Biz, tourism leaders say time has come for airport rail link

By Jon Willing, Ottawa Sun
First posted: Thursday, August 21, 2014 06:03 PM EDT | Updated: Thursday, August 21, 2014 06:06 PM EDT


Heavyweights of the city's business and tourism sectors say the time has come to seriously consider a rail link to the Ottawa International Airport.

Ian Faris, CEO of the Ottawa Chamber of Commerce, said business leaders wouldn't necessarily want an airport link at any cost, but the time seems right to pursue the transit service if an southern extension is in the plans.

"I think now is the best opportunity but I don't want to prejudge what is going to come out of the (environmental assessment) or the planning process," Faris said Thursday.

Faris said the chamber called for the city to study the rail link last year as part of the announced Phase 2 transit expansion.

"To be a modern city, I think you need to have that rail link," Faris said.

An environmental assessment is underway on an O-Train extension to Riverside South and a possible connection to the airport.

The airport link isn't a slam dunk since the feasibility, cost and funding sources still need to be determined.

The city believes it can extend the train to Riverside South for $99 million, with help from the upper-tier governments.

Steve Ball, president of the Ottawa Gatineau Hotel Association, said an airport rail link would be great for hotel customers.

"As an association, of course we would want a link to the airport, and ultimately we would want a direct link where they wouldn't want to transfer," Ball said.

"We already have poor road access to the airport. This is an opportunity to provide a different mode of transportation to the airport."

A rail link might also put the city at a competitive advantage, according to the CEO of the Ottawa Convention Centre.

"When it is available in other destinations, then it's something you have to start thinking about furiously," Patrick Kelly said.

Vancouver has a rail link and Toronto is getting one.

Kelly said meeting planners often ask about transportation between the Ottawa airport and downtown.

"It's something that is not unimportant to these people," Kelly said.

Ottawa Tourism CEO Noel Buckley said a rail link to the airport would be "convenient and beneficial to the tourism industry," but he doesn't know when the time would be right to build a line.

"Yes, it would be nice to have," Buckley said, but he first wants to see the results of the environmental assessment.

The tourism agency doesn't receive a lot of comments on transportation to the airport, he said.

[email protected]
Twitter: @JonathanWilling

http://www.ottawasun.com/2014/08/21/biz-tourism-leaders-say-time-has-come-for-airport-rail-link
Reply With Quote
     
     
  #322  
Old Posted Aug 22, 2014, 2:18 AM
Jamaican-Phoenix's Avatar
Jamaican-Phoenix Jamaican-Phoenix is offline
R2-D2's army of death
 
Join Date: Jun 2007
Location: Downtown Ottawa
Posts: 3,561
It would certainly be nice to have rail to the airport.
__________________
Franky: Ajldub, name calling is what they do when good arguments can't be found - don't sink to their level. Claiming the thread is "boring" is also a way to try to discredit a thread that doesn't match their particular bias.
Reply With Quote
     
     
  #323  
Old Posted Aug 22, 2014, 2:04 PM
Radster Radster is offline
Registered User
 
Join Date: Oct 2007
Location: Chelsea
Posts: 997
My trick, but only if I am picking someone up in the evening when there are less departures, is to wait in my car at the departure level, at least there, you don't get hassled by the power-tripping airport security idiots so you don't have to keep on circling around.
Reply With Quote
     
     
  #324  
Old Posted Aug 22, 2014, 2:29 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,801
Quote:
Originally Posted by Radster View Post
My trick, but only if I am picking someone up in the evening when there are less departures, is to wait in my car at the departure level, at least there, you don't get hassled by the power-tripping airport security idiots so you don't have to keep on circling around.
Why don't you just use the new "cell phone lot" and wait for the folks you're picking up to text you?

The other thing you can do is park in the garage and go inside. If you're parked for <15 minutes, it's free.
Reply With Quote
     
     
  #325  
Old Posted Aug 22, 2014, 4:04 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Unless businesses and the airport are ready to invest large sums of money into a direct Airport-Downtown line, this isn't going to happen. All the City is studying at this point (as far as I can tell) is an Airport-Bayview which is practically useless.
Reply With Quote
     
     
  #326  
Old Posted Aug 22, 2014, 5:45 PM
citydwlr citydwlr is offline
Registered User
 
Join Date: Mar 2013
Posts: 734
Quote:
Originally Posted by J.OT13 View Post
Unless businesses and the airport are ready to invest large sums of money into a direct Airport-Downtown line, this isn't going to happen. All the City is studying at this point (as far as I can tell) is an Airport-Bayview which is practically useless.
Are they looking into the option of keeping the original plan in place (ie, with no direct link to the airport), and having the airport create its own rail link of sorts from the Otrain to the airport? I would think in this case, the airport could partner up with the nearby hotel (Hilton Garden Inn?) and EY Centre to provide direct access points at a fee to help subsidize the cost, no?
Reply With Quote
     
     
  #327  
Old Posted Aug 22, 2014, 9:35 PM
J.OT13's Avatar
J.OT13 J.OT13 is online now
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 29,131
Quote:
Originally Posted by citydwlr View Post
Are they looking into the option of keeping the original plan in place (ie, with no direct link to the airport), and having the airport create its own rail link of sorts from the Otrain to the airport? I would think in this case, the airport could partner up with the nearby hotel (Hilton Garden Inn?) and EY Centre to provide direct access points at a fee to help subsidize the cost, no?
Again, if I'm wrong, anyone with more knowledge may correct me; all they are looking at now is a spur between the O-Train and the airport and the airport is paying part of the study. The service frequency would split at the airport spur, so say we had trains every 8 minutes between Bayview and South Keys, it would be every 16 minutes for the Airport station and Boweville station.
Reply With Quote
     
     
  #328  
Old Posted Aug 22, 2014, 11:43 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,682
Human error, faulty switch caused O-Train derailment

Matthew Pearson, Ottawa Citizen
Published on: August 22, 2014, Last Updated: August 22, 2014 6:26 PM EDT


The city is blaming the recent O-Train derailment on human error and a spring switch that didn’t close properly.

On Aug. 11, just after 3 p.m., the O-Train travelling north toward Bayview station experienced a partial derailment as it approached Carleton station.

When the train was evacuated after the derailment, a woman in her 50s requested assistance because she was suffering from a sore neck and back. She was taken to hospital as a precaution.

No other injuries were reported.

The O-Train returned to regular service at approximately 8:45 a.m. the next day, once the necessary repairs and inspections were conducted to the track and signal infrastructure to ensure that train service could safely return to regular operation.

In an interview Friday, OC Transpo general manager John Manconi said there’s been no issue with the switch since the incident.

“It’s functioning perfectly now,” he said.

An investigation has revealed that a spring switch, which is a piece of rail infrastructure that moves to direct a train from one track to another, remained slightly open, causing the train’s second and third wheel sets to derail. The train was travelling at approximately 20 km/h at the time.

“The investigation indicates that the spring switch did not properly close when a previous southbound trip travelled over it, resulting in a piece of the spring switch to become dislodged, resulting in the switch remaining in an open position,” Manconi said in a memo released earlier Friday.

There was also a human factor at play. The operator failed to exit the train and physically inspect the track switch to ensure full alignment of the track after noting a signal light irregularity.

The operator contacted the rail traffic control centre and confirmed that the signal irregularity was not due to another vehicle being in the section of the track. The operator reduced the travelling speed in accordance with the rules.

When signal irregularities arise, operators are trained to follow Canadian Rail Operating Rules, which include exiting the train to conduct an inspection.

“This procedure was not followed in relation to this occurrence. Transit Services Department has taken the appropriate internal action to ensure adherence to operating procedures,” Manconi said in the memo.

The operator is on “investigatory leave,” which means they continue to be paid while the investigation is conducted. “We take appropriate action once we have all the facts and information before us,” Manconi told the Citizen.

The city is also working with the train manufacturer Bombardier on the assessment of the train and to identify any necessary maintenance and repairs to the train, which is currently at the city’s Walkley facility.

There is no dollar estimate for repairing it, Manconi said. The O-Train service is now down to two trains, but repairing the third train will depend on cost and how soon the new O-Trains can be brought online.

[email protected]
mpearson78

http://ottawacitizen.com/news/local-news/human-error-faulty-switch-caused-o-train-derailment
Reply With Quote
     
     
  #329  
Old Posted Aug 25, 2014, 5:02 PM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,682
Reduced O-Train service due to electrical issues

Andrew Nguyen, Ottawa Citizen
Published on: August 25, 2014, Last Updated: August 25, 2014 12:36 PM EDT


The O-Train is operating only from Greenboro station to Carleton University on Monday due to electrical issues with the train, according to a spokesperson from OC Transpo.

With the reduced service, the 107 bus route will be supplementing transit from Carleton University to Bayview station. OC Transpo said they are working on getting the issue fixed, but they don’t know when service will return to normal.

http://ottawacitizen.com/news/local-news/reduced-o-train-service-due-to-electrical-issues
Reply With Quote
     
     
  #330  
Old Posted Aug 25, 2014, 7:28 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
This is getting insane. OC, please contract out the O-Train now. It seems they can't run it at all. Disgusting.
Reply With Quote
     
     
  #331  
Old Posted Aug 25, 2014, 7:31 PM
Mikeed Mikeed is offline
Registered User
 
Join Date: Jun 2013
Posts: 377
Quote:
Originally Posted by 1overcosc View Post
This is getting insane. OC, please contract out the O-Train now. It seems they can't run it at all. Disgusting.
I think that's a major over reaction.

The otrain *pilot project* is a pride of OC transpo & Ottawa.
__________________
Long time reader.
Seldom post.
Reply With Quote
     
     
  #332  
Old Posted Aug 25, 2014, 7:47 PM
OTSkyline OTSkyline is online now
Registered User
 
Join Date: Jun 2012
Posts: 2,827
^ I don't think anybody is debating the fact that the O-train is good for Ottawa and was a great pilot project, BUT it does seem like for such a small line (only 8km) there have been way too many service interruptions and issues with it.
Reply With Quote
     
     
  #333  
Old Posted Aug 26, 2014, 3:08 AM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,097
Quote:
Originally Posted by OTSkyline View Post
^ I don't think anybody is debating the fact that the O-train is good for Ottawa and was a great pilot project, BUT it does seem like for such a small line (only 8km) there have been way too many service interruptions and issues with it.
Also, a lame and unbelievable slow approach to expansion. Why in hell is there still no station at Gladstone or Walkley?
Reply With Quote
     
     
  #334  
Old Posted Aug 26, 2014, 4:20 AM
Mikeed Mikeed is offline
Registered User
 
Join Date: Jun 2013
Posts: 377
Quote:
Originally Posted by Uhuniau View Post
Also, a lame and unbelievable slow approach to expansion. Why in hell is there still no station at Gladstone or Walkley?
Have you been following local politics since 2001?

Though, Gladstone and Walkey should have been included in the roll out of 8 min headways.

But only so much can be done with the taxbase we can pull from- and most of it has gone to transitway expansions that are $$$.
__________________
Long time reader.
Seldom post.
Reply With Quote
     
     
  #335  
Old Posted Aug 26, 2014, 5:51 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,097
Quote:
Originally Posted by Mikeed View Post
Have you been following local politics since 2001?

Though, Gladstone and Walkey should have been included in the roll out of 8 min headways.

But only so much can be done with the taxbase we can pull from- and most of it has gone to transitway expansions that are $$$.
How expensive could one (or both) of those stations be?
Reply With Quote
     
     
  #336  
Old Posted Aug 26, 2014, 6:21 PM
DarkArconio DarkArconio is offline
Registered User
 
Join Date: Mar 2010
Posts: 182
The reason for not adding those stations now is they don't want to increase volume on the O-Train when it'll already be increasing when the transit way to hurdman closes. The station expansions with happen in phase 2 once the confederation line is complete.
Reply With Quote
     
     
  #337  
Old Posted Sep 11, 2014, 1:37 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,255
Reply With Quote
     
     
  #338  
Old Posted Sep 12, 2014, 7:03 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
That 6-day shutdown ideally should be during Fall Reading Week when Carleton closes down, in the last week of October. Say October 26-October 31. The expanded service could then begin on November 1.
Reply With Quote
     
     
  #339  
Old Posted Sep 17, 2014, 7:29 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Expanded service expected in mid-November but may be delayed to mid-December.

Source: http://www.ottawasun.com/2014/09/17/o-train-might-expand-in-november
Reply With Quote
     
     
  #340  
Old Posted Nov 5, 2014, 2:55 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,811
Yet another service interruption this weekend. The one track O-Train is so vulnerable and it is amazing how difficult it has been to increase service frequency. I am not sure how a two pronged extension to Riverside South and the airport will ever work and deliver a reasonable level of service. I also don't understand why the city expects people to use this route to go downtown, which involves yet another transfer.

Here is the service interruption announcement:

O-Train service will be replaced by Route 107 for two days — November 8 and 9 — in order to complete signal work for expanded O-Train service later this year. This work is an important part of the expansion project which is required to build and maintain a safe rail service for customers. The work is being performed when ridership is lower to lessen the impact on customers.

Temporary bus Route 107 will operate:
• Nov. 8: every 15 minutes
• Nov. 9: • From 10 am to 6 pm: every 15 minutes
• Before 10 am and after 6 pm: every 30 minutes


Buses will travel parallel to the O-Train routing between Bayview and South Keys stations, making only limited stops along the way.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 6:48 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.