  #6821  
Old Posted Jun 6, 2014, 4:53 PM
djmk's Avatar
djmk djmk is offline
victory in near
 
Join Date: Sep 2008
Location: North Vancouver
Posts: 1,783
Nice! Great pic!
__________________
i have no idea what's going on
     
     
  #6822  
Old Posted Jun 6, 2014, 5:54 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Video from this morning at Lougheed showing that not much has visibly changed with regards to the guideway. They have rebar in place for pouring cement for the sides of the inbound guideway.

Whoever was complaining about the ugly concrete columns should be pleased to see them sanding away some of the grime that accumulated in the 14 years between original forming and the recent additions
     
     
  #6823  
Old Posted Jun 6, 2014, 8:12 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,584
Here's a May 25th pic by dpogue of Coquitlam Central Station - you can see Mainer Way overpass on the right:


https://plus.google.com/u/0/photos/10593...8664133015026/albums/5912605598382151729
     
     
  #6824  
Old Posted Jun 6, 2014, 9:11 PM
TransitFreak TransitFreak is offline
Registered User
 
Join Date: Oct 2009
Posts: 194
Given the picture from the annual report a few pages back with Production Way being the potential terminus station of the incumbent Millenium line route, one could make the case of right railing the 'Evergreen' line and Millenium line. The current switch configuration would allow the Coquitlam bound train to cross into the outbound (right side) guideway after Lougheed station. It would not interfere with the train from Braid too much as the frequency is expected to diminish for the train from Braid.

The inbound train from Burquitlam would now stay on the inbound (left side) guideway all the way to Lougheed and dwell at the 3rd platform. In essence you have a side platform loading station with a predominantly unloading centre platform for the train from Braid. So now your platform assignmnents would be:

Douglas Lafarge-Lake[====]Production Way/University||VCC-Clark[==]

Anyways, it's an option, it would resolve the whole wrong railing issue...
     
     
  #6825  
Old Posted Jun 6, 2014, 9:40 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,584
But passengers boarding a train @ Lougheed Station (i.e from a bus) destined for Production Way Station (and SFU) wouldn't know whether to wait at the 2nd/middle platform or the 3rd/north platform for the next train.

That was the whole reason for originally consolidating both westbound routes at the same 2nd/middle platform (i.e. if both Evergreen and M-Line were to be through-routed through Lougheed Station).

So arguably, the through routing of M-Line to Production Way Station, reinforces the need for the wrong-railing to get both westbound routes to a common platform.
     
     
  #6826  
Old Posted Jun 9, 2014, 5:29 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,076
Columns on the east side of Coquitlam Central station, taken on June 5th


The next 3 columns looking from the station toward the bus loop, taken on June 6th. The second column seems so low..


Column near Lincoln Station with extra high paddings
     
     
  #6827  
Old Posted Jun 9, 2014, 5:57 AM
TransitFreak TransitFreak is offline
Registered User
 
Join Date: Oct 2009
Posts: 194
Quote:
Originally Posted by officedweller View Post
But passengers boarding a train @ Lougheed Station (i.e from a bus) destined for Production Way Station (and SFU) wouldn't know whether to wait at the 2nd/middle platform or the 3rd/north platform for the next train.

That was the whole reason for originally consolidating both westbound routes at the same 2nd/middle platform (i.e. if both Evergreen and M-Line were to be through-routed through Lougheed Station).

So arguably, the through routing of M-Line to Production Way Station, reinforces the need for the wrong-railing to get both westbound routes to a common platform.
True, or with now the through routing, the need for a terminus platform for the millenium line is now not required, so in theory, the 3rd platform can now become westbound, both Braid and Burquitlam fed trains, current inbound would now serve Burquitlam bound trains, and the current outbound will service Braid bound trains, in order to remove wrong railing issue. Switches are currently in place to handle that movement.
     
     
  #6828  
Old Posted Jun 9, 2014, 7:18 AM
giallo's Avatar
giallo giallo is offline
be nice to the crackheads
 
Join Date: Apr 2002
Location: Vancouver
Posts: 12,704
This is pretty cool. It looks like local rapper Snak The Ripper filmed part of his video at an Evergreen Line construction site.


Video Link
     
     
  #6829  
Old Posted Jun 9, 2014, 10:50 AM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,584
Quote:
Originally Posted by TransitFreak View Post
True, or with now the through routing, the need for a terminus platform for the millenium line is now not required, so in theory, the 3rd platform can now become westbound, both Braid and Burquitlam fed trains, current inbound would now serve Burquitlam bound trains, and the current outbound will service Braid bound trains, in order to remove wrong railing issue. Switches are currently in place to handle that movement.
That would work - the only downside being the elimination of any Coquitlam <-> Braid cross platform transfers (one way or the other way).

Remember, from a passenger perspective, wrong railing isn't an "issue" (it's a bit like saying that stacked tunnels are an "issue" because the trains don't drive on the "right" side or that "twisted" transfer stations in some Metros are an "issue" because a platform doesn't have opposite directions for the same line on adjacent tracks).
     
     
  #6830  
Old Posted Jun 9, 2014, 9:47 PM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,076
They seems to be building a new down escalator for west entrance of Lougheed Station platform 1/2. The site where the "future escalator" is are hoarded up on both concourse and platform levels.
     
     
  #6831  
Old Posted Jun 9, 2014, 10:23 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,584
Quote:
Originally Posted by nname View Post
The next 3 columns looking from the station toward the bus loop, taken on June 6th. The second column seems so low..
Do you mean the cage in the background?
That's a cap sitting on the ground - Looks like it'll be placed on top of the column cage to the right.
     
     
  #6832  
Old Posted Jun 13, 2014, 6:01 AM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Didn't get any photos, but I did pass by Coquitlam Central today and noticed that they had several concrete beams going across the columns for the centre part of the station area.
     
     
  #6833  
Old Posted Jun 13, 2014, 7:26 AM
nname nname is offline
Registered User
 
Join Date: Aug 2005
Posts: 5,076
Quote:
Originally Posted by dpogue View Post
Didn't get any photos, but I did pass by Coquitlam Central today and noticed that they had several concrete beams going across the columns for the centre part of the station area.
Photo taken June 12th...











Not sure what are they doing with the spur..
     
     
  #6834  
Old Posted Jun 13, 2014, 11:19 AM
adrianroam95 adrianroam95 is offline
Registered User
 
Join Date: Aug 2010
Location: Coquitlam, BC
Posts: 214
Wow. Great pics.
     
     
  #6835  
Old Posted Jun 13, 2014, 12:34 PM
trofirhen trofirhen is offline
Registered User
 
Join Date: Oct 2008
Posts: 9,045
Wow, this is all coming along faster than I would have imagined! It's digging the tunnel that will take the most time, I think.
     
     
  #6836  
Old Posted Jun 13, 2014, 2:28 PM
dpogue dpogue is offline
Registered User
 
Join Date: Aug 2013
Posts: 766
Quote:
Originally Posted by nname View Post
Not sure what are they doing with the spur..
In the first and second photos you can see rebar to the right of the existing column. My guess is that will be for forming a column for the spur. If I recall, there only were 1 or 2 columns for the spur.
     
     
  #6837  
Old Posted Jun 13, 2014, 7:21 PM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Thanks for the pics nname!

I still don't understand the need for a spur since PoCo extension is a pipe dream. By the time the PoCo gets built, if ever, which should be after Broadway to Arbutus and all Surrey LRT lines are built (2030s), whatever tracks they put there would be so rusty, you might as well replace them. Its easier to just jackhammer a side of the guideway that would look pretty in decades, reconfigure the rails and link it when the time comes to extend.

But since its going to be there regardless of how I feel, I think they should try to make it look less of a spur. Perhaps make it part of a platform or something with a food cart or gift shop, add some temporary structure on top to hide it, and so on. The Lougheed Station spur prior to the Evergreen Line contruction has been such a huge pet peeve of mine, just couldn't stand it for over a decade...
     
     
  #6838  
Old Posted Jun 13, 2014, 7:46 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,584
But imagine if they hadn't built the spur at Lougheed and they had to single track the station now just to install the switches for the spur?

That's why they're doing it - to avoid the headache they experienced when they installed the switches for M-Line near SkyBridge - they had to run single track to Surrey to free up one side for construction.
     
     
  #6839  
Old Posted Jun 13, 2014, 7:49 PM
queetz@home's Avatar
queetz@home queetz@home is offline
Go Rotem! Die Bombardier!
 
Join Date: Jul 2001
Location: Ortigas
Posts: 3,679
Quote:
Originally Posted by officedweller View Post
But imagine if they hadn't built the spur at Lougheed and they had to single track the station now just to install the switches for the spur?

That's why they're doing it - to avoid the headache they experienced when they installed the switches for M-Line near SkyBridge - they had to run single track to Surrey to free up one side for construction.
But given the sheer amount of *discussion* that has gone throughout the years, and the whining and complaining about how the Lougheed guideways are turning up right now, I think such a headache is worth it for the long term so things will remain....pretty.
     
     
  #6840  
Old Posted Jun 13, 2014, 11:03 PM
officedweller officedweller is offline
Registered User
 
Join Date: Jul 2001
Location: Vancouver
Posts: 41,584
Investigation Report for that shifting guideway segment at Como Lake Road posted here.
It says the section was always intended to be part of a continuous span section, so there were no risers on top of the columns.

http://bobmackin.ca/?p=1798


++++++++++++

From the latest Community Bulletin:


http://www.evergreenline.gov.bc.ca/documents/CommunityUpdates/140610_CommunityUpdate8.pdf

Last edited by officedweller; Jun 13, 2014 at 11:27 PM.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Alberta & British Columbia > Vancouver > Transportation & Infrastructure
Forum Jump



Forum Jump


All times are GMT. The time now is 5:53 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.