As for size of the hotel, it will all depend on the location that is chosen.
There are a few sites that will not allow a wider tower. The only site that would allow a wider tower is RWP. The restrictions on the Solar Panel lighting will help to limit the wall if RWP is chosen.
The spot I spoke of earlier around the SPCC would not block the panels in the afternoon (if at all) and would probably be the best location for height due to the size.
After looking at most of the sites that would be options for the CCH, I would be surprised if they went with anything under 30 stories. And that 30 stories would be at RWP. I think any other location and we are looking at 36 to 45 stories. This is based on 1000 rooms. They of course could go higher (1200) or lower (850) as stated in the RFP.
As for the timeline, the original link to the Trib article has been updated to include the following:
Quote:
Charlie Muller, an acquisitions and development consultant with Omni, told The Associated Press in September that there are several sites in downtown Salt Lake City where the hotel could be built but he didn’t specify them.
Muller estimated that construction would take about two years, with the hotel opening no sooner than 2018.
|
Hopefully we will hear about a location by the end of the year (provided the due diligence doesn't take longer). Once a location is selected, we should start to see massing models from Omni as well as our own `shopped models so that we can start to see how things will possibly look in the skyline.
So, now that we have heard about a large prospective developer for the CCH, when do we think we will hear something about the AIR?