HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Closed Thread

 
Thread Tools Display Modes
     
     
  #4781  
Old Posted Nov 14, 2014, 5:17 PM
Simplicity Simplicity is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,774
Quote:
Originally Posted by drew View Post
This project has a very tight budget, and some less than appealing construction systems (slab on grade main floor).

I suspect it will have a hard time looking anywhere near the newest render - if it gets built in the first place.
Who would design a structural slab on grade main floor for a project with a tight budget? Tight budgets in this city get piles, grade beams, and TJI at grade. The designer should know this.

Unless it was the call of the owner...
     
     
  #4782  
Old Posted Nov 14, 2014, 5:33 PM
drew's Avatar
drew drew is online now
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,929
^ I didn't say "structural" slab (self supporting slab), it was "slab-on-grade".

Structural slabs are a premium, and rare for a residential buildings. Slabs-on-grade are "bargain basement" and best reserved for garages and basements
     
     
  #4783  
Old Posted Nov 14, 2014, 5:56 PM
Simplicity Simplicity is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,774
Quote:
Originally Posted by drew View Post
^ I didn't say "structural" slab (self supporting slab), it was "slab-on-grade".

Structural slabs are a premium, and rare for a residential buildings. Slabs-on-grade are "bargain basement" and best reserved for garages and basements
What the hell? Is there a thickened-edge and grade beam running underneath all the supporting members at least?
     
     
  #4784  
Old Posted Nov 14, 2014, 7:30 PM
drew's Avatar
drew drew is online now
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,929
Quote:
Originally Posted by Simplicity View Post
What the hell? Is there a thickened-edge and grade beam running underneath all the supporting members at least?
It would still be a system of perimeter and interior grade beams, piles etc. Just the main floor using a floating slab poured over some sort of prepared base. Much like a strip mall. Not that you'd ever want to live in a strip mall.
     
     
  #4785  
Old Posted Nov 14, 2014, 7:56 PM
Simplicity Simplicity is offline
Registered User
 
Join Date: Feb 2014
Posts: 1,774
Quote:
Originally Posted by drew View Post
It would still be a system of perimeter and interior grade beams, piles etc. Just the main floor using a floating slab poured over some sort of prepared base. Much like a strip mall. Not that you'd ever want to live in a strip mall.
Is this then poured with a fiber cement to replace the structural rebar?
     
     
  #4786  
Old Posted Nov 14, 2014, 8:02 PM
drew's Avatar
drew drew is online now
the first stamp is free
 
Join Date: Feb 2004
Location: Hippyville, Winnipeg
Posts: 8,929
^ there would still be rebar required, just for crack control though - so smaller sizes and a lot less of it (compared to a structural slab).
     
     
  #4787  
Old Posted Nov 14, 2014, 8:09 PM
SandmanSlim's Avatar
SandmanSlim SandmanSlim is offline
Registered User
 
Join Date: Nov 2014
Posts: 1
The city has no intention of reopening Waverley Street.

From the city's Public Works dept: (Sept 8, 2014)

"With the construction and completion of the Kenaston extension and connection to the Perimeter Highway, the role of Waverley St. will change significantly. Waverley St. will no longer serve as a major north-south arterial route, and will function principally as an access route for the Richmond West and South Pointe neighbourhoods. Waverley Street will function as a local access only street south of Point West Way, and will no longer provide direct access to the Perimeter Highway (PTH 100)."

http://www.winnipeg.ca/publicworks/MajorProjects/WaverleyWestARP/
     
     
  #4788  
Old Posted Nov 14, 2014, 8:26 PM
rrskylar's Avatar
rrskylar rrskylar is offline
BANNED
 
Join Date: Sep 2004
Location: WINNIPEG
Posts: 7,641
Quote:
Originally Posted by cllew View Post
There was a report in Free Press in the summer saying that the City Administration was telling council that cost had gone up because there was more work this year than the contractors could reasonably do and they (contractors) were building in the cost of the not meeting the construction deadlines into their bids.

This can be seen by some of ongoing projects as noted by the posters above. The Henderson Highway project was suppose to be done in 60 working days according to the tender document. There was an accelerated construction bonus if it had been completed earlier.
Word from Coun. Browaty is that he 🞵🞵🞵🞵 show called the Henderson Highway project won't be completed until 2015!
     
     
  #4789  
Old Posted Nov 14, 2014, 9:44 PM
Riverman's Avatar
Riverman Riverman is offline
Fossil fuel & rubber
 
Join Date: Feb 2009
Location: Ontario's feel good town
Posts: 4,031
^ Did you get that info from the EK/Elmwood facebook page?
     
     
  #4790  
Old Posted Nov 14, 2014, 11:11 PM
rrskylar's Avatar
rrskylar rrskylar is offline
BANNED
 
Join Date: Sep 2004
Location: WINNIPEG
Posts: 7,641
Quote:
Originally Posted by Riverman View Post
^ Did you get that info from the EK/Elmwood facebook page?
Yup,

Here it is:

Re: Henderson Highway Construction

I received bad news yesterday that the construction of the northbound lanes of Henderson Highway between McLeod and Springfield will NOT be completed until the 2015 construction season.

As soon as the project was contemplated I sought assurances that the work would be done this year. Shortly after Materials Management awarded the project, I ran into the owner of the company doing the project at a restaurant in Grand Forks and stressed to him... the importance of getting the work done this season. As the start-up on the work continued to be delayed, I continued to ask both our staff and our external project consultant for assurances the work would be done. Continually I was assured it would be.

Late Monday afternoon I received a call from Public Works with a request from the contractor to extend the hours of construction for the remainder of this week (Wednesday-Friday) to reduce Henderson to one lane northbound through the PM rush hour so that work could be completed. Despite granting this request, recognizing the additional hardship it would cause, I felt it was just better to get it done. Yesterday I was informed that despite granting this request, the project would not be completed this week.

Angry wouldn’t start to describe my feelings on how this project has rolled out. I am considering all sorts of options on ways to ensure something like this doesn’t happen again and will be looking at ways to improve our processes. Having seen much larger projects, specifically the Chief Peguis Trail Extension and the Disraeli Freeway (which the company doing Henderson was involved with), occur on budget and on schedule, this was a major let down.

I have been assured by our staff that the company doing the work is on the hook for temporarily making all three lanes of Henderson open and safe. Any damage caused over the winter, including potential additional concrete joint work, will be at their expense, in addition to other penalties in their contract.

Again, I’m sorry to be the bearer of this bad news and I will update everyone, as I know more.

Sincerely,

Jeff Browaty
     
     
  #4791  
Old Posted Nov 14, 2014, 11:50 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,362
Quote:
Originally Posted by SandmanSlim View Post
The city has no intention of reopening Waverley Street.

From the city's Public Works dept: (Sept 8, 2014)

"With the construction and completion of the Kenaston extension and connection to the Perimeter Highway, the role of Waverley St. will change significantly. Waverley St. will no longer serve as a major north-south arterial route, and will function principally as an access route for the Richmond West and South Pointe neighbourhoods. Waverley Street will function as a local access only street south of Point West Way, and will no longer provide direct access to the Perimeter Highway (PTH 100)."

http://www.winnipeg.ca/publicworks/MajorProjects/WaverleyWestARP/
Correct. This has been known for some time. You'll still be able to get all the way down to the service road along the Perimeter on the north side. Just wont be able to get on the Perimeter.

Welcome to the forum Slim!
     
     
  #4792  
Old Posted Nov 14, 2014, 11:51 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,843
If I recall reading the tender documents properly, there was up to $30000 for Borger as an early completion bonus if they had finished Henderson up to 10 working days early.
     
     
  #4793  
Old Posted Nov 15, 2014, 5:15 PM
EastK EastK is offline
Registered User
 
Join Date: Nov 2008
Posts: 158
I have no idea though how simply removing asphalt and repaving it can take 4 months.I guess it doesn't help that no one seems to work past 5pm and only on weekdays.
     
     
  #4794  
Old Posted Nov 15, 2014, 5:31 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Quote:
Originally Posted by h0twired View Post
I far prefer the new design.
As do I. I quite honestly don't know what to make of the first apparently conceptual rendering, take out all the colorful aspects in the render and I would still prefer the re-design/makeover.

Last edited by Cyro; Nov 15, 2014 at 7:08 PM.
     
     
  #4795  
Old Posted Nov 15, 2014, 8:12 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,843
Quote:
Originally Posted by EastK View Post
I have no idea though how simply removing asphalt and repaving it can take 4 months.I guess it doesn't help that no one seems to work past 5pm and only on weekdays.
In the contract it disallows that unless there is special permission from the city.

Which gets me to the question to why the city councilor has to approve working after hours.

It seems that the people with PE, EIT or CET designations working for the city don't have the authority to authorize after hours construction work but a city councilor does.

Granted he/she may have to take calls about the noise or slow traffic but they should only be advised the work has to be done to get back on schedule and not asked.
     
     
  #4796  
Old Posted Nov 17, 2014, 3:29 PM
The Unknown Poster The Unknown Poster is offline
Registered User
 
Join Date: Mar 2012
Posts: 1,024
Quote:
Originally Posted by SandmanSlim View Post
The city has no intention of reopening Waverley Street.

From the city's Public Works dept: (Sept 8, 2014)

"With the construction and completion of the Kenaston extension and connection to the Perimeter Highway, the role of Waverley St. will change significantly. Waverley St. will no longer serve as a major north-south arterial route, and will function principally as an access route for the Richmond West and South Pointe neighbourhoods. Waverley Street will function as a local access only street south of Point West Way, and will no longer provide direct access to the Perimeter Highway (PTH 100)."

http://www.winnipeg.ca/publicworks/MajorProjects/WaverleyWestARP/
I knew this was always the plan. Although its not so much Waverly that will access Richmond West, they changed the name of the stretch of Waverly from just North of the perimeter (where Waverly now ends) to that curve where it turns west and meets up with the new Kenaston. Cant remember the name, too lazy too look it up. But it was confusing if you used GPS from St Norbert as it went Waverly, new street, waverly all on the same road.

Which begs the question, what will they call Waverly south of the Perimeter? Signs on the Perimeter still refer to it was Waverly St (as does GPS) but a street sign on the corner of Waverly and Grandmont calls it Waverly DRIVE.

Either way, I passed by this morning and Waverly is now open south of Perimeter. Good timing as Pembina is fully open to so traffic is a lot better.
     
     
  #4797  
Old Posted Nov 18, 2014, 9:10 PM
Wigglez's Avatar
Wigglez Wigglez is offline
Source?
 
Join Date: Sep 2008
Location: Winnipeg
Posts: 662
     
     
  #4798  
Old Posted Nov 18, 2014, 10:41 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
NW Winnipeg...Why not?


A development plan is winding its way through city hall that proposes to create a new suburb in northwest Winnipeg with homes for 5,400 residents.

The planning report proposes that upwards of 1,800 dwelling units can be built on the site, through a combination of single-family homes, low-rise multiplexes and higher density, low-rise apartment buildings.

Location: Google
https://www.google.com/maps/d/viewer?mid=z5-gYQU1qNMU.klzzuaZWx-yA



Source
     
     
  #4799  
Old Posted Nov 18, 2014, 10:44 PM
Riverman's Avatar
Riverman Riverman is offline
Fossil fuel & rubber
 
Join Date: Feb 2009
Location: Ontario's feel good town
Posts: 4,031
Quote:
Originally Posted by Wigglez View Post
We want the city to grow, don't we? People need houses for growing families, especially the demographic in that area.

Some see living in blocks as degrading. A house is what most people want and as the city grows we need more houses.
     
     
  #4800  
Old Posted Nov 18, 2014, 11:43 PM
biguc's Avatar
biguc biguc is offline
Registered User
 
Join Date: Mar 2003
Location: pinkoland
Posts: 11,905
Because the city can't afford to service them.
__________________
no
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 11:24 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.