HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa


    re Hotel & Residences in the SkyscraperPage Database

• Building Data Page   • Ottawa Skyscraper Diagram

• Map Location

 

 
Thread Tools Display Modes
     
     
Prev Previous Post   Next Post Next
     
     
  #10  
Old Posted Aug 15, 2014, 3:06 AM
Fraser Fraser is offline
 
Join Date: Feb 2011
Posts: 86
I have it on good authority that the "move-in date" has been pushed to mid-2018 (from 2016) and because the hotel portion of the building has been dropped, all documents need to be re-drafted. Once that's complete, there will be a period where buyers can get out of their deal.
Reply With Quote
     
     
End
 
 
 

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Downtown & Urban Ottawa
Forum Jump



Forum Jump


All times are GMT. The time now is 7:19 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.