HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan


Closed Thread

 
Thread Tools Display Modes
     
     
  #1201  
Old Posted Aug 27, 2014, 4:04 PM
Treesplease Treesplease is offline
Registered User
 
Join Date: Jul 2011
Posts: 990
Quote:
Originally Posted by Draftsman View Post
Why would anyone hire a contractor with 'tilt' in their name? (Tilt-Tech) It just doesn't sound like they are on the level!
Good one.
     
     
  #1202  
Old Posted Aug 27, 2014, 4:10 PM
HomeInMyShoes's Avatar
HomeInMyShoes HomeInMyShoes is offline
arf
 
Join Date: May 2005
Location: File 13
Posts: 14,625
Quote:
Originally Posted by Stormer View Post
There has been a lot of this lately. Out of town contractors bidding low and later realizing that construction costs here, especially labour, are far higher than they thought.
Or that labout might even be impossible to find in a timely manner. If they are thinking they are finding local people it is a pretty tight labour market for some of the trades.
__________________

-- “We heal each other with kindness, gentleness and respect.” -- Richard Wagamese
-- “Unless someone like you cares a whole awful lot, Nothing is going to get better. It's not.” -- Dr. Seuss
     
     
  #1203  
Old Posted Aug 28, 2014, 2:58 AM
TannerF TannerF is offline
Registered User
 
Join Date: Nov 2013
Posts: 117
I have been told the Albert Park Medical clinic in the Gold Square has shut down. Is the Gold Square clearing out tenants to go with the Superstore at Goldenmile?
     
     
  #1204  
Old Posted Aug 28, 2014, 3:57 AM
BrannyMuffin BrannyMuffin is offline
Registered User
 
Join Date: Aug 2006
Location: Regina
Posts: 970
Quote:
Originally Posted by TannerF View Post
I have been told the Albert Park Medical clinic in the Gold Square has shut down. Is the Gold Square clearing out tenants to go with the Superstore at Goldenmile?
That clinic has been closed for awhile. The clinic that's there now (Albert & Parliament Primary Health Care) is planned to be a combination of family physicians, urgent care, and specialty clinics. It's been there for awhile but they're undergoing renovations and changes in hours and services.

http://ap-phc.com/
     
     
  #1205  
Old Posted Aug 28, 2014, 3:55 PM
Drofmab's Avatar
Drofmab Drofmab is offline
Registered User
 
Join Date: Aug 2008
Location: Regina
Posts: 1,063
Quote:
Originally Posted by BrannyMuffin View Post
That clinic has been closed for awhile. The clinic that's there now (Albert & Parliament Primary Health Care) is planned to be a combination of family physicians, urgent care, and specialty clinics. It's been there for awhile but they're undergoing renovations and changes in hours and services.

http://ap-phc.com/
The original clinic actually moved to 4th & McIntosh.
(now called Transcona Medical Clinic)
__________________
@drofmab
     
     
  #1206  
Old Posted Aug 28, 2014, 6:05 PM
UnivParkGuy UnivParkGuy is offline
Registered User
 
Join Date: Aug 2014
Posts: 1
Quote:
Originally Posted by Stormer View Post
There has been a lot of this lately. Out of town contractors bidding low and later realizing that construction costs here, especially labour, are far higher than they thought.
Not just contractors. A primary reason Loblaws now directly runs their GTH warehouse is that Canadian Logistics Services completely mismanaged the labour. They behaved as if they were doing Reginans a favour & they expected that simply paying OK wages (still lower than going rate) would be enough. For example, they initially refused to consider how their employees would get to the GTH - they insisted that this was the employees' issue, not theirs. In a normal labour market, yes... but when you're fighting for even low-skill labour (let alone the skidsteer drivers they needed), you need to make yourself desirable.

Even once CLS caved & started running the white school bus shuttles, I heard many stories of CLS employees being dismissed for arriving late for their shifts... despite the fact the CLS bus was off-schedule & arrived late. Other ridiculous dismissal stories abound.

Making things even more bizarre, some of these folks would show up at CLS "job fairs" (which they ran every month or so at the provinical government job office, because turnover was huge) & get rehired. Left hand didn't know what the right was doing.

Loblaws eventually stepped in, terminated CLS' contract (for cause) & assumed all employment-related responsibilities (wages, union contracts, etc).
     
     
  #1207  
Old Posted Aug 28, 2014, 6:18 PM
Migs Migs is offline
BANNED
 
Join Date: Dec 2006
Location: Regina, Sk, Canada
Posts: 3,774
First tower crane is on it's way up.

https://twitter.com/yqrstadium/status/505056602454773761
     
     
  #1208  
Old Posted Aug 29, 2014, 12:09 AM
skphc08's Avatar
skphc08 skphc08 is offline
Registered User
 
Join Date: Jun 2008
Location: South Central
Posts: 238
Quote:
Originally Posted by UnivParkGuy View Post
Not just contractors. A primary reason Loblaws now directly runs their GTH warehouse is that Canadian Logistics Services completely mismanaged the labour. They behaved as if they were doing Reginans a favour & they expected that simply paying OK wages (still lower than going rate) would be enough. For example, they initially refused to consider how their employees would get to the GTH - they insisted that this was the employees' issue, not theirs. In a normal labour market, yes... but when you're fighting for even low-skill labour (let alone the skidsteer drivers they needed), you need to make yourself desirable.

Even once CLS caved & started running the white school bus shuttles, I heard many stories of CLS employees being dismissed for arriving late for their shifts... despite the fact the CLS bus was off-schedule & arrived late. Other ridiculous dismissal stories abound.

Making things even more bizarre, some of these folks would show up at CLS "job fairs" (which they ran every month or so at the provinical government job office, because turnover was huge) & get rehired. Left hand didn't know what the right was doing.

Loblaws eventually stepped in, terminated CLS' contract (for cause) & assumed all employment-related responsibilities (wages, union contracts, etc).
Interesting information and assessment.
__________________
Everything is real on this concrete and steel.
     
     
  #1209  
Old Posted Aug 29, 2014, 3:17 AM
kiwi4life kiwi4life is offline
Registered User
 
Join Date: Jun 2009
Location: saskatoon
Posts: 536
Ok so how many tower cranes does Regina have going right now?
     
     
  #1210  
Old Posted Aug 29, 2014, 4:03 AM
thefourthtower thefourthtower is offline
Registered User
 
Join Date: Jun 2010
Location: Rueannatta
Posts: 2,597
Quote:
Originally Posted by kiwi4life View Post
Ok so how many tower cranes does Regina have going right now?
Having tower cranes for five or six story structures is not considered a high rise , it's eight stories and up , this city has had eight or so towers in the past few years ten stories and more, quite remarkable , I'm not sure how many the other city had
     
     
  #1211  
Old Posted Aug 29, 2014, 4:03 AM
Nathan's Avatar
Nathan Nathan is offline
Hmm....
 
Join Date: Mar 2007
Location: Regina
Posts: 3,505
Quote:
Originally Posted by kiwi4life View Post
Ok so how many tower cranes does Regina have going right now?
I think 2 (Ag Place and the Legislature). The two University ones are down now I think, and the Stadium ones aren't completely up yet (although there will be 2 there in the near future, with a couple more later... I think).

If Capital Pointe gets going... that will add another 1 or 2, but who knows with that one.


That's all I can think of off the top of my head.
     
     
  #1212  
Old Posted Aug 29, 2014, 6:49 AM
SkydivePilot SkydivePilot is offline
Registered User
 
Join Date: Jun 2010
Location: REGINA
Posts: 2,295
Yep, by late fall, Regina will have 6 active tower cranes.
     
     
  #1213  
Old Posted Aug 29, 2014, 7:27 AM
UrbanClimate's Avatar
UrbanClimate UrbanClimate is offline
Registered User
 
Join Date: Sep 2011
Location: Toronto
Posts: 397
FCC tower

Quote:
Originally Posted by kiwi4life View Post
Ok so how many tower cranes does Regina have going right now?
Here's a shot of the crane at the FCC tower site, courtesy of CBC news.

     
     
  #1214  
Old Posted Aug 29, 2014, 10:11 PM
kiwi4life kiwi4life is offline
Registered User
 
Join Date: Jun 2009
Location: saskatoon
Posts: 536
ok thanks guys!
     
     
  #1215  
Old Posted Aug 30, 2014, 2:53 PM
thefourthtower thefourthtower is offline
Registered User
 
Join Date: Jun 2010
Location: Rueannatta
Posts: 2,597
Urban thank you for the photos , the snap shot shows how great downtown is
     
     
  #1216  
Old Posted Sep 1, 2014, 1:43 AM
Udon'tknow's Avatar
Udon'tknow Udon'tknow is offline
Registered User
 
Join Date: Oct 2011
Posts: 359
Quote:
Originally Posted by SkydivePilot View Post
Yep, by late fall, Regina will have 6 active tower cranes.
Here's another crane, albeit it one of those portable small ones:

[IMG][/IMG]
     
     
  #1217  
Old Posted Sep 1, 2014, 3:20 PM
UPP UPP is offline
Registered User
 
Join Date: Jan 2011
Location: Regina, Canada
Posts: 592
Where's that last photo from? Is this in Harbour Landing?
     
     
  #1218  
Old Posted Sep 1, 2014, 4:26 PM
Nathan's Avatar
Nathan Nathan is offline
Hmm....
 
Join Date: Mar 2007
Location: Regina
Posts: 3,505
Quote:
Originally Posted by UPP View Post
Where's that last photo from? Is this in Harbour Landing?
I think it might be... I saw a crane like that when I was driving down Lewvan this morning.



I'm guessing there might also be a mobile crane of some sort going up at the hotel site on Dewdney and Lewvan when construction gets rolling there? It's supposed to be 7-8 floors no? Or am I not remembering things correctly?
     
     
  #1219  
Old Posted Sep 2, 2014, 10:16 PM
Chorduroy's Avatar
Chorduroy Chorduroy is offline
Registered User
 
Join Date: Dec 2012
Location: YQR
Posts: 174
Quote:
Originally Posted by SkydivePilot View Post
Yep, by late fall, Regina will have 6 active tower cranes.
Can you just confirm the locations you're referring to?
     
     
  #1220  
Old Posted Sep 2, 2014, 11:14 PM
Draftsman Draftsman is offline
Registered User
 
Join Date: May 2011
Location: Regina, Saskatchewan
Posts: 989
Quote:
Originally Posted by Chorduroy View Post
Can you just confirm the locations you're referring to?
I believe the 6 tower cranes he is referring to are:
4 @ New Mosaic Stadium
1 @ Legislative building
1 @ Agriculture Place
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 6:41 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.