Innes-Walkley-Hunt Club Connector | Phase 1 (Hunt Club to 417 Extension) Proposed

While this proposal is certainly not new, and has been mentioned before on this site, it is now looming on the horizon thanks to federal stimulus funding, and so should probably have it's own thread for further discussions.

One thing I find most interesting is how this is being positioned as a "parkway".

Innes - Walkley - Hunt Club Connection Environmental Assessment Study Recommendations:
http://www.ottawa.ca/calendar/ottawa/citycouncil/occ/2007/12-07/trc/ACS2007-PTE-POL-0070.htm





Reply With Quote
     
     
  #2  
Old Posted Nov 10, 2009, 3:29 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,777
I find it ironic how we can afford to spend a fortune on this when there was originally a plan to build rapid transit more or less following existing rail lines serving this same corridor. I travelled in this area today, and noted a sign for a major development at the corner of Walkley and Russell Road, which was a proposed rapid transit station location. Another opportunity lost and another victory of cars over transit.
Reply With Quote
     
     
  #3  
Old Posted Nov 10, 2009, 3:40 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,683
What is really ridiculous is the last diagram in that link, Document 8(b), which seems to show that the overpass over the 417 would need to be replaced for Phase 2!
Reply With Quote
     
     
  #4  
Old Posted Nov 10, 2009, 5:08 AM
Ottawan Ottawan is offline
Citizen-at-large
 
Join Date: Aug 2009
Location: Expat (in Toronto)
Posts: 738
As someone who grew up in the south-east part of Ottawa, Phase I of the plan is sorely needed and overdue. While the parkway concept certainly seems picturesque, from a practical perspective it really seems to just be duplicating the 417 at a great cost. If I need to go to Innes from Hunt Club after phase I is built, I'll take the 417 up two fairly quick exits, and come out on Innes only 1 - 2 kilometers further west.

Additionally, in earlier versions of this corridor available on the City website, the road was to connect directly to Blair. This would have been much more convenient for any northbound traffic, and I don't understand the realignment.

The ideal solution to me would be to build an extended phase one, which would create the interchange between Hunt Club and the 417, and then continue just a bit further to connect to Ramsayville just south of the CN tracks. That would be where the connection ends, and phase II would be unneccessary. When and if traffic on the 417 gets heavy enough, the province could widen it to six lanes.
Reply With Quote
     
     
  #5  
Old Posted Nov 10, 2009, 6:13 AM
Kitchissippi's Avatar
Kitchissippi Kitchissippi is offline
Busy Beaver
 
Join Date: Nov 2005
Location: Ottawa
Posts: 4,683
If a "parkway" is what is desired, it would be better to restyle Anderson Road into a 2-lane parkway, maybe by adding some scenic curves and landscaping as it goes up and down the drumlins by Mer Bleue. I think the NCC intended something here to connect to the Rockcliffe Driveway at one point and it could very well do that.

If Lester/Davidson/Whyte Side were treated in a similar fashion, a 2-lane scenic route could continue westward to the Airport as well without technically adding another new road.
Reply With Quote
     
     
  #6  
Old Posted Nov 10, 2009, 4:00 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
The project should be cancelled as it is unnecessary network duplication. Instead, although it would be an MTO project, Highway 417 in the area should be widened to 6 lanes. (Traffic counts currently warrant 6 lanes on Highway 417 to Walkley, and will by 2020 warrant 6 lanes to at least Anderson Road.) There are much better uses for city transportation money. (Phase 1 of Hunt Club should definitely go ahead though)

As for a transit project in the area, the ridership potential isn't great - and express buses would also work along Highway 417 and Innes Road (may require bus lanes there). I'd scrap the entire Phase 2 corridor and say "Do Nothing", while requesting a widened 417 from the MTO.
Reply With Quote
     
     
  #7  
Old Posted Nov 10, 2009, 5:49 PM
Dado's Avatar
Dado Dado is offline
National Capital Region
 
Join Date: Jul 2007
Location: Ottawa, Canada
Posts: 2,521
The proof of this not being a "parkway" is the inclusion of an overpass of the VIA (not CN) tracks (CN sold them to VIA; at the moment CN retains freight running rights over the tracks but not ownership). If it's a parkway designed for leisurely jaunts through the Greenbelt, then why have an overpass? Surely people out on a leisurely drive can wait a few seconds for a train to go by.

In Phase I there's also apparently no connection to Russell Road.

I agree that Phase I should just be extended to Ramsayville Road and leave it be after that.


As an aside, if you look at Google Earth you'll notice something odd in this area: the 417 crosses the former Ottawa & New York Rwy line at about the same place it crosses the Alexandria Subdivision and then it crosses it again just east of its crossing of Ramsayville Road, and for no apparent reason. It looks like whoever laid out the 417 through here was a tad tipsy at the time. They could have just threaded it between the two rail corridors in an alignment more-or-less parallel to the former Ottawa & New York. They also did a number on Russell Road (you can just see vestiges of where it used to go) - the 417 RoW adds something like a kilometre and a third to the former route.

http://maps.google.ca/maps?f=q&hl=en&geo...75.569286&spn=0.045215,0.077162&t=h&z=14
__________________
Ottawa's quasi-official motto: "It can't be done"
Ottawa's quasi-official ethos: "We have a process to follow"
Reply With Quote
     
     
  #8  
Old Posted Apr 6, 2010, 2:22 AM
alphachapmtl alphachapmtl is offline
Registered User
 
Join Date: Oct 2009
Posts: 28
Anything new?
I noticed work has started on Hunt Club near Hawthorne Rd.
Reply With Quote
     
     
  #9  
Old Posted Apr 16, 2010, 2:25 AM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
Registered User
 
Join Date: Oct 2009
Posts: 189
Quote:
Originally Posted by alphachapmtl View Post
Anything new?
I noticed work has started on Hunt Club near Hawthorne Rd.
The city is using federal stimulus funding to work on their share of the project, from Hawthorne to Russell Rd. Tomlinson has the contract. Sunday, I saw evidence of some earth work in the distance beyond the bus turnaround where Hunt Club now ends.

The funny thing is, the project has to be finished by March 31 2011 to qualify for the stimulus funding. I don't see a problem with that schedule, but the province's construction portion of the project, the interchange with the 417 and associated roadway as far as Russell Road, has not been funded. The province has funded the design of the interchange but nothing more. The City and Province agreed to this split of responsibility, but the City got tired of waiting and went ahead with the project despite the province dragging its heels.

So will we end up with a road that goes nowhere, since the new roadway is supposed to overpass Russell Road? Could be a very embarrassing situation for the provincial government.
Reply With Quote
     
     
  #10  
Old Posted Apr 16, 2010, 3:41 PM
eternallyme eternallyme is offline
Registered User
 
Join Date: Mar 2009
Posts: 5,243
Quote:
Originally Posted by MaxHeadroom View Post
The city is using federal stimulus funding to work on their share of the project, from Hawthorne to Russell Rd. Tomlinson has the contract. Sunday, I saw evidence of some earth work in the distance beyond the bus turnaround where Hunt Club now ends.

The funny thing is, the project has to be finished by March 31 2011 to qualify for the stimulus funding. I don't see a problem with that schedule, but the province's construction portion of the project, the interchange with the 417 and associated roadway as far as Russell Road, has not been funded. The province has funded the design of the interchange but nothing more. The City and Province agreed to this split of responsibility, but the City got tired of waiting and went ahead with the project despite the province dragging its heels.

So will we end up with a road that goes nowhere, since the new roadway is supposed to overpass Russell Road? Could be a very embarrassing situation for the provincial government.
Again, what they need to do is cancel the project. The Hunt Club extension and 417 interchange is badly needed, but the north-south segment is extremely wasteful. The MTO should just step in and widen the 417 to 6 lanes.
Reply With Quote
     
     
  #11  
Old Posted Apr 16, 2010, 4:30 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,033
NAFP?

(Not Another F***ing Parkway?)
Reply With Quote
     
     
  #12  
Old Posted Apr 16, 2010, 5:31 PM
TransitZilla TransitZilla is offline
Registered User
 
Join Date: Dec 2006
Posts: 2,799
Quote:
Originally Posted by eternallyme View Post
Again, what they need to do is cancel the project. The Hunt Club extension and 417 interchange is badly needed, but the north-south segment is extremely wasteful. The MTO should just step in and widen the 417 to 6 lanes.
The only project underway right now is the part that you say is badly needed, so I don't see the logic of cancelling it.

The 417-Innes section is not on anyone's radar right now- it's years away.
Reply With Quote
     
     
  #13  
Old Posted Apr 16, 2010, 5:40 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,777
If we really are serious about transit we should be connecting the Innes Road transit corridor with Walkley Road instead of building a semi-expressway next to the 417. That was the original plan.
Reply With Quote
     
     
  #14  
Old Posted Apr 16, 2010, 7:26 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,033
Quote:
Originally Posted by lrt's friend View Post
If we really are serious about transit we should be connecting the Innes Road transit corridor with Walkley Road instead of building a semi-expressway next to the 417. That was the original plan.
Dood, you know those expressways that are, like, double expressways?
Reply With Quote
     
     
  #15  
Old Posted Jun 17, 2010, 11:08 PM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
Registered User
 
Join Date: Oct 2009
Posts: 189
Went by the site again today. Unfortunately one can't see a whole lot from Hawthorne, but the road bed is beginning to take shape and they have some manholes going in. There was a lot more equipment on site, and also a crane on site in the distance.
Reply With Quote
     
     
  #16  
Old Posted Jul 20, 2010, 2:11 AM
MaxHeadroom's Avatar
MaxHeadroom MaxHeadroom is offline
Registered User
 
Join Date: Oct 2009
Posts: 189
Looking at the site from the 417 and Russell Road, there is plenty of grading going on and the road base is starting to take shape. Trucks are constantly coming and going from the site, using Russell Road as access. I'm still not sure what is going to happen at Russell Road; if the roadway is going to overpass it or temporarily intersect until the 417 interchange is built.
Reply With Quote
     
     
  #17  
Old Posted Jul 21, 2010, 12:23 PM
harls's Avatar
harls harls is offline
Mooderator
 
Join Date: Jan 2002
Location: Aylmer, Québec
Posts: 21,408
Yeah, I noticed they had done a lot of work on the road bed when I was on my way to Montreal one morning.. and this was back on the first weekend of July. (My vantage point was from the 417 travelling east just past the rail overpass).
Reply With Quote
     
     
  #18  
Old Posted Jul 21, 2010, 12:28 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
WHY do we need this, again?

__________________
I've always struggled with reality. And I'm pleased to say that I won.
Reply With Quote
     
     
  #19  
Old Posted Jul 21, 2010, 3:23 PM
DubberDom DubberDom is offline
Registered User
 
Join Date: Dec 2007
Location: Ottawa
Posts: 201
Quote:
Originally Posted by Aylmer View Post
WHY do we need this, again?


Why??? Are you serious? Ever try to go from Hunt Club to 417? It will also significantly improve the access from Orleans/Blackburn to the south and airport
Reply With Quote
     
     
  #20  
Old Posted Jul 21, 2010, 4:07 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,777
Quote:
Originally Posted by Aylmer View Post
WHY do we need this, again?

Just go to the intersection of Walkley and Russell Roads during the daytime. It is a bottleneck.

The Hunt Club extension will distribute this traffic onto two different roads and reduce the amount of left turns at the above intersection. The left hand turn lane from Walkley to Hawthorne/Russell has just been extended to almost two very long blocks. Too much traffic, not enough road capacity.
Reply With Quote
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Reply

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 5:43 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.