Given that both legs of the transfer are routes with headways under 10 minutes at almost all times (the only exception being that after 9pm Trillium will be at 15 minutes), and the transfer point is within an enclosed station, it's not much of a concern. Literature has consistently shown that rail-rail within-station transfers have very little transfer penalty. The main concern with the pending setup is the capacity of the Trillium Line; full double tracking is going to be needed within 20 years, possibly sooner. Confederation Line though has very little capacity concerns thankfully. It's capacity is more than twice what the ridership will be on opening day (10,700 pph is the projected peak demand, 24,000 pph the capacity).
Reply With Quote
     
     
  #342  
Old Posted Nov 5, 2014, 3:45 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
The city's handling of the upgrade project though, is quite bad. There was no need for the project to last two years, and there was no need for last summer's shutdown either. The city is just too cheap to use construction techniques that allow work on lines in service. And yes, that is technologically possible. In Toronto, they've done work on GO lines far more extensive than any of the work we've done here (they've literally converted track from at-grade to trenched while in service continuously!). When the time comes to do a full double tracking, higher ridership counts will hopefully force the city to 🞵🞵🞵🞵 it up and do it this way.
Reply With Quote
     
     
  #343  
Old Posted Nov 5, 2014, 4:07 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by 1overcosc View Post
Given that both legs of the transfer are routes with headways under 10 minutes at almost all times (the only exception being that after 9pm Trillium will be at 15 minutes), and the transfer point is within an enclosed station, it's not much of a concern. Literature has consistently shown that rail-rail within-station transfers have very little transfer penalty. The main concern with the pending setup is the capacity of the Trillium Line; full double tracking is going to be needed within 20 years, possibly sooner. Confederation Line though has very little capacity concerns thankfully. It's capacity is more than twice what the ridership will be on opening day (10,700 pph is the projected peak demand, 24,000 pph the capacity).
The concern is that service frequency will be at best 16 minutes on the airport leg and the Riverside South leg, and that is assuming that frequency will not be affected by opening new stations at Gladstone and Walkley. You would expect small further delays because of this.

For most passengers, the transfer penalty will come because there will be two transfers to get downtown and one of the legs will be on a bus.
Reply With Quote
     
     
  #344  
Old Posted Nov 5, 2014, 4:13 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
Originally Posted by 1overcosc View Post
The city's handling of the upgrade project though, is quite bad. There was no need for the project to last two years, and there was no need for last summer's shutdown either. The city is just too cheap to use construction techniques that allow work on lines in service. And yes, that is technologically possible. In Toronto, they've done work on GO lines far more extensive than any of the work we've done here (they've literally converted track from at-grade to trenched while in service continuously!). When the time comes to do a full double tracking, higher ridership counts will hopefully force the city to 🞵🞵🞵🞵 it up and do it this way.
Yes, but are the right of ways a lot wider in Toronto allowing this to happen? I believe there are potentially bigger problems coming in Toronto on less busy Go lines where there is presently only a single track and not a wide corridor to work with. Also, has Toronto faced a lot of trenching in bedrock and tunneling under water in upgrading the Lakeshore and Kitchener lines?
Reply With Quote
     
     
  #345  
Old Posted Nov 5, 2014, 4:41 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by lrt's friend View Post
Yet another service interruption this weekend. The one track O-Train is so vulnerable and it is amazing how difficult it has been to increase service frequency.
How exactly is the single track relevant, here?

This shutdown was related to an upgrade of the signalling system. If they're going to shutdown for a signalling system upgrade on a single track, then they'd do it on a double track system as well. Doubling frequency does require adding extra signalling blocks to the line, and even a full double track system will still have crossovers, so the rationale for the shutdown exists independent of track numbers.

The problem we have here is the wider City of Ottawa shutdown mentality. Shutting stuff down is the first reflexive response they have to any kind of issue. Sometimes they can't get away with it, but when they think they can, they do.

Quote:
I am not sure how a two pronged extension to Riverside South and the airport will ever work and deliver a reasonable level of service. I also don't understand why the city expects people to use this route to go downtown, which involves yet another transfer.
People in places like the Randstad region of the Netherlands travel that kind of distance every day and make transfers at both ends. But here in Ottawa... well god forbid anyone be required to make a transfer for anything.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #346  
Old Posted Nov 5, 2014, 4:45 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by lrt's friend View Post
Yes, but are the right of ways a lot wider in Toronto allowing this to happen? I believe there are potentially bigger problems coming in Toronto on less busy Go lines where there is presently only a single track and not a wide corridor to work with. Also, has Toronto faced a lot of trenching in bedrock and tunneling under water in upgrading the Lakeshore and Kitchener lines?
Railway RoWs seldom differ from the 100' norm. If anything, it's us who have the more room from a practical point of view since several of our RoWs (including the O-Train south of the Rideau River) have vacant land alongside them.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #347  
Old Posted Nov 5, 2014, 8:29 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,403
Quote:
Originally Posted by 1overcosc View Post
The city's handling of the upgrade project though, is quite bad. There was no need for the project to last two years, and there was no need for last summer's shutdown either. The city is just too cheap to use construction techniques that allow work on lines in service. And yes, that is technologically possible. In Toronto, they've done work on GO lines far more extensive than any of the work we've done here (they've literally converted track from at-grade to trenched while in service continuously!). When the time comes to do a full double tracking, higher ridership counts will hopefully force the city to 🞵🞵🞵🞵 it up and do it this way.
When riding the train this morning a rep from OCTranspo was giving a tour of the line to a group of engineers visiting from Boston. The most interesting thing I overheard was that they tried to fit in a refurbishment of the Rideau River bridge last summer and couldn't, and that the refurb would have to be done in ~5 years when the next shutdown takes place.
Reply With Quote
     
     
  #348  
Old Posted Nov 5, 2014, 10:13 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,097
Quote:
Originally Posted by Dado View Post
People in places like the Randstad region of the Netherlands travel that kind of distance every day and make transfers at both ends. But here in Ottawa... well god forbid anyone be required to make a transfer for anything.
Unless you're trying to just get from one downtown neighbourhood to another, in which case service has been "improved" for you by route-splits at Rideau.
Reply With Quote
     
     
  #349  
Old Posted Nov 5, 2014, 10:32 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
My impression is that reliability was improved by the split.
Reply With Quote
     
     
  #350  
Old Posted Nov 5, 2014, 10:55 PM
EdFromOttawa EdFromOttawa is offline
Registered User
 
Join Date: Sep 2013
Posts: 365
Quote:
Originally Posted by lrt's friend View Post
Yet another service interruption this weekend. The one track O-Train is so vulnerable and it is amazing how difficult it has been to increase service frequency. I am not sure how a two pronged extension to Riverside South and the airport will ever work and deliver a reasonable level of service. I also don't understand why the city expects people to use this route to go downtown, which involves yet another transfer.

Here is the service interruption announcement:

O-Train service will be replaced by Route 107 for two days — November 8 and 9 — in order to complete signal work for expanded O-Train service later this year. This work is an important part of the expansion project which is required to build and maintain a safe rail service for customers. The work is being performed when ridership is lower to lessen the impact on customers.

Temporary bus Route 107 will operate:
• Nov. 8: every 15 minutes
• Nov. 9: • From 10 am to 6 pm: every 15 minutes
• Before 10 am and after 6 pm: every 30 minutes


Buses will travel parallel to the O-Train routing between Bayview and South Keys stations, making only limited stops along the way.
It really is quite astounding how much time and effort has gone into decreasing wait times from 15 minutes to 8 on a 5 station line....

Hopefully this expansion will help pave the way for faster/easier expansions later if the line is lengthened further south.
Reply With Quote
     
     
  #351  
Old Posted Nov 6, 2014, 4:43 AM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
It's got to the point where it's time to put the amateurs in charge, since the professionals just don't seem up to the task.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #352  
Old Posted Nov 6, 2014, 4:53 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Quote:
People in places like the Randstad region of the Netherlands travel that kind of distance every day and make transfers at both ends. But here in Ottawa... well god forbid anyone be required to make a transfer for anything.
The point being?

My point is that each transfer reduces ridership significantly. That is a known fact.
Reply With Quote
     
     
  #353  
Old Posted Nov 6, 2014, 11:57 AM
EdFromOttawa EdFromOttawa is offline
Registered User
 
Join Date: Sep 2013
Posts: 365
Quote:
Originally Posted by Catenary View Post
When riding the train this morning a rep from OCTranspo was giving a tour of the line to a group of engineers visiting from Boston. The most interesting thing I overheard was that they tried to fit in a refurbishment of the Rideau River bridge last summer and couldn't, and that the refurb would have to be done in ~5 years when the next shutdown takes place.
LOL for real why is OCTranspo being used as an example for anyone?!
Reply With Quote
     
     
  #354  
Old Posted Nov 6, 2014, 12:51 PM
McC's Avatar
McC McC is offline
Registered User
 
Join Date: Apr 2010
Posts: 3,057
You can learn a lot from others' mistakes.
Reply With Quote
     
     
  #355  
Old Posted Nov 6, 2014, 1:19 PM
Jamaican-Phoenix's Avatar
Jamaican-Phoenix Jamaican-Phoenix is offline
R2-D2's army of death
 
Join Date: Jun 2007
Location: Downtown Ottawa
Posts: 3,561
Thanks to Rapibus, people now know what NOT to do.
__________________
Franky: Ajldub, name calling is what they do when good arguments can't be found - don't sink to their level. Claiming the thread is "boring" is also a way to try to discredit a thread that doesn't match their particular bias.
Reply With Quote
     
     
  #356  
Old Posted Nov 6, 2014, 1:29 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
The Rapibus learned from the Transitway's mistakes (little to no priority where it matters ― downtown), but not in the right way
__________________
I've always struggled with reality. And I'm pleased to say that I won.
Reply With Quote
     
     
  #357  
Old Posted Nov 6, 2014, 2:00 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
Quote:
Originally Posted by lrt's friend View Post
The point being?

My point is that each transfer reduces ridership significantly. That is a known fact.
Does the need to transfer at LeBreton for Hull-bound passengers "significantly" reduce ridership?

This transfer penalty is not nearly as high as is imagined when the transfers are fairly quick and hassle free.
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #358  
Old Posted Nov 6, 2014, 4:18 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Re: Toronto, no GO Train line has 15 minute off-peak service. Heck, some lines don't even operate outside of peak hours.
Reply With Quote
     
     
  #359  
Old Posted Nov 6, 2014, 4:49 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by Dado View Post
Does the need to transfer at LeBreton for Hull-bound passengers "significantly" reduce ridership?

This transfer penalty is not nearly as high as is imagined when the transfers are fairly quick and hassle free.
Exactly. In fact, research from Toronto has shown that if given a choice, riders prefer higher frequencies & more transfers over lower frequencies & direct trips. In Toronto, when the subway system's second line opened, they briefly had the two lines interline with each other in such a way that no transfers would ever be required:

Source: Wikipedia

This system however meant that each individual train could only run at half the frequency because each station had two services passing through it. As such, people had direct trips but their average waits on the platform were twice as long. This proved unpopular and within a few months interlining was abandoned, and transfers were introduced but frequency was doubled. And that change resulted in happier riders.
Reply With Quote
     
     
  #360  
Old Posted Nov 6, 2014, 4:51 PM
Beedok Beedok is offline
Exiled Hamiltonian Gal
 
Join Date: Jun 2012
Posts: 6,797
Yeah, the length of wait is a major factor. Waiting 5-10 minutes for a transfer is okay. Waiting 15-30 minutes is rather annoying.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:53 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.