The Confederation Line is really a quasi-urban system, it still basically caters to the suburban demography. The best thing in it for the inner city is that it will clean out the bus crap out of downtown to make it more liveable. Hopefully this will open the way in the future for a real urban-focused strategy that actually serves inner city neighbourhoods.
     
     
  #1402  
Old Posted Aug 12, 2014, 7:02 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by JM1 View Post
Can someone explain why Ottawa went with low floor trams? If we have full grade separation and the platforms are being rebuilt anyway, wouldn't it have been better just to go with regular trains? I would understand if we planned on running street or surface LRT, but it doesn't sound like that is in the works.
It's because when the city did all the studying and planning that went into the Confederation Line, back in 2008/2009ish, the plan was to a bunch of trams in the suburbs all interlining as a metro in the trunk from Lincoln Fields to Blair. The tech we have now is just a holdover from that earlier vision.

One thing that using tram vehicles lets us do is it keeps open the option of at-grade extensions in the future.
     
     
  #1403  
Old Posted Aug 12, 2014, 7:04 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by Kitchissippi View Post
The Confederation Line is really a quasi-urban system, it still basically caters to the suburban demography. The best thing in it for the inner city is that it will clean out the bus crap out of downtown to make it more liveable. Hopefully this will open the way in the future for a real urban-focused strategy that actually serves inner city neighbourhoods.
Yes, the entire LRT plan, both phases 1 & 2, is catered for the suburbs but it will nonetheless be quite a useful piece of infrastructure for inner city residents too. My work & my soon-to-be-home are both within the pre-war city and yet my commute will be entirely by rail come 2018 assuming I have the same commute then.
     
     
  #1404  
Old Posted Aug 12, 2014, 7:36 PM
JM1 JM1 is offline
Registered User
 
Join Date: Feb 2012
Posts: 460
Thanks for this answer. I guess if the low floors are not more expensive and the operating/maintenance costs are the same, it doesn't matter much to me whether we use low floor or high floor (although high floors feels roomier without the bogie protrusions).

Regarding the advantages of low floor, I see the argument about the suburbs, burt for me, the key advantage of these trams is wasted in a tunnel or on a segregated ROW. In Europe, low floor trams allow you to step out, go to a shop, pick something up, and step right back onto another tram, all without parking a car, getting into or out of the car, etc.... They invite you to visit the high street without a car. If properly situated, they facilitate life over private vehicles. It is far easier to board a low-floor tram with a dog, a stroller, a bicycle, or a wheelchair than it is to get into a car with one of the above. Of course, much of this advantage is lost if the low floor tram is operated in a tunnel or on a segregated ROW where one must navigate elevators, tunnels, platforms, etc. between the shops and the tram. Then the advantage over private vehicles is lost.

Quote:
Originally Posted by 1overcosc View Post
It's because when the city did all the studying and planning that went into the Confederation Line, back in 2008/2009ish, the plan was to a bunch of trams in the suburbs all interlining as a metro in the trunk from Lincoln Fields to Blair. The tech we have now is just a holdover from that earlier vision.

One thing that using tram vehicles lets us do is it keeps open the option of at-grade extensions in the future.
     
     
  #1405  
Old Posted Aug 12, 2014, 8:38 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is online now
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,686
The sad thing about the low-floor trains in our case is that it usually makes it tempting (and feasible) to cross the tracks, which is why most of the stations have ugly barriers designed in to prevent people from doing so. I think this makes the stations feel more cramped, and it's unfortunate that the underground stations are not centre platform as was proposed in the pre-bidding renderings. I'm also disappointed that Hurdman and Bayview aren't centre platform as I think they work better as exchange stations.
     
     
  #1406  
Old Posted Aug 12, 2014, 9:21 PM
MalcolmTucker MalcolmTucker is online now
Registered User
 
Join Date: May 2007
Posts: 11,601
Until there is interlining, there will be no reason to switch platforms at track level, so beyond phase 2 no? Or is the split to Algonquin in phase 2?
     
     
  #1407  
Old Posted Aug 12, 2014, 10:07 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
It's also worth pointing out that low-floor trams means lower-ceiling tunnels which means lower-cost as well.

I would have thought that they would take advantage of the tech's surface-running ability in the suburbs, but Phase 2 has made me doubt that. Now I figure that if surface LRT were ever to come about, it would be on its own lines (Carling, St.Laurent, etc.) as opposed to interlining in the Confederation line.

Quote:
Originally Posted by JM1 View Post
Imagine Bank (billings Bridge to Wellington), or Richmod/Wellington (Bayview to Churchill) or Montreal Road (from Sussex to St Laurent) as pedestrianized tram and bicycle streets. Can't imagine it? Neither could the Europeans in the 1970's.
I would absolutely love that. At the very least, if they were to tunnel under these streets, a much larger portion of the road should be dedicated to pedestrians (think two 9-foot, curbless lanes).
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
  #1408  
Old Posted Aug 12, 2014, 11:03 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Lincoln Fields better have a good platform design for transferring.
     
     
  #1409  
Old Posted Aug 12, 2014, 11:25 PM
eemy's Avatar
eemy eemy is offline
Closed account
 
Join Date: Aug 2006
Posts: 4,425
Even if they only used surface operations on a hypothetical Carling/Rideau route, at least they would benefit from being able to use a common vehicle between the lines.
     
     
  #1410  
Old Posted Aug 12, 2014, 11:56 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Quote:
Originally Posted by 1overcosc View Post
Lincoln Fields better have a good platform design for transferring.
Will there be transferring? I thought the frequency would just be split between Bayshore and Baseline.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
  #1411  
Old Posted Aug 13, 2014, 12:27 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is online now
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,686
Quote:
Originally Posted by Aylmer View Post
It's also worth pointing out that low-floor trams means lower-ceiling tunnels which means lower-cost as well.
Doesn't the overhead wire negate that though? Looking at the photos of the excavated tunnel, the ceiling doesn't seem any lower than any metro I've seen. The road headers are definitely more efficient than a TBM, as the bottom of the tunnel is already flat
     
     
  #1412  
Old Posted Aug 13, 2014, 12:29 AM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,861
Quote:
Originally Posted by 1overcosc View Post
It's interesting how the city will react if federal funding comes up short. The Orleans extension is the least needed/useful of Phase 2, but it's also the most politically precious one. At an absolute minimum, though, Tunneys-Lincoln Fields has to be built. If push comes to shove the city could finance that one all on its own (it would cost ~$750M or so--the whole way to Baseline at ~980M).
Orleans is also probably the easiest to build - city owns the 174 ROW, no debate with the NCC, no disagreement on where the route should go, plus it provides a political incentive for both the federal Tories and provincial Liberals to pony up (each winning Orleans by a smallish margin). It allows Wynne to put up the mission accomplished banner on her promise to fund the "next phase" of Ottawa LRT from the massively oversubscribed 1.4B/y non-GTA transportation fund.
     
     
  #1413  
Old Posted Aug 13, 2014, 1:43 AM
milomilo milomilo is offline
Registered User
 
Join Date: Dec 2013
Location: Calgary
Posts: 10,498
Quote:
Originally Posted by Kitchissippi View Post
Doesn't the overhead wire negate that though? Looking at the photos of the excavated tunnel, the ceiling doesn't seem any lower than any metro I've seen. The road headers are definitely more efficient than a TBM, as the bottom of the tunnel is already flat
An overhead wire would still be there with a high level train though, but there is likely to be more stuff mounted on the roof of a low floor train that they couldn't fit elsewhere, such as the A/C units so you're right that there isn't likely to be much difference.
     
     
  #1414  
Old Posted Aug 13, 2014, 2:03 AM
Norman Bates Norman Bates is offline
Living With My Mother
 
Join Date: Feb 2009
Posts: 1,027
Where is the excelsior going?
     
     
  #1415  
Old Posted Aug 13, 2014, 3:37 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by acottawa View Post
Orleans is also probably the easiest to build - city owns the 174 ROW, no debate with the NCC, no disagreement on where the route should go, plus it provides a political incentive for both the federal Tories and provincial Liberals to pony up (each winning Orleans by a smallish margin). It allows Wynne to put up the mission accomplished banner on her promise to fund the "next phase" of Ottawa LRT from the massively oversubscribed 1.4B/y non-GTA transportation fund.
Massively oversubscribed? There's not much committed from it. Aside from Ottawa's LRT, there's some money for an HSR to London--which won't cost much as the bulk of the capital costs are already committed as part of other projects--parts of the GO RER promise (the confirmed service to Kitchener, the likely service to Niagara, the maybe service to Barrie), a few hundred million to expand Kitchener's LRT, a billion or two to speed up northern highway work... and that's about it.

Now that's not to say the $29B commitment is a magical pill that funds everything. The $15B GTA fund is massively overcommitted. GO RER is sucking up almost everything, and when the DRL is thrown in there's not much for anything else. Wynne is dreaming when she says she can pay for RER, DRL, the Mississauga LRT, Durham BRT, the Hamilton LRT, and the Yonge subway to Steeles with $15B.

It's somewhat ironic that a fund whose raison d'etre is to solve the GTA's gridlock hell ends up with the GTA's needs only partially met and the government having to invent things to spend the non-GTHA fund on (like an HSR to London that no one asked for). But I digress.

The Orleans extension is easy, both technically and politically. Not only that but now that its been promised, it's politically impossible to remove. Orleans is a swing seat, for decades whoever wins it has done by a slim margin. Even in the last federal election when the Conservatives won huge in Ontario and the Liberals flopped to their third place ruin, Galipeau's lead over the Liberal challenger wasn't very big. But in this provincial election, Wynne becomes the LRT candidate, and... poof. She wins Ottawa-Orleans by a massive 10,000 vote margin bigger than the margin by which the PCs won the bulk of their rural strongholds.

But it's definitely least beneficial or useful of the three extension projects.

From the perspective of Orleans residents, LRT won't actually do much. It will only be marginally faster than the BRT link to Blair. And Blair is far enough east that it would make a decent transfer point for Orleans locals. In other words, transferring to/from your local bus at Place D'Orleans instead of Blair, while definitely nice, won't be that much of an improvement other than maybe a minute or two of saved travel time. Phase 1 provides a good deal already to Orleans given how quick it is to get to Blair.

Now, on the other side of the city, having all that funnel into Tunneys is just not fun. Bringing it to Lincoln Fields is a must, Baseline & Bayshore is a plus. When that's done, it will bring the west to roughly the same level that the east already has with Phase 1.

In the south, the O-Train extension to Leitrim & Bowesville is dirt cheap (much cheaper than even the Orleans extension), and it brings a great deal of service improvement to an area of the city that arguably has both the worst transit and least road capacity.

Last edited by 1overcosc; Aug 13, 2014 at 3:52 AM.
     
     
  #1416  
Old Posted Aug 13, 2014, 3:57 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by Aylmer View Post
Will there be transferring? I thought the frequency would just be split between Bayshore and Baseline.
Not for most as yes the line is evenly split between the two spurs. But to go from one spur to the other--for example to get from Baseline to Bayshore--you have to get off in Lincoln Fields and switch. For now, there's going to be a BRT link between the two nodes so there's not going to be many people doing that switch, but in the future when LRT is extended outwards from Bayshore & Baseline towards Kanata & Barrhaven that transfer is going to become more common.
     
     
  #1417  
Old Posted Aug 13, 2014, 4:21 AM
S-Man S-Man is offline
Registered User
 
Join Date: Mar 2011
Posts: 1,639
Quote:
It's interesting how the city will react if federal funding comes up short. The Orleans extension is the least needed/useful of Phase 2, but it's also the most politically precious one. At an absolute minimum, though, Tunneys-Lincoln Fields has to be built. If push comes to shove the city could finance that one all on its own (it would cost ~$750M or so--the whole way to Baseline at ~980M).
This thought crossed my mind, too - ie, what if funding happens in chunks? There will be a federal surplus to play with in the coming year, and votes to secure, so I consider the funding a likely thing.

In the event of a series of funding chunks, obviously the Baseline link needs to be done first and foremost. It's a big, busy hub, with a completely finished underground station.

Orleans loves its persecution complex, which is why it bleated for LRT to go there as well (I recall some ridiculous ridership numbers tossed around last year to back up the claim that Orleans is uber transit-friendly). Frankly, it is the least important at this point (though easy to pull off compared to the other lines).
     
     
  #1418  
Old Posted Aug 13, 2014, 4:25 AM
S-Man S-Man is offline
Registered User
 
Join Date: Mar 2011
Posts: 1,639
Oh, I'd also like to add....

HIGH SPEED RAIL TO LONDON??!!

     
     
  #1419  
Old Posted Aug 13, 2014, 11:21 AM
acottawa acottawa is offline
Registered User
 
Join Date: Aug 2009
Posts: 18,861
Quote:
Originally Posted by 1overcosc View Post
Massively oversubscribed? There's not much committed from it. Aside from Ottawa's LRT, there's some money for an HSR to London--which won't cost much as the bulk of the capital costs are already committed as part of other projects--parts of the GO RER promise (the confirmed service to Kitchener, the likely service to Niagara, the maybe service to Barrie), a few hundred million to expand Kitchener's LRT, a billion or two to speed up northern highway work... and that's about it.
You're only counting Metrolinx projects, the budget says "The Province would create two dedicated funds – one for the GTHA with up to $15 billion available for investment in transit and one for the rest of the province with nearly $14 billion available for investment in roads, bridges, transit and other critical infrastructure." [bold is mine]

and

"Priority projects outside the GTHA could include local and regional transit, roads and bridges, infrastructure development in the Ring of Fire, funding for bus and rail infrastructure delivered by the Ontario Northland Transportation Commission, strategic highway improvements and other projects to be identified through the Building Canada Plan negotiations with the federal government."

http://www.fin.gov.on.ca/en/budget/ontariobudgets/2014/bk2.html

So Ottawa phase 2 is getting in line, particularly if the "high speed rail" actually means high speed rail.
     
     
  #1420  
Old Posted Aug 13, 2014, 12:55 PM
Mikeed Mikeed is offline
Registered User
 
Join Date: Jun 2013
Posts: 377
Quote:
Originally Posted by S-Man View Post
Oh, I'd also like to add....

HIGH SPEED RAIL TO LONDON??!!

The key to that HSR project is that it connects the tech. hub of Kitchener-Waterloo to the global gateway that is the GTA- making it much more attractive for Ontario to court Google/FB to build campuses in Waterloo if it's only 60 mins from Pearson.

Developing that tech. hub is very important to the success of the Ontario econ. going forward.

More or less.

But there's still a lot of questions about this project.

Quote:
"We will likely amalgamate the Union-Pearson Express into the high-speed system because it would be a duplication otherwise, which is one of the other reasons it is less expensive," said Murray.
Quote:
"It will probably generate, over the next 10 to 15 years, over $2 billion. So we expect the net cost over the next 10 to 15 years would be about $500 million — at least, that's what the experts say," he said.
That seems to suggest they're thinking it will cost 2.5 billion.
__________________
Long time reader.
Seldom post.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 2:51 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.