  #7121  
Old Posted Aug 28, 2014, 5:59 AM
aberdeen5698's Avatar
aberdeen5698 aberdeen5698 is offline
Registered User
 
Join Date: May 2010
Posts: 4,806
Quote:
Originally Posted by red-paladin View Post
Does anyone know when the Evergreen Line related upgrades to Commercial Broadway will start construction?
As far as I know there is no causal link between plans for the Evergreen Line and the Broadway station upgrades. I'm not even convinced that the Broadway upgrade will be started by the time the Evergreen line opens. Which means it's going to be a real gong show at Broadway during construction. The one saving grace is that most of the construction will be a brand new platform and overpass on the east side of the station which won't interfere with the expected high volume of traffic using the existing platform and overpass.
     
     
  #7122  
Old Posted Aug 28, 2014, 6:16 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,032
I thought the two were directly linked and the funding for the Evergreen line actually includes the C/B station upgrade as a package deal.
     
     
  #7123  
Old Posted Aug 28, 2014, 6:33 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Broadway station phase 2 construction will take place between early 2015 and summer 2016. It will need to be completed in time for the Evergreen line open to handle the additional passenger volume.
Also since funding is partially provided by Federal Government's Building Canada Fund, all Expo line stations upgrade need to be completed by 2016.

Last edited by Waders; Aug 28, 2014 at 6:48 AM.
     
     
  #7124  
Old Posted Aug 28, 2014, 7:08 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,032
Really?? When will Metrotown start them?
     
     
  #7125  
Old Posted Aug 28, 2014, 7:48 AM
urbancanadian urbancanadian is offline
Registered User
 
Join Date: Aug 2014
Location: Vancouver
Posts: 713
1710 East Broadway (Commercial-Broadway) is scheduled for the DPB meeting September 8.

Link to the minutes from the July 16 UDP meeting:
http://vancouver.ca/files/cov/committees/minutes-urban-design-panel-20140716.pdf
     
     
  #7126  
Old Posted Aug 28, 2014, 8:52 AM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Quote:
Originally Posted by Waders View Post
Broadway station phase 2 construction will take place between early 2015 and summer 2016. It will need to be completed in time for the Evergreen line open to handle the additional passenger volume.
Also since funding is partially provided by Federal Government's Building Canada Fund, all Expo line stations upgrade need to be completed by 2016.
Maybe I'm just forgetting but what exactly is the deal with the 2016 deadline for projects under the Building Canada Fund?

I vaguely recall even the Evergreen Line falls under this...was this something passed on at parliament shortly after the 2008 economic crisis (i.e. stimulating the economy via large goverment projects)?
     
     
  #7127  
Old Posted Aug 28, 2014, 1:39 PM
Jebby's Avatar
Jebby Jebby is offline
........
 
Join Date: Dec 2010
Location: Mexico City
Posts: 3,330
Quote:
Originally Posted by queetz@home View Post
Interlining isn't a big deal tbh, and it has been done at many cities around the world, often with much more extensive coverage. A very good example is San Francisco's BART.
Yes, but BART has extremely low frequencies outside the main part of the line, 15 minutes during the week and 20 minutes on weekends.

And when the lines are interlined, they're all going the same direction, totally different situation from having the M-Line interlined with two separate lines which run at completely different frequencies.
     
     
  #7128  
Old Posted Aug 28, 2014, 5:21 PM
SFUVancouver's Avatar
SFUVancouver SFUVancouver is offline
Registered User
 
Join Date: Dec 2006
Location: Hamilton
Posts: 6,731
I like the "Break at CO" option. It simplifies trip planning for passengers on both main lines and it would almost double frequency/service to Surrey, which is desperately needed during rush hour. Also, after having lived with the Canada Line and it's low level of interlined service late night to Richmond, I am now pretty solidly opposed to interlining. I know, first world transit problems, but it's still very frustrating to just miss a train to Richmond and have to wait nearly 20 minutes for the next train. That's simply unacceptable frequency for a rapid transit line.
     
     
  #7129  
Old Posted Aug 28, 2014, 10:06 PM
mr.A mr.A is offline
Registered User
 
Join Date: Apr 2009
Posts: 134
Does anyone know when the Evergreen Line related upgrades to Commercial Broadway will start construction? I know this is more related to the Station upgrade thread, but the reason I am asking in here is, it doesn't seem they have very much time to have Commercial Broadway complete by the opening day of the Evergreen Line does it?
Reply With Quote

The work has started on the 10th ave side of Safeway.
     
     
  #7130  
Old Posted Aug 29, 2014, 12:36 AM
jsbertram jsbertram is offline
Registered User
 
Join Date: Sep 2009
Posts: 3,245
Quote:
Originally Posted by SFUVancouver View Post
I like the "Break at CO" option. It simplifies trip planning for passengers on both main lines and it would almost double frequency/service to Surrey, which is desperately needed during rush hour. Also, after having lived with the Canada Line and it's low level of interlined service late night to Richmond, I am now pretty solidly opposed to interlining. I know, first world transit problems, but it's still very frustrating to just miss a train to Richmond and have to wait nearly 20 minutes for the next train. That's simply unacceptable frequency for a rapid transit line.
The horror!

A train every ten minutes after the evening rush is over, but ONLY half of them are useful to you. Many people would say 3 trains per hour in the evening is something they dream of having.


BTW: these are not 'interlined' trains on the Canada Line, but a single transit line that has two Richmond terminals.

Interlined is how Expo trains from Waterfront - King George and Millen-vergreen trains from VCC to Waterfront work right now, where the trains on these two lines merge /diverge at Columbia. The difference is that if necessary, Millen-vergreen trains can operate independently on their line between VCC and Braid (no merge /diverge at Columbia with Expo trains) and most people wouldn't notice.

Try to run Canada Line with the No.3 Road segment separated from the rest of the line, and people will notice.
     
     
  #7131  
Old Posted Aug 29, 2014, 3:03 AM
Waders Waders is offline
Registered User
 
Join Date: May 2009
Posts: 1,361
Quote:
Originally Posted by Metro-One View Post
Really?? When will Metrotown start them?
Same timeline. It now looks a bit behind schedule as the Burnaby city public hearing just finished early this month and there was some uncertainty about the new bus loop location.

Quote:
Construction is scheduled to begin in 2014 and is expected to be complete in 2016.
Source

I believe pre-construction preparation work has started. Outside the east station house, I can see some orange paint survey marks on the ground and even on tree branch that seems to map out the location of expanded entrance. It is a bit sad to see some of the flower trees that might need to be removed.
     
     
  #7132  
Old Posted Aug 29, 2014, 5:33 AM
finalcoolman finalcoolman is offline
Registered User
 
Join Date: Nov 2004
Posts: 262
What about the New Westminster station renovations to fully integrate it with Plaza 88. I recall reading in the RFP for it that it was supposed to begin in July 2014.
     
     
  #7133  
Old Posted Aug 29, 2014, 6:42 AM
adrianroam95 adrianroam95 is offline
Registered User
 
Join Date: Aug 2010
Location: Coquitlam, BC
Posts: 216
August 28th North Road update:

They're currently in the process of improving Clarke Road from North Road to Como Lake Avenue: constructing new median islands, adding new sidewalks, installing new traffic signals at Clarke Road and Como Lake Avenue, and widening Clarke Road at Como Lake Avenue to facilitate new left turn bays and a new right turn lane from southbound Clarke onto westbound Como Lake. Burquitlam is about to look a lot better.

They've started erecting the platform shelter at Burquitlam Station:


North Road looking south. Guideway construction has reached the column directly to the left of me (just out of the picture) as you will soon see:


Across from the McDonalds:


A few snaps of the infamous curve at Lougheed:


Over White Spot:


Hopefully it won't be too loud when trains start traversing the curve, or else it'd be pretty unpleasant for diners underneath.


The other side. Notice the infamous grade differential between the tracks.


Lougheed bus loop:


Still looks a little awkward to me.


Back on North Road and Gatineau Avenue looking north. As you can see there are five column segments to go until the guideway meets up with the steel beams.


North Road at Austin Avenue looking north.


     
     
  #7134  
Old Posted Aug 29, 2014, 7:33 AM
Metro-One's Avatar
Metro-One Metro-One is offline
Registered User
 
Join Date: Sep 2008
Location: Japan
Posts: 18,032
Great update, thanks.

I like the curve section, adds a little visual interest to the guideway.

I guess soon the North Road section superstructure will be complete.

Also I hope North Road gets a little more TLC and is completely re-paved. Looked a little rough in a couple of those shots.
     
     
  #7135  
Old Posted Aug 29, 2014, 1:42 PM
WarrenC12's Avatar
WarrenC12 WarrenC12 is offline
Registered User
 
Join Date: May 2007
Location: East OV!
Posts: 24,734
As long as the train doesn't squeel around that corner, I think White Spot diners will be ok.
     
     
  #7136  
Old Posted Aug 29, 2014, 6:32 PM
VancouverOfTheFuture's Avatar
VancouverOfTheFuture VancouverOfTheFuture is offline
Registered User
 
Join Date: Apr 2014
Posts: 3,481
i really think the basket-weave would have looked pretty cool. in the long run it may have been a good idea to do it since there seems to be a lot of switching going on around that part. it could cause a lot of wear as time goes on. but that steal curved part does look pretty sleek.
     
     
  #7137  
Old Posted Aug 29, 2014, 6:54 PM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Nice! Thanks for the pics adrianroam95! Beautiful as usual.

It looks like the gantry will be above Austin by the end of next week, and should connect above Gatineau Place three weeks from now. So it looks like EGRT is bang on when they say it will be done "late September".

The Lougheed steel guideways are looking pretty good as well. They are indeed quite sleek!
     
     
  #7138  
Old Posted Aug 29, 2014, 6:56 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
Nice update.
The curve looks good because they painted the steel a colour that matches the concrete really well.
It' looks uniform now.

****

Here's what's planned for the median (and which would prevent Rob Ford-esque jaywalking incidents)
- assuming it was approved:

Quote:
Originally Posted by GeeCee View Post
Article in the Burnaby NewsLeader was just published yesterday about greening the median under the guideway along North Road:

http://www.burnabynewsleader.com/news/175323271.html
Quote:

An artist's rendering of what the median underneath the Evergreen Line will look like on North Road,
if Burnaby and Coquitlam agree to chip in $500,000 each.
— image credit: City of Coquitlam
     
     
  #7139  
Old Posted Aug 30, 2014, 12:25 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,814
From the webcam today -
looks like there are 2 T-shaped columns (for a switch platform?) south of Lincoln Station:


http://wcs.pbaeng.com/projects/R1_Transit
     
     
  #7140  
Old Posted Aug 30, 2014, 2:48 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 770
Quote:
Originally Posted by officedweller View Post
From the webcam today -
looks like there are 2 T-shaped columns (for a switch platform?) south of Lincoln Station:
Interesting... there's no switch there, but there's also no T-shaped columns in the diagrams from http://evergreenline.gov.bc.ca/documents/Maps_Graphics/CoquitlamPinetreeAlignment.pdf
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 3:43 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.