  #101  
Old Posted Jun 16, 2013, 12:17 AM
NOWINYOW NOWINYOW is offline
Registered User
 
Join Date: Mar 2013
Location: Ottawa
Posts: 479
Is there a projected completion date set? Will this contractor work over the winter months?
Reply With Quote
     
     
  #102  
Old Posted Jun 27, 2013, 1:19 PM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,684
I was out cycling in the east end yesterday and snapped this photo of the progress on the Hunt Club overpass at Russell Road.

Reply With Quote
     
     
  #103  
Old Posted Jul 15, 2013, 1:59 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Was driving along the 417 yesterday and snapped this pic of the Hunt Club overpass. Sorry for the bad quality 1) my windshield is filthy, 2) i didn't hold the camera steady as I was focused on driving

Reply With Quote
     
     
  #104  
Old Posted Jul 15, 2013, 2:34 AM
rocketphish's Avatar
rocketphish rocketphish is offline
Planet Ottawa and beyond
 
Join Date: Feb 2009
Location: Greater Ottawa
Posts: 14,614
Quote:
Originally Posted by 1overcosc View Post
Sorry for the bad quality ... i didn't hold the camera steady as I was focused on driving
I guess we'll let it slide... this time.
Reply With Quote
     
     
  #105  
Old Posted Oct 8, 2013, 12:46 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Video Link


Walkley to just past Hunt Club on a rainy Sunday October 6, 2013
Reply With Quote
     
     
  #106  
Old Posted Jan 5, 2014, 5:36 AM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
http://ottawa.ca/en/ott-city-online/close-look-hunt-club-construction

blog update from the City - The Hunt Club project is proceeding on schedule and is expected to be complete by summer 2014!






Last edited by waterloowarrior; Jan 5, 2014 at 6:12 AM.
Reply With Quote
     
     
  #107  
Old Posted Jan 6, 2014, 3:15 PM
hwy418 hwy418 is offline
Registered User
 
Join Date: Jun 2013
Posts: 409
Great news. Can't wait to use this... badly needed!
Reply With Quote
     
     
  #108  
Old Posted May 10, 2014, 10:27 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
This one is really coming along. All the earth placement is completely done (although not soded yet), and the 417 westbound -> Hunt Club ramp is completely paved. Definitely on track for August opening, if not possibly sooner.
Reply With Quote
     
     
  #109  
Old Posted May 28, 2014, 9:05 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Today a bunch of trees were planted between the ramps. I'll try to get a picture tomorrow.
Reply With Quote
     
     
  #110  
Old Posted May 28, 2014, 9:13 PM
waterloowarrior's Avatar
waterloowarrior waterloowarrior is offline
National Capital Region
 
Join Date: Nov 2005
Location: Eastern Ontario
Posts: 9,254
Going to be really interesting to see how this interchange and the Stranherd-Armstrong Bridge change traffic patterns in the city.
Reply With Quote
     
     
  #111  
Old Posted Jun 5, 2014, 2:47 AM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Quote:
Originally Posted by waterloowarrior View Post
Going to be really interesting to see how this interchange and the Stranherd-Armstrong Bridge change traffic patterns in the city.
My thoughts:

This overpass will add a lot of counterpeak traffic to the 417. Lots of people from Orleans, the centre, and the west will be using the new Hunt Club exit to commute to places along Hunt Club, commutes which would be counterpeak. It will probably add with-peak traffic too as people from the Southgate area use this exit to get to the west end. It will likely remove a huge amount of traffic off Walkley, especially around the Russell/Walkley interchange, which should improve the speed & reliability of bus service in that area.

It may also change shopping patterns for people form the rural southeast. Currently a lot of those people shop in Orleans. The new Hunt Club exit may tip the balance in favour of South Keys for a lot of these people.
Reply With Quote
     
     
  #112  
Old Posted Jun 5, 2014, 3:21 AM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
Registered User
 
Join Date: Oct 2009
Posts: 189
The last few days they have started to grade and pave the ramps, which requires off-peak lane closures on the 417. Concrete guard rails are nearly complete on the main span, guard rails for the smaller spans are still being worked on. Foundations for signage and lighting have been poured.
Reply With Quote
     
     
  #113  
Old Posted Jun 5, 2014, 2:28 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
^ The ramps are already graded, though... and half of them are already paved. Unless you're talking about the segments immediately adjacent to Highway 417, of which there's still some paving necessary to connect them to the highway lanes.
Reply With Quote
     
     
  #114  
Old Posted Jul 9, 2014, 2:45 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
Main overpass structure is now completely finished. This one's going to open soon.

It's a race between this exit & the Strandherd-Armstrong bridge to be open first. Which one will win?

Both projects will be a big help to east-west travel in the south of the city.
Reply With Quote
     
     
  #115  
Old Posted Jul 9, 2014, 3:05 PM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
Registered User
 
Join Date: Oct 2009
Posts: 189
The Strandherd Armstrong bridge will be open first.

The completion date for the interchange is Fall 2014 on the signs, and as I've been seeing the progress of the construction on my daily commute, they are in no hurry to finish it. Although the big structures are nearly complete, there still is a lot to do. Lighting, guard rails, signage, concrete finishing, grading, paving. The EB Hunt Club to WB 417 ramp isn't even graded yet under the main span where it passes over the creek. I could see the EB417 to WB HC ramp opening before the others, which would provide some much needed relief to Walkley.
Reply With Quote
     
     
  #116  
Old Posted Jul 9, 2014, 4:58 PM
hwy418 hwy418 is offline
Registered User
 
Join Date: Jun 2013
Posts: 409
Quote:
Originally Posted by MaxHeadroom View Post
The Strandherd Armstrong bridge will be open first.

The completion date for the interchange is Fall 2014 on the signs, and as I've been seeing the progress of the construction on my daily commute, they are in no hurry to finish it. Although the big structures are nearly complete, there still is a lot to do. Lighting, guard rails, signage, concrete finishing, grading, paving. The EB Hunt Club to WB 417 ramp isn't even graded yet under the main span where it passes over the creek. I could see the EB417 to WB HC ramp opening before the others, which would provide some much needed relief to Walkley.
I believe it will be open before fall (the City's web site now says August). Also, there is pressure from the City (i.e. Councillor Deans) to complete the Hunt Club Noise Wall project from Hawthorne to Albion before they open the interchange.

One would think it would be desirable to have the Hunt Club interchange on 417 available during the rapid bridge replacements at Vanier/Riverside and at Lees this fall.
Reply With Quote
     
     
  #117  
Old Posted Jul 19, 2014, 7:41 PM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
Registered User
 
Join Date: Oct 2009
Posts: 189
Looks like the tarps are gone from all the overpass structures. It won't be long now!
Reply With Quote
     
     
  #118  
Old Posted Aug 4, 2014, 7:35 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
28 july 2014

Took these with the old cameraphone last week.. craptastic quality!





Reply With Quote
     
     
  #119  
Old Posted Aug 8, 2014, 11:36 PM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
Registered User
 
Join Date: Oct 2009
Posts: 189
Drove by the site today. Getting closer to opening now! The vertical supports for overhead signage have been installed on the 417 WB. They were doing the final paving on the 417EB off ramp this afternoon which was causing traffic headaches. Some roadside signs have been erected on the ramps and it's signed as exit 109.

The last bit of EB Hunt Club to WB 417 ramp isn't even paved yet.

Last edited by MaxHeadroom; Aug 8, 2014 at 11:51 PM.
Reply With Quote
     
     
  #120  
Old Posted Aug 9, 2014, 3:59 PM
1overcosc's Avatar
1overcosc 1overcosc is offline
Registered User
 
Join Date: Jun 2013
Location: Eastern Ontario
Posts: 12,377
109? Really? But it's at kilometre 108... The 108 marker is right at the overpass....
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 7:39 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.