Old Posted Apr 8, 2014, 8:41 PM
Riverman's Avatar
Riverman Riverman is offline
Fossil fuel & rubber
 
Join Date: Feb 2009
Location: Ontario's feel good town
Posts: 4,031
Quote:
Originally Posted by trueviking View Post
reeeeeaaaaallllly?

Was just in the basement of the designers building, so yep.
     
     
  #2642  
Old Posted Apr 8, 2014, 8:43 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,042
Quote:
Originally Posted by Riverman View Post
Was just in the basement of the designers building, so yep.
.......aaaaaand?
     
     
  #2643  
Old Posted Apr 8, 2014, 8:55 PM
tekgeek tekgeek is offline
Registered User
 
Join Date: Jun 2013
Posts: 8
Hello, been a longtime follower of this site, and have to say it is very informative!

Was out for a walk at lunch today downtown and noticed some activity a DCondo site. Excavation and a few worker mulling around. Looks to me to be Hydro/gas lines or something like that.
     
     
  #2644  
Old Posted Apr 8, 2014, 8:59 PM
Cyro's Avatar
Cyro Cyro is offline
Registered User
 
Join Date: Jan 2013
Posts: 5,197
Quote:
Originally Posted by tekgeek View Post
Hello, been a longtime follower of this site, and have to say it is very informative!

Was out for a walk at lunch today downtown and noticed some activity a DCondo site. Excavation and a few worker mulling around. Looks to me to be Hydro/gas lines or something like that.
Welcome tekgeek, thanks for the update...enjoy the forum,,

__________________
♥ ♥
     
     
  #2645  
Old Posted Apr 8, 2014, 9:00 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,042
^workers mulling is very good...thanks.

and welcome aboard!
     
     
  #2646  
Old Posted Apr 8, 2014, 9:33 PM
Riverman's Avatar
Riverman Riverman is offline
Fossil fuel & rubber
 
Join Date: Feb 2009
Location: Ontario's feel good town
Posts: 4,031
Quote:
Originally Posted by trueviking View Post
.......aaaaaand?
That's it. While I don't know a lot about drilling rigs, this one is not a directional boring machine like you see all over but rather one with a vertical derrick. Most of the time rigs this size are truck-mounted but this one was stand-alone.
     
     
  #2647  
Old Posted Apr 9, 2014, 12:45 AM
Jack1983 Jack1983 is offline
Registered User
 
Join Date: Dec 2009
Location: Winnipeg
Posts: 128
Quote:
Originally Posted by Riverman View Post
That's it. While I don't know a lot about drilling rigs, this one is not a directional boring machine like you see all over but rather one with a vertical derrick. Most of the time rigs this size are truck-mounted but this one was stand-alone.
Don't get to excited... Manitoba Hydro is building a new substation on that property. This is just the geotechnical investigation. There are hydro workers on the site with the drill rig. If you look on MERX now there is a RFP for the design of the wall:
http://tinyurl.com/pfepmvo

Hopefully it is prettier than the burrows street substation.

Calvary temple still wants parking so we may see a "new" parking lot spring up somewhere in the area.
     
     
  #2648  
Old Posted Apr 9, 2014, 1:46 AM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,829
Interesting how this substation is coming in under the radar, as far as I can see it is not in the Manitoba Hydro Consolidated Capital Expenditure Forecast that is filed with the PUB for the years 2012 - 2032.

I believe that it is either a replacement for the King St station or an addition to capacity to replace the one that was proposed to go in a heritage building in the exchange.

The only new one that is budged for that area is on William Ave next to the Health Sciences new powerhouse on land Hydro already owns. That was suppose to be part of the upgrade of electrical service to the HSC complex.

The other thing I am surprised at is that they want to build a traditional substation. Manitoba Hydro has been putting in a lot of the Distribution Supply Centers instead of substations.

These are basically pad mount transformers and other control units which perform the same as a traditional substation but don't have the look of a substation with the overhead steel distribution poles and beams.

They are putting 4 or 5 of them in the Bridgewater Forest development instead of a regional substation, replaced the traditional substation by the UofM off Pembina Hwy with one as well as other numerous locations in the rest of Manitoba.
     
     
  #2649  
Old Posted Apr 9, 2014, 1:57 AM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,829
Quote:
Originally Posted by Jack1983 View Post
Don't get to excited... Manitoba Hydro is building a new substation on that property. This is just the geotechnical investigation. There are hydro workers on the site with the drill rig. If you look on MERX now there is a RFP for the design of the wall:
http://tinyurl.com/pfepmvo

Hopefully it is prettier than the burrows street substation.

Calvary temple still wants parking so we may see a "new" parking lot spring up somewhere in the area.
The Burrows look is the model for the new Martin Ave substation and I believe was shown as the look for the new St. James station on Madison off of Ellice.

Hydro according to their 2012 annual report sank the Burrows substation yard in the ground in an attempt to reduce the visibility of the station equipment to the surrounding community.
     
     
  #2650  
Old Posted Apr 9, 2014, 2:21 AM
roccerfeller's Avatar
roccerfeller roccerfeller is offline
Registered User
 
Join Date: Jul 2010
Location: BC
Posts: 2,932
Quote:
Originally Posted by trueviking View Post
also:

downtown population changes:
1941 - 15,500
1966 - 8,700
1986 - 11,000
2006 - 13,400
2014 - 16,000
Quote:
Originally Posted by trueviking View Post
also: when glasshouse and D condo start construction (both imminent) there will be almost 900 units under construction in downtown, which will add another 1500 people to the downtown population.

when those units are complete, Winnipeg will have added the equivalent of 19, 15-storey residential towers to downtown since 2005.
Wow that is fantastic. That last point really puts it in perspective nicely. Hopefully it's a trend that keeps moving forward.

Quote:
Originally Posted by trueviking View Post
I heard the tower was a 15 storey hotel when it finally died...anything else would be up to the new developer....a high end hotel is being shopped so it would have to be something less than terrible.

i definitely think selling the property to a more active developer would help.

at this point i'm happy with anything to be honest....a hotel would be perfect in my opinion.
Awesome, thanks tv. I really hope it ends up being stellar whatever it is. Though, if it now will have a better chance of development then fantastic. That is one lot that needs something on it.
     
     
  #2651  
Old Posted Apr 9, 2014, 2:39 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,908
Quote:
Originally Posted by cllew View Post

I believe that it is either a replacement for the King St station or an addition to capacity to replace the one that was proposed to go in a heritage building in the exchange.

The only new one that is budged for that area is on William Ave next to the Health Sciences new powerhouse on land Hydro already owns. That was suppose to be part of the upgrade of electrical service to the HSC complex.
This is a replacement for the King St Station. A few years back Hydro had plans to gut a block of Exchange heritage buildings for a new station that met a huge opposition. This is the solution that was found. I feel that it is a good compromise to what could have been a disaster for the exchange.

The substation planned for HSC has been delayed for a few years as they have found an interim solution for the area needs.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
     
     
  #2652  
Old Posted Apr 9, 2014, 3:16 PM
trueviking's Avatar
trueviking trueviking is offline
surely you agree with me
 
Join Date: Sep 2004
Location: winnipeg
Posts: 15,042
hopefully its nicely designed at least.
     
     
  #2653  
Old Posted Apr 9, 2014, 3:39 PM
Riverman's Avatar
Riverman Riverman is offline
Fossil fuel & rubber
 
Join Date: Feb 2009
Location: Ontario's feel good town
Posts: 4,031
Quote:
Originally Posted by Jack1983 View Post
Manitoba Hydro is building a new substation on that property.

Do you know why the one on Burrows took so many years to complete?
     
     
  #2654  
Old Posted Apr 9, 2014, 3:59 PM
Biff's Avatar
Biff Biff is offline
What could go wrong?
 
Join Date: Jun 2004
Location: Winnipeg
Posts: 9,908
Quote:
Originally Posted by trueviking View Post
hopefully its nicely designed at least.
RFP for Design Consultant closes Apr 17.
__________________
"But a city can be smothered by too much reverence for its past. The skyline must keep acquiring new peaks, because the day we consider it complete and untouchable is the day the city begins to die." - Justin Davidson - May 2010 Issue of New York
     
     
  #2655  
Old Posted Apr 9, 2014, 4:25 PM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,522
Quote:
Originally Posted by Riverman View Post
Do you know why the one on Burrows took so many years to complete?
because it was not just a substation it was the whole area got upgraded. and switched over from rover st
     
     
  #2656  
Old Posted Apr 9, 2014, 10:26 PM
cllew cllew is offline
Registered User
 
Join Date: Feb 2012
Posts: 4,829
Quote:
Originally Posted by 1ajs View Post
because it was not just a substation it was the whole area got upgraded. and switched over from rover st
The new Burrows substation still gets fed from Rover Terminal, new duct line was run down Sutherland Ave to feed it, This station replaces two obsolete substations: Alfred Station (next to Burrows station) and Charles Station (behind Cropo Funeral Home).

These two stations were identified as being obsolete when Manitoba Hydro did its due diligence investigation before buying Winnipeg Hydro.

Probably two of the reasons Winnipeg Hydro was sold as there is a lot of money needed to fix up the old Winnipeg Hydro system to modern standards.

Even the Rover terminal is getting the 100 year old supply lines replaced from just outside Birds Hill through North/East Kildonan / Elmwood.

Gone will be the ugly two sets of steel towers replaced with a single wood pole transmission line.
     
     
  #2657  
Old Posted Apr 11, 2014, 12:42 AM
bejb bejb is offline
Registered User
 
Join Date: Mar 2013
Posts: 23
Posted to H5 Architecture's facebook page

sited at 184 Sherbrook St.



https://www.facebook.com/h5architecture/
     
     
  #2658  
Old Posted Apr 11, 2014, 1:05 AM
1ajs's Avatar
1ajs 1ajs is offline
ʇɥƃıuʞ -*ʞpʇ*-
 
Join Date: Jul 2005
Location: lynn lake
Posts: 26,522
kool

anyhow

the city posted on their twitter a survay related to 2015 budget planning if anyones interested https://www.surveymonkey.com/s/CoW_BudgetConsultProcessInput
     
     
  #2659  
Old Posted Apr 11, 2014, 5:24 PM
bomberjet bomberjet is offline
Registered User
 
Join Date: Nov 2012
Location: Winnipeg
Posts: 16,318
Looks like the Reenders extension will not be completed until next summer, by end of 2015 construction season. Was to be completed this summer. And I also assume the closing of Almey at Lag, which was to take effect January 1, 2015, will be delayed until 2016. The new Transcona Blvd (Kildare west extension) will be completed this summer.

Report item no. 7
http://www.winnipeg.ca/CLKDMIS/ViewDoc.asp?DocId=13494&SectionId=&InitUrl=
     
     
  #2660  
Old Posted Apr 12, 2014, 12:57 PM
plrh plrh is offline
Registered User
 
Join Date: Apr 2012
Location: Winnipeg
Posts: 946
Anyone seen this before?
http://winnipeg.ca/clkdmis/ViewDoc.asp?DocId=13493&SectionId=&InitUrl=

Under Report 15 and Public Hearing 2, for the sugar beet lands.

I heard a rumour last summer but I didn't tell anyone.
     
     
This discussion thread continues

Use the page links to the lower-right to go to the next page for additional posts
 
 
Closed Thread

Go Back   SkyscraperPage Forum > Regional Sections > Canada > Manitoba & Saskatchewan
Forum Jump



Forum Jump


All times are GMT. The time now is 8:45 PM.

     

Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2026, vBulletin Solutions, Inc.