View Poll Results: Based on options for Broadway Corridor Study, what is your preferred choice?
BRT: Commercial to UBC 25 6.16%
LRT A: Commercial to UBC OR Commercial via VCC to UBC 31 7.64%
LRT B: Main St. to UBC AND Commercial to UBC 18 4.43%
RRT: Commercial to UBC OR VCC to UBC 283 69.70%
COMBO: RRT to Arbutus/LRT to Main St via Arbutus 39 9.61%
BUS: Enhanced Bus Service for all buses to UBC 10 2.46%
Voters: 406. You may not vote on this poll

Closed Thread

 
Thread Tools Display Modes
     
     
  #6161  
Old Posted Sep 28, 2014, 7:04 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
Quote:
Originally Posted by trofirhen View Post
The final reason being that going underground all the way along Broadway would be so much more 'urbane' and less grotesque-looking.
Excuse this remark, but for those who want a fun, overhead, monorail ride that badly, go to Disneyland .... or take the Evergreen Line. Point Grey
- at least West of Arbutus - would, IMO, be scarred grotesquely by overhead guideway columns, and no I'm not a NIMBY-caterer.
i would have to agree with this. as much as it technically isn't needed, point grey really is different from a lot of other parts of this city. the guideway really would look out of place in point grey.

i also don't get why people love the elevated lines for the view. since when are public transit systems built to give tourists a view of mountains, or in some parts, really crappy areas of the city.

i feel i must apologize, though, to all the west side haters as they seem to outnumber people like myself. no, i don't live in point grey nor did i grow up there.
     
     
  #6162  
Old Posted Sep 28, 2014, 10:03 PM
urbancanadian urbancanadian is offline
Registered User
 
Join Date: Aug 2014
Location: Vancouver
Posts: 713
According to Frances Bula, it sounds like the engineering department essentially has stacks of documents to prove that burying the line is indeed necessary. Remember, there have been a zillion studies undertaken by the city over the last 20+ years, with regards to rapid transit through the corridor.

Here's my take:

I think everyone can agree that the line needs to be extended from the current terminus at VCC-Clark. Building otherwise would necessitate extra transfers, and therefore attract lower ridership, resulting in a higher cost per passenger. Of course this would also mean building a new OMC, etc. So let's assume that option is a no-go.

The first section (VCC-Great Northern Way) is the easiest and wouldn't need to change since it is elevated, and already has a ROW reserved. The next section (GNW-Mount Pleasant) would need to be tunnelled since the change in elevation is far too steep due to the escarpment.

Mount Pleasant Station would still need to be underground since the climb from below grade to above street level would probably also be too steep since the station itself needs to be flat/level.

Of course there is the issue of where to put the elevated guideway and how to construct it.

Do you put it in a laneway or along a street (ie. Broadway or 10th)? The alley on the south side of Broadway is obviously very narrow and would require significant demolition in order to fit the guideway in some areas. For example, large chunks of the buildings at Broadway and Granville would need to be knocked down. Furthermore, the gantry crane required to build the guideway couldn't fit so you would need to demo even more or use a more expensive method as seen in some of the short elevated sections on the Evergreen Line. Then there would be the issue of station locations (below). The alley on the north side of Broadway doesn't even exist for the entire route and would require the demolition of several towers in addition to the constraints listed above.

What about 10th Avenue? There are so many issues with a guideway here. For instance, there isn't even enough space everywhere for cars to pass each other (the street is basically 3 lanes wide). This would mean eliminating most parking and likely making the street one-way for much of it. This is also one of the busiest bike routes in the city - due to to be significantly upgraded (AAA). Also, thousands of fully matured trees would be chopped down, far more than during Canada Line construction. The tree canopy is actually very dense here.

To add to all this, the plethora of affordable rental buildings along the corridor would likely be the hardest hit by the huge amount of demolition, which by the way would require MAJOR expropriation, at a huge expense.

To me, the only place where the guideway could reasonably be located would be along Broadway itself. The problem though, is the chaos that would ensue from building a line along a road far busier than Cambie. The street cannot be widened a-la North Road, so two lanes at a bare minimum would need to be removed during construction. And two lanes would likely be closed permanently. Parking would be permanantly removed as well as many turning movements. The #99 would need to be rerouted. Likely the #9 as well. Other routes that use the street (#14, 16, 17) would be affected. This would mean much long walks for passengers among other issues...
And of course traffic issues would come at a large cost to the economy.

Now comes the toughest part of it all - the stations:
Every station would need to be located high above the street because you would need Brentwood-style mezzanine levels below the tracks/platforms themselves. This is extremely expensive and just about as ugly as it gets-but looks are not the issue here. You would end up with massive monolithic stations forever shadowing some of the busiest - and best - parts of the city.
Stations are quite wide too... Think of each track being more than one lane wide, plus platforms and you have a station that is easily 6 lanes wide. Basically, while you could probably squeeze them in, the stations would be fronting right up against the buildings on either side of the road. And remember these are not Canada Line-sized stations; they will be up to - and sometime more than - a block-long structure.

Conceivably, you could build streetside stations in some locations, in order to avoid building large mazzanine levels. But this would require expropriating and bulldozing entire blocks of land adjacent to the major cross-streets. The only spot where I think you could do this at a reasonable price, would be at the Kingsgate Mall site - but then you run into the challenges noted way above (geez this is getting long, sorry). Of course this would also require a guideway that zig-zags in and out of the street since it could not continue straight.

I could go on and on, and still wouldn't touch the smaller issues such as viewcone infringements, lawsuits, noise issues, etc, etc.

Maybe another day or when this topic comes up again, as it inevitably will.
     
     
  #6163  
Old Posted Sep 28, 2014, 10:46 PM
Caliplanner Caliplanner is offline
Registered User
 
Join Date: Mar 2014
Posts: 92
Zassk, that depends on your mass transit funding formula. If property taxes are the foundation of a given region's mass transportation budget then the wealthier suburbs are the main contributors even though they may (chose to) be car dependent (and thus not use public mass transit systems as much). Historically, fare box receipts have never really covered the cost of building out expensive transportation infrastructure (that honour instead falls to various forms of direct/indirect taxes-e.g. gas tax/sales tax/property tax etc.). But again, effective transportation planning emphasizes spatial equity over spatial equality!!
     
     
  #6164  
Old Posted Sep 29, 2014, 2:23 AM
spm2013 spm2013 is offline
More Towers
 
Join Date: Jan 2013
Posts: 2,312
Has there been any recent new from the Feds/province on funding?
     
     
  #6165  
Old Posted Sep 29, 2014, 4:44 AM
MIPS's Avatar
MIPS MIPS is offline
SkyTrain Nut
 
Join Date: Mar 2013
Location: Kamloops
Posts: 2,082
Quote:
Originally Posted by aberdeen5698 View Post
...which would have been no harder to cut-and-cover than Cambie was. Easier, in fact, since it would have had almost zero disruption on traffic and businesses.
Nope. That RoW was still a semi-active rail line in the mid-80's serving mixed industry as far west as Joyce Station. I can't recall who owned it (EDITED: It's BC Hydro) but they would have a fit of you did cut and cover.


Original source unknown

Original source unknown (Alan M?)


Quote:
Or, to look at it the other way around, it would have been just as easy to build an elevated line along the southern section of Cambie as it was along the Expo line's former rail ROW.

So why is one elevated and the other underground?
You could get an elevated guideway through that RoW in the 80's because while it was high density in most places the properties were still low value and most people didn't care. BC Transit put a huge effort into telling the public that it would be quieter and less intrusive then building at or below grade and for the most part it has been.
By the time the Canada Line was proposed the Canbie corridor was so expensive that any NIMBY that had any amount of leverage was pushing it to be buried at the expense of a traffic nightmare to both vehicles and businesses along the road. You couldn't persuade these people even if you tried. They did not want a train in their neighborhood. The Canada Line as a whole is an engineering disaster and should never be used in any way to compare to other projects or proposals.
I'd bet you $100 that if the Expo Line was built today we would probably see everything between Broadway and Edmonds be underground.

Last edited by MIPS; Sep 29, 2014 at 5:35 PM.
     
     
  #6166  
Old Posted Sep 29, 2014, 5:52 AM
Tetsuo Tetsuo is offline
Registered User
 
Join Date: Oct 2013
Posts: 1,382
BC Hydro owned the ROW ^^^
     
     
  #6167  
Old Posted Sep 29, 2014, 6:06 AM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,047
Quote:
Originally Posted by urbancanadian View Post
According to Frances Bula, it sounds like the engineering department essentially has stacks of documents to prove that burying the line is indeed necessary. Remember, there have been a zillion studies undertaken by the city over the last 20+ years, with regards to rapid transit through the corridor.

Here's my take:

I think everyone can agree that the line needs to be extended from the current terminus at VCC-Clark. Building otherwise would necessitate extra transfers, and therefore attract lower ridership, resulting in a higher cost per passenger. Of course this would also mean building a new OMC, etc. So let's assume that option is a no-go.

The first section (VCC-Great Northern Way) is the easiest and wouldn't need to change since it is elevated, and already has a ROW reserved. The next section (GNW-Mount Pleasant) would need to be tunnelled since the change in elevation is far too steep due to the escarpment.

Mount Pleasant Station would still need to be underground since the climb from below grade to above street level would probably also be too steep since the station itself needs to be flat/level.

Of course there is the issue of where to put the elevated guideway and how to construct it.

Do you put it in a laneway or along a street (ie. Broadway or 10th)? The alley on the south side of Broadway is obviously very narrow and would require significant demolition in order to fit the guideway in some areas. For example, large chunks of the buildings at Broadway and Granville would need to be knocked down. Furthermore, the gantry crane required to build the guideway couldn't fit so you would need to demo even more or use a more expensive method as seen in some of the short elevated sections on the Evergreen Line. Then there would be the issue of station locations (below). The alley on the north side of Broadway doesn't even exist for the entire route and would require the demolition of several towers in addition to the constraints listed above.

What about 10th Avenue? There are so many issues with a guideway here. For instance, there isn't even enough space everywhere for cars to pass each other (the street is basically 3 lanes wide). This would mean eliminating most parking and likely making the street one-way for much of it. This is also one of the busiest bike routes in the city - due to to be significantly upgraded (AAA). Also, thousands of fully matured trees would be chopped down, far more than during Canada Line construction. The tree canopy is actually very dense here.

To add to all this, the plethora of affordable rental buildings along the corridor would likely be the hardest hit by the huge amount of demolition, which by the way would require MAJOR expropriation, at a huge expense.

To me, the only place where the guideway could reasonably be located would be along Broadway itself. The problem though, is the chaos that would ensue from building a line along a road far busier than Cambie. The street cannot be widened a-la North Road, so two lanes at a bare minimum would need to be removed during construction. And two lanes would likely be closed permanently. Parking would be permanantly removed as well as many turning movements. The #99 would need to be rerouted. Likely the #9 as well. Other routes that use the street (#14, 16, 17) would be affected. This would mean much long walks for passengers among other issues...
And of course traffic issues would come at a large cost to the economy.

Now comes the toughest part of it all - the stations:
Every station would need to be located high above the street because you would need Brentwood-style mezzanine levels below the tracks/platforms themselves. This is extremely expensive and just about as ugly as it gets-but looks are not the issue here. You would end up with massive monolithic stations forever shadowing some of the busiest - and best - parts of the city.
Stations are quite wide too... Think of each track being more than one lane wide, plus platforms and you have a station that is easily 6 lanes wide. Basically, while you could probably squeeze them in, the stations would be fronting right up against the buildings on either side of the road. And remember these are not Canada Line-sized stations; they will be up to - and sometime more than - a block-long structure.

Conceivably, you could build streetside stations in some locations, in order to avoid building large mazzanine levels. But this would require expropriating and bulldozing entire blocks of land adjacent to the major cross-streets. The only spot where I think you could do this at a reasonable price, would be at the Kingsgate Mall site - but then you run into the challenges noted way above (geez this is getting long, sorry). Of course this would also require a guideway that zig-zags in and out of the street since it could not continue straight.

I could go on and on, and still wouldn't touch the smaller issues such as viewcone infringements, lawsuits, noise issues, etc, etc.

Maybe another day or when this topic comes up again, as it inevitably will.
Thank you for that positive reinforcement on that issue!
     
     
  #6168  
Old Posted Sep 29, 2014, 6:59 AM
Zassk Zassk is offline
Registered User
 
Join Date: Sep 2009
Posts: 2,303
If the line can be elevated west of Main, why not build it on 8th? I know 8th has a sewer or something underneath which prevents tunnelling, but I would think that an elevated line could be built alongside any such underground utility.

Having it elevated on 8th would give a similar access advantage that has been quoted about burying the line on 10th - i.e. ease of access from Broadway, since an elevated line on 8th would be almost level with the Broadway street level.

Building it on 8th would also have the advantage of putting the line closer to the additional ridership of the 4th Avenue corridor.
     
     
  #6169  
Old Posted Sep 29, 2014, 7:02 AM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
I'd rather the line be right on Broadway. Even just a one minute walk will seem pointless when the street is right there. I wouldn't want the Broadway subway to be like the one on Bloor Street.
     
     
  #6170  
Old Posted Sep 29, 2014, 3:04 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,616
I think any road other than Broadway is simply too narrow to have the structure above ground. You'd be building parts of it over peoples' yards.
     
     
  #6171  
Old Posted Sep 29, 2014, 3:18 PM
VanCvl VanCvl is offline
Registered User
 
Join Date: Mar 2009
Posts: 99
The amount of vehicles using Broadway after SkyTrain is installed would be greatly reduced not to mention the number of buses so it's a terrible argument to say that COV needs to maintain that lane capacity. Cambie had a huge reduction in vehicle and bus use after the Canada Line.

I think where the argument is really going is not whether it will be tunnel or elevated but rather bored or cut-and-cover. Having constructed the Cambie cut-and-cover I know how difficult it was with all the utilities (especially the underground Hydro transmission line and Metro Vancouver watermain down Cambie).

The nice thing about Broadway is that there is actually very few large utilities to impeded cut-and-cover construction!!! It's going to be a huge fight with the businesses for the perception of construction impacts.
     
     
  #6172  
Old Posted Sep 29, 2014, 4:29 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by VanCvl View Post
The amount of vehicles using Broadway after SkyTrain is installed would be greatly reduced not to mention the number of buses so it's a terrible argument to say that COV needs to maintain that lane capacity. Cambie had a huge reduction in vehicle and bus use after the Canada Line.
Cambie has never been as busy as Broadway. There are also many alternative North-South routes (Oak, Granville to the west and Main, Fraser, Knight and even Hwy 1 to the east).

Also, Cambie has never had the density that Broadway has. Not only do hundreds of thousands of people live along the Broadway Corridor, but it is also the largest employment area outside of Downtown.
     
     
  #6173  
Old Posted Sep 29, 2014, 7:27 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,616
Also, Cambie is still busy. Anybody who says otherwise isn't using it on a regular basis.
     
     
  #6174  
Old Posted Sep 29, 2014, 7:47 PM
VanCvl VanCvl is offline
Registered User
 
Join Date: Mar 2009
Posts: 99
Quote:
Originally Posted by Jebby View Post
Cambie has never been as busy as Broadway. There are also many alternative North-South routes (Oak, Granville to the west and Main, Fraser, Knight and even Hwy 1 to the east).

Also, Cambie has never had the density that Broadway has. Not only do hundreds of thousands of people live along the Broadway Corridor, but it is also the largest employment area outside of Downtown.
If vehicle capacity was really needed the City would eliminate all the on-street parking besides during peak hours. How are you confusing density with the need for traffic lanes? The west end is more dense but has less travel lanes through it.


Best example of Broadway not needing lane capacity was in 2009 when a 4 lane temporary bridge across Cambie was installed during the cut-and-cover construction. Traffic was bad for a couple days then adjusted to using 4th, 12th, 16th, King Edward...

Regardless, my point was the line is probably going underground - the debate will be the method; cut and cover or bored.
     
     
  #6175  
Old Posted Sep 29, 2014, 8:25 PM
theKB theKB is offline
Registered User
 
Join Date: Jul 2010
Posts: 923
Quote:
Originally Posted by VanCvl View Post
If vehicle capacity was really needed the City would eliminate all the on-street parking besides during peak hours. How are you confusing density with the need for traffic lanes? The west end is more dense but has less travel lanes through it.


Best example of Broadway not needing lane capacity was in 2009 when a 4 lane temporary bridge across Cambie was installed during the cut-and-cover construction. Traffic was bad for a couple days then adjusted to using 4th, 12th, 16th, King Edward...

Regardless, my point was the line is probably going underground - the debate will be the method; cut and cover or bored.
Don't forget when the bridge was installed it killed parking on both sides of the street for a very long term that did some significant damage to the area.

I don't understand why there is parking allowed on cambie during rush hour.

And to be frank the only option is boring for broadway unless they decide to run the line under 8th ave even then the city OK'ing a multitude of big box retailers at the 8th and cambie I am sure would not be pleased having their streets torn up around that area to facilitate a cut and cover for months on end.
     
     
  #6176  
Old Posted Sep 29, 2014, 10:08 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,663
Quote:
Originally Posted by aberdeen5698 View Post
Well then you've got to ask why some parts of the city are worth the expense of tunneling and other parts (i.e., the original Expo line) aren't.

IMHO if the residents of Cambie insisted on a buried line then the incremental cost should have been recovered through their property taxes. With that big median there was absolutely no technical reason why it couldn't have been elevated.

If there are technical reasons why Broadway needs to be buried, then that's fine. But if we're burying it just to appease property owners then let them bear the expense.

Gosh, did I really say that?
That's exactly why the SkyTrain runs down the alley from Commercial - Broadway Station to Nanaimo as elevated and not underground
- because the City refused to pay the incremental increase in cost to bury it, so the Province built it elevated,
which angered the local residents, and that's why there hasn't been significant redevelopment at that station ever since (until now).

The incremental additional cost to underground was $14 million - see below.

http://former.vancouver.ca/commsvcs/guidelines/B020.pdf


http://former.vancouver.ca/commsvcs/guidelines/B020.pdf


http://former.vancouver.ca/commsvcs/guidelines/B020.pdf


http://former.vancouver.ca/commsvcs/guidelines/B020.pdf

Last edited by officedweller; Sep 29, 2014 at 10:43 PM.
     
     
  #6177  
Old Posted Sep 29, 2014, 10:24 PM
GMasterAres GMasterAres is offline
Registered User
 
Join Date: Oct 2007
Location: Hamburg
Posts: 3,122
You know now that I look at the map a bit more closely, I don't have a huge issue with the line being entirely underground. I mean you pretty much will have to underground it I think to Blanca given the width of the roads.

You could possibly just at-grade the line along Chancellor Blvd until you hit UBC then elevate there if you want some reduction in cost, but it isn't a huge distance and underground you could probably cut straight under the golf course.

Honestly without seeing a plan, I could see UBC needing a few stations given its size.

I don't know. I do think the Broadway stretch should be (1) along Broadway and (2) underground. It just makes sense. Elevated back in the day made sense because of cost and density at the time. It was also the only way to really get the SkyTrain grade-separated. Many seem to forget when SkyTrain was built, Metro-Vancouver had 1 million less people and Burnaby as a whole had a population of just around 150,000 total which is probably the population of the Broadway corridor itself today.
     
     
  #6178  
Old Posted Sep 29, 2014, 11:05 PM
memememe76 memememe76 is offline
Registered User
 
Join Date: Aug 2011
Posts: 842
Quote:
i also don't get why people love the elevated lines for the view. since when are public transit systems built to give tourists a view of mountains, or in some parts, really crappy areas of the city.
As if no poster ever mentions how "grotesque" elevated lines can be. I mean, really--grotesque?

I have no opinion on things like costs, traffic controls, etc. But I do have an opinion on the looks of elevated lines. I really like them. All of my favourite Skytrain stations are elevated.
     
     
  #6179  
Old Posted Sep 29, 2014, 11:17 PM
GlassCity's Avatar
GlassCity GlassCity is offline
Rational urbanist
 
Join Date: Aug 2012
Location: Metro Vancouver
Posts: 5,270
I don't think there's much of a debate about bored or cut-and-cover. After the debacle that was the Canada Line, there's no way we'll ever cut-and-cover a major street again.
     
     
  #6180  
Old Posted Sep 29, 2014, 11:50 PM
Caliplanner Caliplanner is offline
Registered User
 
Join Date: Mar 2014
Posts: 92
GlassCity, the efficacy of employing cut and cover technology versus boring is in part a function of geology/topography (and of course, economics/politics)!

Last edited by Caliplanner; Sep 30, 2014 at 7:26 AM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:17 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.