HomeDiagramsDatabaseMapsForum About
     

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation


Closed Thread

 
Thread Tools Display Modes
     
     
  #961  
Old Posted Apr 21, 2014, 5:41 PM
Urbanarchit Urbanarchit is offline
Registered User
 
Join Date: Jun 2013
Location: Ottawa
Posts: 1,927
Quote:
Originally Posted by J.OT13 View Post
What if the O-Train (as LRT or DMV technology) crossed to Québec and looped through Hull back to Rideau with underground sections between Terrace de la Chaudière-Civilization and Beaux-Arts-Rideau.

This would not solve the lack of direct to downtown rapid transit for suburban Gatineau, but it would make for a much easier connection for residents on the Ontario side working in Qc. furthermore, this would solve the Airport-Downtown issue.
I don't know about the O-train going into Hull then to Rideau, especially as the O-train serves suburban Ottawa more. Instead there should be LRT that meets the O-train at Bayview but goes up through Hull to Rideau.
     
     
  #962  
Old Posted Apr 21, 2014, 5:48 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Why have it underground? There's an old rail RoW beside Laurier from Chaudière to the Museum, then it could run beside Laurier and turn onto the Alexandra. From there, the tracks can (at least initially) run on the old rail RoW and have a station under the Plaza Bridge, beside the Canal. If anything, I'd make Chaudière underground: using one of the five unused basements under the old EB Eddy factory, you'd already have an excavated concourse for a shallow station and we could finally breathe some life into a grand, heritage building. I figure that all you'd have to do is build some shallow tunnel ramps just to the west of the building and just to the east of Eddy St. (Chaudière Bridge), structurally reinforce the basement and fill in the levels below.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
  #963  
Old Posted Apr 21, 2014, 7:19 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Quote:
Originally Posted by defishel View Post
I don't know about the O-train going into Hull then to Rideau, especially as the O-train serves suburban Ottawa more. Instead there should be LRT that meets the O-train at Bayview but goes up through Hull to Rideau.
You mean Rapibus converted to lrt with the line splitting into 2; one line to Bayview and one line to Rideau via Hull Island? A variant of that would be ideal IMO, but since the Rapibus is brand new, conversion isn't an option for at least 30 years for financial reasons.

Quote:
Originally Posted by Aylmer View Post
Why have it underground? There's an old rail RoW beside Laurier from Chaudière to the Museum, then it could run beside Laurier and turn onto the Alexandra. From there, the tracks can (at least initially) run on the old rail RoW and have a station under the Plaza Bridge, beside the Canal. If anything, I'd make Chaudière underground: using one of the five unused basements under the old EB Eddy factory, you'd already have an excavated concourse for a shallow station and we could finally breathe some life into a grand, heritage building. I figure that all you'd have to do is build some shallow tunnel ramps just to the west of the building and just to the east of Eddy St. (Chaudière Bridge), structurally reinforce the basement and fill in the levels below.
E.B. Eddy Building has 5 basements!?

Looking at Google Maps, we could run the rail parallel to Laurier (maybe under new Windmill buildings) between the Chaudière Bridge and Civilisation, but once you hit the museum grounds, it would have to dive back underground until the Alexandra Bridge.

The major problem with the RoW along the Canal is that the Château Laurier tunnel was converted to a museum and then to committee rooms (or something to that effect). I'm not so sure converting it back to a rail tunnel would be all that simple.

The attractive thing with an underground station at Rideau is the simplified transfer to the Confederation Line and possible Rideau-Montreal subway as well as a direct indoor connection to the Rideau Centre complex (hotel(s) and Convention Centre), a very desirable attribute for a Airport-Downtown line.
     
     
  #964  
Old Posted Apr 21, 2014, 7:31 PM
Urbanarchit Urbanarchit is offline
Registered User
 
Join Date: Jun 2013
Location: Ottawa
Posts: 1,927
Quote:
Originally Posted by J.OT13 View Post
You mean Rapibus converted to lrt with the line splitting into 2; one line to Bayview and one line to Rideau via Hull Island? A variant of that would be ideal IMO, but since the Rapibus is brand new, conversion isn't an option for at least 30 years for financial reasons.
I wasn't thinking about Rapibus, but I don't think it would be very feasible for a train that helps suburbanites get to Bayview to downtown would be a good idea to run through Gatineau to Rideau. I think that line should be separate from one that runs through Hull, at the very least.
     
     
  #965  
Old Posted Apr 21, 2014, 7:48 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by 1overcosc View Post
In Toronto right now they're doing major work on the GO lines, including track widenings, bridge replacements, and new grade separations--and soon electrification. All while keeping service running.

The city didn't need to shut down the O-Train over the summer at all really. Shutdowns do make construction go faster & cheaper though (no need to work around actively running trains) so I suspect that's why the city went with it.
I don't think GO is facing deep rock cuts and tunneling under lakes.

"Soon electrification" - I guess my interpretation of soon is different from yours. Has that even been funded?
     
     
  #966  
Old Posted Apr 21, 2014, 8:05 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Yep, 5 basements down to the water table - apparently, the last one is very wet indeed.

As for the Museum, Laurier at that point is about six lanes wide (two large traffic lanes, one parking lane for tour buses and another parking lane), but there is very little need for so many. Assuming we're talking surface LRT and not S-Bahn O-Train, it would be easy to turn the two southernmost lanes into LRT. Tunnelling would be difficult because of the deep basements under the museum and its parking, plus the need to quickly rise out of the ground immediately afterwards to meet the Alexandra.

As for the Château Laurier, I figure the photography museum (is it still that?) would make for a beautiful station In all seriousness, I see the expropriation as much less cumbersome as a tunnel. A tunnel would, of course, be preferable, allowing, as you said, for a direct connection with the Confederation line.

Perhaps, another interesting option would be a shallow tunnel under the Château Laurier and the canal, resurfacing just south of City Hall. It would allow for a connection with a future Canal-Carling Line.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
  #967  
Old Posted Apr 21, 2014, 8:12 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
Photography Museum closed in 2006 to fix a leak and permanently closed in 2009 for conversion to committee rooms.
     
     
  #968  
Old Posted Apr 21, 2014, 8:14 PM
Uhuniau Uhuniau is offline
Registered User
 
Join Date: Jan 2010
Posts: 9,067
Quote:
Originally Posted by Aylmer View Post
As for the Château Laurier, I figure the photography museum (is it still that?) would make for a beautiful station In all seriousness, I see the expropriation as much less cumbersome as a tunnel. A tunnel would, of course, be preferable, allowing, as you said, for a direct connection with the Confederation line.
It's now committee rooms for the House of Commons. That can be fixed.

Not sure if they're there long-term, or until the Parliamentary swing-space is ready (the Wellington Building refit.)
     
     
  #969  
Old Posted Apr 21, 2014, 8:17 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Quote:
Originally Posted by J.OT13 View Post
Photography Museum closed in 2006 to fix a leak and permanently closed in 2009 for conversion to committee rooms.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
  #970  
Old Posted Apr 21, 2014, 8:18 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by J.OT13 View Post
lrt's friend,

1. I agree that the Airport should get direct to downtown service. We should have considered dual-mode trains to run diesel down south and electric between Bayview and the Belfast Yards to accommodate direct to downtown;
2. There were no tunnel plan following the N/S. The plan was to have a bunch of O-trains along existing rail lines running in suburban and rural areas of Ottawa, far from any urban areas;
3. The N/S might have been great for the south end, but they were planning on cutting service to the east and west end to accommodate your choo-choo train;
4. The current Confederation Line along with Stage 2 might not serve the suburban south end, but it will serve a huge swath of Central-Urban Ottawa, urban neighborhoods like Little Italy, Hintonburgh/Wellington West, Westboro;
5. The subway will be a HUGE improvement for downtown;
6. A good part of the south end (Barrhaven) is and will continue to be well served by BRT with a good transfer point to the future ORT;
7. A cheap, effective solution can be found for Riverside south. Either extending buses from Barrhaven to Riverside South or having bus lanes up to the O-Train.
1. Whatever it would take to provide service to the primary transit destination. But our planners have already discarded this option.
2. Yes there was a plan to connect the N/S route to the Confederation tunnel. Originally, there were connections to be roughed in at Bayview Station in order to eventually connect the two lines. Those connections were eliminated in order to bring in the project at the $2.1B budget. I think this was at the same time that the station at Confederation Square was moved eastward.
3. Service to the east and west (and south) was cut anyways. Many expresses were converted into feeder routes.
4. Your point being? I have already indicated that we have already spent $200M+ that could have been avoided. That will continue to increase when we expand the O-Train again, which is the plan. I think we could have achieved just as much, just as fast on the desired route.
5. I will repeat again that I don't oppose the subway and I understand its importance.
6. Barrhaven would have even been better served with access to rapid transit both east and west of the Rideau River. This would have happened if the N/S LRT route had opened. As it stands, the lowest transit modal share is in the southern suburbs including Barrhaven. Are we really effectively addressing this? The fact also remains, that rail transit to Barrhaven was affordable on the N/S route and not affordable on the Confederation Line route.
7. The 94 bus will cross the Strandherd-Armstrong Bridge and turn around at the Park n Ride lot next to River Road. If you live in Riverside South, most will have to make another transfer to use it. An improvement over the status quo if you want to go to the west end, but to go downtown???? So you also recommend abandoning an O-Train extension? How much more money are we going to spend on a Transitway extension or bus lanes or whatever from South Keys to Riverside South. I still don't understand building all these park n ride lots that will lose direct service to downtown. It seems they will lose a good part of their effectiveness in attracting transit riders when direct service is eliminated. But according to the majority here, what's one, two, or even three transfers. After all, you will only wait 1 minute at each transfer or is it 5 minutes or 10 minutes or 15 minutes or 20 minutes depending on where you are transferring and at what time of day?
     
     
  #971  
Old Posted Apr 21, 2014, 9:11 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by acottawa View Post
I don't know, the number of cities that have a direct rail-based public transit link (as opposed to some sort of specialized airport service) between the main airport and city centre is pretty small: e.g. Chicago, Vancouver, San Francisco, Athens, Paris, London (depending on where one thinks the city centre is). Most either require some sort of bus (Montreal, Toronto, Dulles, Dublin, LA, Berlin) at least one transfer (Rome, New York, Boston, Barcelona) or an intercity train (Amsterdam, Brussels)

I don't think when the LRT is compete it would be obvious to a visitor that they were in a barren location at Bayview (they would be inside a station following signs between the o-train and the confederation line).

That being said, I'm skeptical of the value of a rail service in a city of Ottawa's size when the road connections are good - for people in a hurry a taxi can beat almost any rail-based option downtown and people trying to save money aren't going to be looking for a premium service.
Portland Oregon has direct service (I have used it) and if my memory serves me correctly so does Zurich Switzerland. Atlanta has direct service (I was just there and saw the MARTA trains). Doesn't Washington Ronald Reagan airport have direct service by subway? Aren't they currently building a line that will eventually reach Washington Dulles Airport? Toronto will join the crowd in 2015. Dallas is currently building a rail line to the airport. Aren't there projects under construction in Denver and Salt Lake City to connect the airport?

I think my point is clear. Progressive cities are now providing or planning direct rail service between the airport and downtown. Other cities are doing so by direct bus lines and their are countless cities doing this.

Ottawa will be one of the minority that will cut direct service.
     
     
  #972  
Old Posted Apr 21, 2014, 9:24 PM
Catenary Catenary is offline
Registered User
 
Join Date: Dec 2012
Posts: 1,402
Quote:
Originally Posted by lrt's friend View Post
2. Yes there was a plan to connect the N/S route to the Confederation tunnel. Originally, there were connections to be roughed in at Bayview Station in order to eventually connect the two lines.
The only way it makes sense to allow through running from the Ellwood Sub to the Confederation Line would be to eliminate Bayview station or move it east past the junction. If the O-Train were to continue downtown and the station remained where it is, passengers waiting to board at Bayview would have to choose the upper or lower platform depending on the next train.
     
     
  #973  
Old Posted Apr 21, 2014, 9:54 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
Quote:
Originally Posted by Catenary View Post
The only way it makes sense to allow through running from the Ellwood Sub to the Confederation Line would be to eliminate Bayview station or move it east past the junction. If the O-Train were to continue downtown and the station remained where it is, passengers waiting to board at Bayview would have to choose the upper or lower platform depending on the next train.
Having different platforms used to be a big problem (just ask Lower Bay Station in Toronto) because it was always a guessing game as to where the next train was going to come: apparently, people in Bay Station actually waited in the stairs between the two platforms to avoid missing their train!

However, with screens and real-time arrival information, it's easy to indicate where the next downtown-bound train is going to arrive.

When I lived in Aachen, I took the train for short hops along the trunk line (which had a train every 5-10 mins, one of which, incidentally, is the one featured in the picture below), but there were many tracks (about 12 different ones at the main station). It was an easy matter of quickly glancing at signs like these to determine where my train was going to arrive.



If we were to have a four-platform Bayview station, we could have similar signs which indicate prominently which platform where the next train will be (platform 1 or 2).

I'm not advocating an interlining Bayview, but I'm just saying that it could be done easily nowadays.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
  #974  
Old Posted Apr 21, 2014, 10:27 PM
J.OT13's Avatar
J.OT13 J.OT13 is offline
Moderator
 
Join Date: Mar 2012
Location: Ottawa
Posts: 28,916
On the one hand, yes it might complicate things for someone heading from Bayview towards downtown. I personally would likely just stick with the same platform; waiting a few extra minutes won't kill anyone. On the other hand, two different platforms would simplify the trip for people heading south or west. If you commonly use Bayview (or even just pay attention to the signage or platform orientation) you would know that the upper platform heads west and the lower towards south.

If anything, two platforms would be great for splitting high passenger volume to two areas, especially if Bayview ever becomes a transfer station for the STO.
     
     
  #975  
Old Posted Apr 21, 2014, 10:37 PM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
If Bayview were to permit the O-Train to turn south, I would hope that it would also allow for a train to turn north towards Gatineau.
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
  #976  
Old Posted Apr 21, 2014, 10:53 PM
Richard Eade Richard Eade is offline
Registered User
 
Join Date: Mar 2008
Location: Nepean
Posts: 2,637
Here’s an idea: If there is so much built-up transportation demand that the City needs to twin the Airport Parkway; and if sending every second O-Train to the airport on a spur would reduce the capacity to Riverside South by too much; why not build the O-Train extension along the Airport Parkway – and NOT twin it for cars?

As I understand it, the current plan is to twin the Parkway so that twice as many cars can race north from Hunt Club and Riverside South areas – only to hit the Glebe and congestion along Bronson. There is also a plan to extend the O-Train, along an existing right of way, south PAST the airport into Riverside South. In order to extend the O-Train, though, the existing rail bed must be rejuvenated and the rails must be replaced with new, continuous (welded) ones. A future spur will be added into the airport, but every train that turns to go to the airport is one less train that goes to Riverside South.

OK, I suggest that the City doesn’t spend tens of millions to expand the road capacity just to handle the rush-hours and instead uses that money plus the money that would have been used to recondition and upgrade the existing tracks between South Keys and the airport spur, and put that money into putting the E&Y Centre, the airport, and the hotel directly on the O-Train line that goes all the way to Riverside South. Every train goes to all destinations, and the demand for transportation into the city is handled by train instead of cars.




In the above diagram, the blue line represents the planned O-Train extension path; the red line is an alternate routing; and the fuchsia line, of course is common to both configurations. The red line is about 50% longer (3.5 km vs. 2.4 km), but the additional cost would be off-set by the savings from not twinning the Airport Parkway. If we are willing to bend the Confederation line north of the Rideau Centre, why can’t we also bend the O-Train over to the airport lands?
     
     
  #977  
Old Posted Apr 21, 2014, 11:42 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Richard:

I do hope that the O-Train alignment is a whole lot closer to the terminal than shown. If that is where it will be, we will need a shuttle bus between the terminal and the O-Train anyways. To be useful, the train needs to come right next to the terminal. Your alignment is way out next to the cargo offices and that is not at all a pedestrian friendly area.
     
     
  #978  
Old Posted Apr 21, 2014, 11:48 PM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by Catenary View Post
The only way it makes sense to allow through running from the Ellwood Sub to the Confederation Line would be to eliminate Bayview station or move it east past the junction. If the O-Train were to continue downtown and the station remained where it is, passengers waiting to board at Bayview would have to choose the upper or lower platform depending on the next train.
Yes, the original plan was to have Bayview station further east where the two tracks met. What we done to save money in the short run makes it more difficult to integrate the two lines in the future.
     
     
  #979  
Old Posted Apr 22, 2014, 12:00 AM
Aylmer's Avatar
Aylmer Aylmer is offline
Still optimistic
 
Join Date: Nov 2007
Location: Montreal (C-D-N) / Ottawa (Aylmer)
Posts: 5,407
I think it would be rather easy to run the tracks on the old rail alignment (north of Research Road - you can still see its outline by the trees), then make a shallow trench to pass under Canadair Private Rd, across the surface parking lot north of the parkade, then between the parkade and the terminal. A shallow station could be built there with little need for disruption and at low cost and it would easily connect with the airport via a short underground walkway that would lead straight into the baggage area.

From there, cut and cover under the parking lot south of the parkade and the E-W runway, resurfacing north of Alert Rd (beside the snowclearing equipment sheds. From there, south to Riverside
__________________
I've always struggled with reality. And I'm pleased to say that I won.
     
     
  #980  
Old Posted Apr 22, 2014, 12:03 AM
lrt's friend lrt's friend is offline
Registered User
 
Join Date: Dec 2006
Posts: 12,792
Quote:
Originally Posted by Aylmer View Post
If Bayview were to permit the O-Train to turn south, I would hope that it would also allow for a train to turn north towards Gatineau.
My comment about the N/S line turning into downtown would also apply to a Gatineau route.

This is why I further thought that the original surface line would be useful in addition to the tunnel. Having two lines running from the west into downtown would better support the extra traffic coming from the south and the north without compromising train frequency on the busier east-west route. I recall that the original studies indicated that the tunnel could not handle Gatineau passengers in the long-term.

Despite other comments made in the last day or two to try to justify a continuous north-south route through Bayview, I still believe that the vast majority of the passenger traffic will be heading downtown and that justifies a transfer free trip. For the minority of the traffic on the north-south route wanting a through trip, a transfer seems reasonable.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Ontario > Ottawa-Gatineau > Transportation
Forum Jump



Forum Jump


All times are GMT. The time now is 10:57 AM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.