06 AM
tony26 tony26 is offline
Registered User
 
Join Date: Oct 2014
Location: Los Angeles, CA
Posts: 22
Wednesday around 1PM
Wilshire Grand Core by tony.pall, on Flickr
     
     
  #2237  
Old Posted Dec 18, 2014, 4:12 PM
Welcome2Boise's Avatar
Welcome2Boise Welcome2Boise is offline
Certified Idahoan
 
Join Date: Feb 2013
Location: Meridian, ID
Posts: 168
Quote:
Originally Posted by Eightball View Post
Rebarb is up on like 30% of the next level. Will grab a pic tomorrow am
In related news OSHA panics as concrete companies quietly replace rebar with rhubarb in their reinforced concrete projects...
     
     
  #2238  
Old Posted Dec 18, 2014, 4:37 PM
Eightball's Avatar
Eightball Eightball is offline
life is good
 
Join Date: Jun 2013
Location: all over
Posts: 2,301
^ Doh!

Here you guys go:

Wilshire Grand by thaeisahtbizall, on Flickr


Wilshire Grand by thaeisahtbizall, on Flickr

Wilshire Grand by thaeisahtbizall, on Flickr
     
     
  #2239  
Old Posted Dec 18, 2014, 4:47 PM
upward 2000 upward 2000 is offline
Registered User
 
Join Date: Sep 2014
Posts: 403
Quote:
Originally Posted by Eightball View Post
^ Doh!

Here you guys go:
Wilshire Grand by thaeisahtbizall, on Flickr
I just want to thank Eightball and Tony26 for the photo updates.The core has jumped to the 27th floor now. The deck you see in the above pictures to the left of the core is part of the 1st floor that has been poured and is now being used for staging. Steel should start rising next week if nothing has changed.
     
     
  #2240  
Old Posted Dec 19, 2014, 4:16 AM
SLJR SLJR is offline
Registered User
 
Join Date: Dec 2013
Posts: 52
Wait till you see what the 28th floor has in store. Things at the core will be slowing down for a few weeks.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
 

Go Back   SkyscraperPage Forum > Discussion Forums > Buildings & Architecture > Completed Project Threads Archive
Forum Jump



Forum Jump


All times are GMT. The time now is 1:59 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.