  #1241  
Old Posted Dec 14, 2014, 3:53 PM
ctobsl's Avatar
ctobsl ctobsl is offline
Let It Rise!
 
Join Date: May 2007
Location: Salt Lake City, UT.
Posts: 486
111 Photos

Taken on Sunday, December 14, 2014










__________________
Photos of Downtown SLC & surrounding areas-http://skyscraperpage.com/forum/showthread.php?t=199269&highlight=ctobsl

My Mini City-Population http://saint-anthony.myminicity.com
     
     
  #1242  
Old Posted Dec 14, 2014, 9:08 PM
bflatflat9 bflatflat9 is offline
Registered User
 
Join Date: Feb 2014
Location: Salt Lake City
Posts: 308
The part above ground is obviously where the tower overlaps the theater.
Since the north end of the tower meets the sidewalk, I wonder when and how they'll meld that part with what's rising already. (Any hardhats in the house?) ((building?))
     
     
  #1243  
Old Posted Dec 14, 2014, 9:26 PM
Orlando's Avatar
Orlando Orlando is offline
Registered User
 
Join Date: Nov 2007
Location: Salt Lake City, UT
Posts: 4,132
It looks like the elevator core is just being built for the the theater right now. What's the hold up with 111?!
     
     
  #1244  
Old Posted Dec 15, 2014, 2:55 AM
Comrade's Avatar
Comrade Comrade is offline
They all float down here
 
Join Date: Jan 2002
Location: Hair City, Utah
Posts: 9,633
They should move the homeless shelter to the former Cottonwood Mall site.
     
     
  #1245  
Old Posted Dec 15, 2014, 3:06 AM
SLC Projects's Avatar
SLC Projects SLC Projects is offline
Bring out the cranes...
 
Join Date: Dec 2006
Location: Salt Lake City
Posts: 6,108
Quote:
Originally Posted by Orlando View Post
It looks like the elevator core is just being built for the the theater right now. What's the hold up with 111?!
As far as I can tell there is no hold up. That elevator core is for the tower. The steel beams to its south is part of the theater, Infact, part of the tower (around the six or seventh floor ) will hang over where those beams are.
__________________
1. "Wells Fargo Building" 24-stories 422 FT 1998
2. "LDS Church Office Building" 28-stories 420 FT 1973
3. "111 South Main" 24-stories 387 FT 2016
4. "99 West" 30-stories 375 FT 2011
5. "Key Bank Tower" 27-stories 351 FT 1976
     
     
  #1246  
Old Posted Dec 15, 2014, 6:43 AM
Stenar's Avatar
Stenar Stenar is offline
Registered User
 
Join Date: Jul 2008
Location: Salt Lake City
Posts: 3,234
Quote:
Originally Posted by SLC Projects View Post
As far as I can tell there is no hold up. That elevator core is for the tower. The steel beams to its south is part of the theater, Infact, part of the tower (around the six or seventh floor ) will hang over where those beams are.
This is what I thought also.
     
     
  #1247  
Old Posted Dec 15, 2014, 7:57 AM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
Quote:
Originally Posted by Comrade View Post
They should move the homeless shelter to the former Cottonwood Mall site.
I think we should keep the capital building and all the public schools open 24/7 and let them stay there. I also think that we should run trax 24/7 and give them a free passes so they can stay on there too.
__________________
On a mountain of skulls, in the castle of pain, I sat on a
throne of blood! What was will be! What is will be no more! Now is the season of evil!
     
     
  #1248  
Old Posted Dec 15, 2014, 7:58 AM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
Quote:
Originally Posted by Stenar View Post
This is what I thought also.
If you go look at the foundation and everything you can clearly tell that is the core for 111.
__________________
On a mountain of skulls, in the castle of pain, I sat on a
throne of blood! What was will be! What is will be no more! Now is the season of evil!
     
     
  #1249  
Old Posted Dec 15, 2014, 8:05 AM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
The walker sign is flashing blue
__________________
On a mountain of skulls, in the castle of pain, I sat on a
throne of blood! What was will be! What is will be no more! Now is the season of evil!
     
     
  #1250  
Old Posted Dec 15, 2014, 8:05 AM
Stenar's Avatar
Stenar Stenar is offline
Registered User
 
Join Date: Jul 2008
Location: Salt Lake City
Posts: 3,234
Quote:
Originally Posted by ajiuO View Post
If you go look at the foundation and everything you can clearly tell that is the core for 111.
Yes, that is what I was agreeing to as well.
     
     
  #1251  
Old Posted Dec 15, 2014, 7:45 PM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
Quote:
Originally Posted by Stenar View Post
Yes, that is what I was agreeing to as well.
And also... ..this project is coming together fast. I bet the tower starts rising pretty quick.

I wonder if they are ahead of schedule. 111 could take more time...I could seriously see the performing arts center being completed by summer-fall of 2015... I guess it really depends on the quality of finishing....the main structure will certainly be done before to long.... Perhaps they want to wait till the tower is complete to open the whol thing.... It's got to be early 2016 though.
__________________
On a mountain of skulls, in the castle of pain, I sat on a
throne of blood! What was will be! What is will be no more! Now is the season of evil!
     
     
  #1252  
Old Posted Dec 15, 2014, 8:12 PM
Orlando's Avatar
Orlando Orlando is offline
Registered User
 
Join Date: Nov 2007
Location: Salt Lake City, UT
Posts: 4,132
Quote:
Originally Posted by SLC Projects View Post
As far as I can tell there is no hold up. That elevator core is for the tower. The steel beams to its south is part of the theater, Infact, part of the tower (around the six or seventh floor ) will hang over where those beams are.
Guys, the elevator core is also for the theater. If the tower was ready to begin, then wouldn't we would also be seeing steel rise above street level on the 111 site?
     
     
  #1253  
Old Posted Dec 15, 2014, 8:34 PM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
Quote:
Originally Posted by Orlando View Post
Guys, the elevator core is also for the theater. If the tower was ready to begin, then wouldn't we would also be seeing steel rise above street level on the 111 site?
You can tell what's going on by going to the corner of 100s and main and looking over the fence. The core is quite a bit above street level... Once they get to a certainly point with that you will start to see the outside perimeter of the building rise... I'm not 100% but I think the elivator and stairs in the core only have to be reinforced concrete up to a certain level and then they can switch to cinderblock.... Witch will go much faster... I could be wrong on that.... I'll go by there today day and see what it looks like... UPAC may share elevators but they are defiantly at the core of 111... You can tell by looking at the foundation.
__________________
On a mountain of skulls, in the castle of pain, I sat on a
throne of blood! What was will be! What is will be no more! Now is the season of evil!
     
     
  #1254  
Old Posted Dec 15, 2014, 8:56 PM
stayinginformed stayinginformed is offline
Registered User
 
Join Date: May 2008
Location: Salt Lake City
Posts: 576
Quote:
Originally Posted by Orlando View Post
Guys, the elevator core is also for the theater. If the tower was ready to begin, then wouldn't we would also be seeing steel rise above street level on the 111 site?
In the blueprint for the UPAC, there are two elevators, one on the north side, and one on the south side. Look at page 27 of this PDF: http://www.slcrda.com/meetingsmin/2013/BOD/031913/9CUPACUpdate.pdf

The elevator core going up is for 111.
     
     
  #1255  
Old Posted Dec 15, 2014, 9:12 PM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
Quote:
Originally Posted by stayinginformed View Post
In the blueprint for the UPAC, there are two elevators, one on the north side, and one on the south side. Look at page 27 of this PDF: http://www.slcrda.com/meetingsmin/2013/BOD/031913/9CUPACUpdate.pdf

The elevator core going up is for 111.
I promise you... you don't even need plans to see that that is the core for one on one
__________________
On a mountain of skulls, in the castle of pain, I sat on a
throne of blood! What was will be! What is will be no more! Now is the season of evil!
     
     
  #1256  
Old Posted Dec 16, 2014, 12:58 AM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998

Untitled by ajiu0, on Flickr


Untitled by ajiu0, on Flickr


Untitled by ajiu0, on Flickr
__________________
On a mountain of skulls, in the castle of pain, I sat on a
throne of blood! What was will be! What is will be no more! Now is the season of evil!
     
     
  #1257  
Old Posted Dec 16, 2014, 2:19 AM
jubguy3's Avatar
jubguy3 jubguy3 is offline
Registered User
 
Join Date: May 2014
Location: SL,UT
Posts: 984
I think they have more work to do on the northwest part of the core but once they are done they can start putting steel in the northwest and get working on height.

Side note, brickwork is done (except for maybe the south columns) on SJQuinney and I think some of the bio mimicry glass is being installed.
     
     
  #1258  
Old Posted Dec 16, 2014, 3:51 AM
ajiuO's Avatar
ajiuO ajiuO is offline
A.K.A. Vigo
 
Join Date: May 2011
Posts: 1,998
Quote:
Originally Posted by jubguy3 View Post
I think they have more work to do on the northwest part of the core but once they are done they can start putting steel in the northwest and get working on height.

Side note, brickwork is done (except for maybe the south columns) on SJQuinney and I think some of the bio mimicry glass is being installed.

I think once they get concrete poured around all the rebar and the scaffolding moves up... Then they will start building out the perimeter from the base
__________________
On a mountain of skulls, in the castle of pain, I sat on a
throne of blood! What was will be! What is will be no more! Now is the season of evil!
     
     
  #1259  
Old Posted Dec 16, 2014, 4:03 AM
PhXsLcIf PhXsLcIf is offline
Registered User
 
Join Date: Nov 2009
Posts: 3
Don't post here much but check the forum every few weeks looking for info on the CCH. Question for all you experts, do you think Omni going into the Salt Lake and Park City markets at relatively the same time will lead to a smaller CCH? I really don't know much about development but it seems with both markets being so close it would lead to building a hotel with fewer rooms so as not to canabalize their own business during non convention times. I hope this isn't the case.
     
     
  #1260  
Old Posted Dec 16, 2014, 4:17 AM
Stenar's Avatar
Stenar Stenar is offline
Registered User
 
Join Date: Jul 2008
Location: Salt Lake City
Posts: 3,234
Quote:
Originally Posted by PhXsLcIf View Post
Don't post here much but check the forum every few weeks looking for info on the CCH. Question for all you experts, do you think Omni going into the Salt Lake and Park City markets at relatively the same time will lead to a smaller CCH? I really don't know much about development but it seems with both markets being so close it would lead to building a hotel with fewer rooms so as not to canabalize their own business during non convention times. I hope this isn't the case.
SLC and Park City serve entirely different markets and hotels in both locations would definitely not cannibalize each other.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Global Projects & Construction > City Compilations
Forum Jump



Forum Jump


All times are GMT. The time now is 3:33 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.